錨出水 的英文怎麼說

中文拼音 [máochūshuǐ]
錨出水 英文
uanchor
  • : 名詞(鐵制的停船設備) anchor
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  1. The bilge water of fore chain locker is discharged by one independent bilge hand pump ( cs ? 32h )

    艏部鏈艙的艙底由單獨設置的1臺艙底手搖泵( cs ? 32h )排
  2. Unshackle the port anchor from the chain before three o - ' clock afternoon

    鏈到
  3. This kind of adglutinate mixed with u expansion admixture can grip anchor bolts tightly even underwater, as can be seen from the pull - out type tests for anchor bolts when the mortar age is over 10 days. ( 2 ) the author lays the supporting piles as a arched shape

    將摻加了u型微膨脹劑的砂將作為下膠結物,由桿齡期10天的抗拔試驗結果可以看,這種膠結物的握裹效果很好。
  4. Based on the construction and development of rizhao port area in rizhao port in recent years and combining the " 11 ( superscript th ) five - year plan " on ports, this paper analyzes the key problems concerning navigable water area, expounds the necessity of readjustment and extension of the anchorage area, and proposes relevant construction plan

    摘要結合日照港日照港區近幾年的建設與發展以及港口「十一五」規劃,研究分析港口通航域面臨的突問題,提調整和擴建地的必要性及其建設方案。
  5. However, along with the increasing of construction quantity of the infrastructure of irrigation works, traffic, communication etc., newer and higher requirement of geotechnical anchoring are made in slope, major dam, bridge, tunnel, deep foundation ditch engineering and the construction engineering such as anti - capsize, anti - float, anti - slippage engineering of the buildings. for example, self - intension of rock and soil is required to exploit better ; carrying capacity of anchor increase according to anchoring length ; anchor should be sufficiently lasting and should not influence the exploitation of adjoining stratum

    但另一方面,隨著我國利、交通、通訊等基礎設施建設力度的加大,邊坡、大壩、橋梁、隧洞、深基坑以及建築結構物的抗傾倒、抗浮力、抗滑移等建設工程將對巖土固提一些新的和更高的要求:如要求進一步調用巖土體的自身強度,桿應具有足夠的耐久性,桿的使用應不影響周邊地層的開發等。
  6. The heat of the bodhisattva will often be so great that one will drip sweat from one ' s forehead or down one ' s back as the kundahlini flares while releasing karma, or anchoring space for an event or healing session

    菩薩級提升者經常會如此大量地汗,當昆達里尼在釋放業力或為一次活動及療愈會議定空間而暴燃時,汗甚至會滴落前額或洇濕後背。
  7. During the 3d finite element calculation, try to simulate different procedure of the construction ( like sunk well in - filling, main cable erection, box girder hoist, bridge flooring and opening to traffic ). and then, reveal the regulation of deformation and displacement on the foundation and soil during different period. after got these, this thesis put great attention on the analysis of the reason which cause the horizontal displacement of the cable saddle, as well as the regulation of the pressure ' s changing in the soil located on the front side of the sunk well foundation

    在三維有限元計算中,對不同工況(沉井充填、體澆築、主纜架設、箱梁吊裝、橋面鋪裝以及通車運營)下的施工過程作了模擬,全面揭示了各工況下碇沉井基礎與地基土的變形變位規律,著重分析了影響散索鞍平位移的因素以及不同工況下沉井前測地基土平向抗力變化規律,並提了不同深度地基土平向抗力與平位移間的擬合關系。
  8. Citing five - meter - high nanfei river rubber dam in hefei, one of the highest double - anchor water rubber dam in china as an example, while deeply analyzing some representative rubber dam projects in china, the article theoretically exploits the relationships among some technical parameters such as anti - pull intensity, internal pressure ratio, circum - oriented relative extending rate, etc. also has the author brought up his own opinion on rubber dam design & calculation theory, which is of high theoretical and applicative value for parameter optimization and combination of water rubber dam with a height of above 3. 5 meters. it also helps when building over - five - meter - high rubber dam using seamless rubber dam and rubber dam with steel wire as its frame. this article also exploits safety measures for designing & building rubber dam in navigation areas

