錨固力 的英文怎麼說

中文拼音 [máo]
錨固力 英文
anchorage force
  • : 名詞(鐵制的停船設備) anchor
  • : Ⅰ形容詞(結實; 牢固; 堅硬) firm; hard; solid Ⅱ副詞1 (堅決地; 堅定地) firmly; resolutely 2 [書...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  1. Fist of all, on the basis of the research of agone boffins, this author investigates the interaction mechanism of bolts and rock, and introduces the elastic ? lastic analytical resolution which is consist of the liner structure, the equivalent reinforced wall rock and the original wall rock in the simple loading from the equivalent well - proportioned view ; this solution is very important meaning for the engineering design. on the basis of coulomb friction model, the author introduces the finite element equation of the contact problem in order to provide the academic foundation for the application of msc. marc. finally, combining the engineering practice of the non - linear analysis of shield tunnel through yellow river of the south - north water transfer and using the model of friction, the author researched the evolution law of stress and displacement field in the structure of grouted rock bolts, and analyzed the effect to the stress and deformation of surrounding rock mass due to anchor supports

    首先,在前人研究成果的基礎上,對桿與圍巖的相互作用機理進行研究,利用全長桿的中性點理論,從等效均化的角度來考慮桿對圍巖的加作用,並推導了在簡單荷載作用下,含有襯砌、等效加后的圍巖、原始圍巖三者的彈塑性解析解,對工程設計有著重要的參考意義;在數值模擬方面,以考慮圍巖滿足規則化庫侖摩擦模型為基礎,利用虛功原理推導了接觸問題的有限元方程的計算格式,為開發運用大型商用有限元軟體msc . marc提供了理論根據,也形成了本文的理論基礎:最後,論文以南水北調東線穿黃隧洞穩定性分析項目為工程實例,利用本文所述的接觸問題的摩擦模型理論,對桿支護結構的應場、位移場的變化規律進行了研究,分析了加支護對隧洞圍巖應、變形的影響。
  2. Design specification for hydraulic prestressed anchorage

    水工預應設計規范
  3. The anchor flange for west - fast gas pipeline project is a kind of important device to avoid axile thrust damages all valve of electric field and the anchor flange of the project are only supplied by my company. the anchor flange has replaced import product, filling up domestic blank and achieving nationalization.

    法蘭是西氣東輸管道工程為防止軸向推對各種站場閥室造成破壞而設置的一種重要裝置。全線所用的法蘭均由我公司獨家供應。該產品代替了進口,填補了國內空白,實現了國產化。
  4. Study on distribution and diffusion regularity of frictional resistance in the inter face of grouted body of anchor cable

    索內段摩阻分佈及擴散規律研究
  5. This article comtined the practice of the projtct of jiaojiang bridge and analyzed strand wire with high strength and low laxation, the anchorage system, the tentioned technice in the construction, and the principle of anchorage

    摘要本文結合椒江大橋工程實踐,分析了國產高強度低鬆弛鋼絞線和預應體系,在施工中的張拉工藝、原理。
  6. And. the test research on the restrained beams strengthened by epoxy - glued cfrp which is glued in term of different angle is presented. based on the test of shear strengthening by cfrp - bonded, qt. ality control standards of the design and construction is established

    作者對cfrp加用材料性能、結構受特徵進行了系統的論述,對按不同角度粘貼cfrp加的約束梁進行了試驗研究,得到大量數據,並在試驗的基礎上,得出了有關的構造要求、要求等設計施工質量控制條件。
  7. The shear mechanism, failure mode, deformation capacity, bearing capacity and the reliability of the anchored angle steels of the wrapped steel concrete cast - in - site frame typical story exterior joints under the middle and high axial compression ratio ( n = 0. 3, 0. 5, 0. 6 ), the working performance, failure mode, and the shear capacity of top story joints under the crack moment, the hysteresis characteristic and the dissipation energy capacity of the test joints are all analysed based on the 1 / 4 model pseudo - static tests of five specimens of wrapped steel concrete cast - in - site frame exterior joints, which varied in axial compression ratio, distribution of the beam angle steels and the stirrup ratio

    基於上述分析,本次試驗通過五個外包鋼混凝土邊節點1 4比例模型的偽靜試驗,以柱的軸壓比、梁角鋼布置形式、配箍率等為主要參數,分析外包鋼混凝土現澆框架一般層邊節點在中高軸壓比( n = 0 . 3 、 0 . 5 、 0 . 6 )條件下,節點的抗剪機理、破壞模式、變形能、承載能和角鋼的可靠性;分析了頂層邊節點在張開彎矩作用下的工作性能、破壞模式和抗剪承載;分析了試驗節點的滯回性能和耗能能
  8. The article structure the landslide prevention and cure, the structure of prestress anchors and its application in detail. basing on the geology condition of fabricating yard, we calculate the solid power and the length of anchor rope. we have worked out the experiment research scheme, and has carried on the earlier stage experiment, field demarcation experiment and has opened pulling the experiment on the spot. ten teams of steel rope to two teams of structure types twist the experimental data that thread internal stress and the total pulling force has been in progress research, and has put forward raising the measure of solid capability of prestress anchor and administering possessing

    本文以川藏公路滑坡路段為研究對象,對滑坡的治理、預應索的結構、作用及其在滑坡防治中的應用進行了詳細的分析;基於施工現場的地質條件,對錨固力索最佳段長度進行了理論計算;制定了實驗研究方案,進行了前期實驗、現場標定實驗、實地張拉實驗;對兩組結構型式的十組鋼絞線內應及總張拉的實驗數據進行了研究,提出了提高預應性能的措施,以及具體的施工方案和施工工藝。
  9. In this paper a new procedure is proposed for calculating the anchoring force required to stabilize slopes to a specified factor of safety

    摘要針對目前邊坡穩定性計算方法中的缺陷,提出一種合理且實用的方法直接計算邊坡錨固力
  10. The supporting mechanism of pre - stress anchor is given in following sentences in this paragraph : make full use of sectional stability, put - up steel - net shot concrete to the stratified earth as the trench is being excavated, and by this means, the little liding of soil layers and small broken slumps of rock slopes can be avoided

    預應板的支護機理:充分利用巖土層自身或預處理的局部的穩定性,隨基坑開挖分層掛鋼筋網噴射砼,以避免土層幫片及巖石邊坡小的節理破碎滑塌,並把土壓傳給板,由桿集中受,通過桿的錨固力平衡土壓
  11. In this paper the friction piles are used in zipingpu multi - purpose dam construction project, the spillway in the side slope is covered with overburden, the horizontal area is from sp. 0 + 200m to sp. 0 + 280m, the elevation is about from el. 810m to el. 950m, there is hard and integral rock under the overburden, which provides enough anchor ability, and it ' s requirement to set the friction pile at the appropriate place ; in order to improve the slope stability that suitable excavation or weeding off the disadvantage load on the landslide are good measures, for the scarp it ' s better to reduce the slope

    摘要紫坪鋪水利樞紐工程溢洪道樁號0 + 200 ~ 0 + 280 、高程810 ~ 950m范圍的內側邊坡為覆蓋層邊坡,坡體下部有較為完整堅硬的巖石,具備提供足夠錨固力的條件,在適當的位置可以考慮設置抗滑樁,再通過適量的開挖提高邊坡穩定性,或將滑坡體上部不利於穩定的荷載挖除,對于陡坡的坡面可以將坡削緩,則效果會更好。
  12. According to the original work on the stability