    本文以充式雙固橡膠壩目前國內最高(壩高5m )之一的合肥市南淝河橡膠壩工程為例,並在對全國目前已建橡膠壩代表工程進行深入分析的基礎上,對壩袋的抗拉強度、內壓比、環向相對伸長率等技術參數之間的關系進行了理論探討和研究,並對橡膠壩設計計算理論提了自己的見解和看法,對指導設計壩高3 . 5m以上的充式橡膠壩技術參數的優化組合具有重要的理論和應用價值,特別對應用無搭接縫橡膠壩、鋼絲網骨架橡膠壩建造壩高大於5m的橡膠壩具有指導意義。
  9. Before that, we had got the treasure stowed, and had shipped enough water and the remainder of the goat meat, in case of any distress ; and at last, one fine morning, we weighed anchor, which was about all that we could manage, and stood out of north inlet, the same colours flying that the captain had flown and fought under at the palisade

    我們在島上無需再做什麼了,我們把財寶裝上了船,貯備了足夠的淡,把剩餘的山羊肉也帶走了,以防萬一。在某天早上,我們一切都準備妥當,終于起登程,把船駛北汊。這面曾被船長升上屋頂且在其下同敵人作戰的旗子又重新迎風飄揚在我們上空。
  10. Through inversion analyzing the results of inspection and observation which was applied the multipoint displacement measures and the drilling anchor stress measures to the top surface in the xianggui gypsummine eastern workings, this article will attempt to propose the deformation law of stope terrane after the underwater mine area, which provided a reliable basis for taking measures to control the strata movement

    摘要為了研究湘桂石膏礦的巖體變形規律,對該礦東采區頂板巖孔多點位移計觀測和鉆孔桿應力計檢測的結果進行綜合反演分析,提下礦區開挖后采場巖層的變形規律,為採取有效措施控制巖層移動提供了依據。
  11. Introduced by prestressed pier in the gate of spillway in xiao xia hydroelectric power station, the text reasonably established 3 - d finite elements mechanic model by the advanced finite elements popular in the world which can expediently impose tension of anchor funicular at its place. it also considered possible diversified combination of loading, and indicated that the effect of its prestressed action is fruitful compared with its conventional counterpart by study of mechanic calculation in comparison. as a result, it vastly improved burdening state of pier. by analysis of 3 - d finite element method, it also gained the stress result indifferent boundary conditions such as breast wall joint support and fixed support, and the displacement result in diversified loading combination. those results gained the instructive and reference value in design of prestressed pier

    本文結合黃河小峽電站泄洪閘預應力閘墩這一工程實踐,採用國際上已成熟的有限元方法,合理地建立了預應力閘墩的三維有限元模型,該模型可方便地按預應力索的點位施加索預張拉力,考慮了可能發生的多種荷載工況組合,並與無預應力閘墩結構進行了對比分析研究,指其預應力效果是明顯的,可以大大改善閘墩結構的受力狀態,通過三維有限元分析,還得到了胸墻簡支、固端不同情況下的應力成果和各荷載下的位移成果,這些成果的取得對預應力閘墩的設計具有一定的指導和參考價值。
  12. This paper presents analysis on the engineering geologic features, cause of revival and prediction of the developing trend of the captioned landslide in zigui county, together with the proposed treatment measures, which will be of reference value for other landslide treatment practices

    摘要在論述三峽庫區秭歸縣歸州四號滑坡工程地質特徵、復活原因、後期變化趨勢的基礎上,提滑坡治理方案,進行預應力索抗滑樁、樁間檔土板、植被護坡、地面排等分項工程設計,總結本滑坡治理工程的設計經驗,供其它滑坡治理工程參考。
  13. This article, takes some project for landslip in a small district in zunyi for example, tells you the useful experience of water proof, sueface prevention structure and sticking of the surfaces of mountain slopes, and so on

    摘要文章以遵義小區某滑坡治理工程為例,介紹了滑坡治理中有效解決坡面防、護面結構與坡面的粘結等問題的實踐經驗,提桿支護、掛網噴砼、坡腳擋墻襯護、噴面邊界澆築連系梁的綜合治理措施。
  14. The third chapter, by the given handling area in the vlcc anchorage in the port guangzhou, analyses the anchoring methods with the theory of navigation and the mathematic model, lists the different methods in the different sea conditions and forward how to avoid dragging

    第3章是結合廣州港大型油輪地過駁的域條件,運用操船理論和數理方法對卸油船地雙舷過駁的拋方法進行了分析研究,提了在不同海況條件下的拋優化方案,闡明了防止走的一般措施和關鍵措施。
  15. The seventh chapter, according to the characteristics and safety requirements during large crude oil carriers lighting by double sides, advises respectively the administration and port operators how to monitor the operation as for the organization, application, and approval

    第7章是根據地雙舷過駁作業的特點和安全管理要求,分別對過駁作業域主管機關和港口經營人就過駁作業的組織、原則、申請、審批、監護等提了確保油輪過駁安全的監督管理的有關建議。
  16. The sun had just set, the sea breeze was rustling and tumbling in the woods, and ruffling the grey surface of the anchorage ; the tide, too, was far out, and great tracts of sand lay uncovered ; the air, after the heat of the day, chilled me through my jacket

    太陽剛剛落下去,海風颯颯地掠過樹林,吹動著地灰色的面潮也遠遠地退下去了,露了一大片沙灘在白天的炎熱消退之後,冷空氣透過我的外衣侵襲著我的肌膚。
  17. The emphasis is given on the studying of the horizontal displacement on the retaining structure consist of piles and anchors, which is a frequent type of retaining structure. it is founded that the rigidity of anchors and magnitude of pre - stress are the main factors which influence the deformation of retaining structures. the optimal design method on pile - anchor systems is presented

    支護是一種常見的基坑支護模式,本文以樁支護結構平位移為重點,對支護結構剛度、支撐剛度與預應力、支護樁入土深度等對樁頂平位移的影響進行了分析,指在樁支護體系中,桿支撐剛度及預應力對基坑變形的影響最為明顯,並通過工程實例加以驗證。
  18. The flexible retaining structure is another important retaining structure in soft soil. the integrated numerical analysis of this retaining structure ( including the methods and theory of calculating active earth pressure under sorts of conditions as well as the calculating method of horizontal stiffness coefficient of bracing structure and the method of deciding boundary condition etc. ) was gived. the effect of all parameters on the characteristics of retaining structure was discussed using methods of sensitivity - analysis

    本文針對目前常用的彈性支點法,給了完整的數值分析方法,包括各種條件下的墻後土壓力的計算方法和原理、支撐系統(或拉系統)平剛度系數的計算、邊界條件的確定方法等,並以此為基礎採用靈敏度系數分析方法討論了各參數對圍護結構形態的影響,指土體側向基床比例系數是影響圍護結構變形的最主要的參數。
  19. Through these studies and analysis, following conclusions could be drawn : ( 1 ) it is necessary to study on harness engineering of landslide and dangerous rock since the main representations of this geological hazard are landslide and dangerous rock through geological investigation ; ( 2 ) it can be concluded though stability analysis that the dingzhuang landslide is stable naturally, which is identical to the in - situ investigation ; ( 3 ) through stability analysis, the landslide would slide if the water level dropped down from 175. 10m to 156. 0m and it rained successively after the three gorges reservoir work. ( 4 ) according to the results of calculation and the characteristic of the landslide, it is suggested that such measures as unloading at upper part, anchorage and pile supporting system and drainage system should be used on the landslide. ( 5 ) according to geological investigation, there are three kinds of dangerous rock in the engineering, those are failing - down rock, collapsing rock and sliding rock

    因此有必要對滑坡進行治理; ( 4 )根據滑坡推力計算結果和本滑坡屬牽引式滑坡的特點,滑坡體上部相對較穩定,中下部處于基本穩定或不穩定狀態,因此建議此滑坡治理採用上部削坡減載與拉抗滑樁、擋墻進行支擋結合的處理方法,同時結合截排等措施進行綜合治理; ( 5 )根據地勘資料,通過對危巖體的形態、規模、基座和底界層及分佈特點和分析,將本工程危巖體失穩崩塌的方式歸納為墜落式、傾倒式和滑塌式三種類型並分別提相應的穩定性計算方法; ( 6 )分別對本工程中的危巖體進行了穩定性計算,並且發現其都處于不穩定狀態,因此根據實際情況分別提相應襯砌支撐和清理等加固治理措施,最後還對加固后的危巖體進行了校核計算,滿足要求。
  20. Elastic - plastic analysis for soil around anchor jacked pile in this paper, the course of penetration is regarded as expansion of cylindrical cavity in infinite soil mass. combining with the knowledge of elastic mechanics and plastic mechanics, we can make analysis for soil around pile. finally, we can educe the cylindrical cavity pressure, radius of plastic zone, radical displacement in elastic zone, excess pore water pressure in soil around pile and spherical cavity pressure at the end of pile

    桿靜壓樁樁周土體的彈塑性分析該部分是文章的主要工作所在,本文把壓樁過程樁周土體的本構關系看作是平面的平面應變小孔擴張問題,利用小孔擴張原理,結合彈性力學以及塑性力學的知識,對壓樁後土體的性狀作分析,得樁對土的擠擴作用力、樁周土體塑性半徑、彈性區的位移,壓樁完成瞬時樁周土體彈性區和塑性區的超孔隙壓力以及樁端球形孔擴張的擴張力。
分享友人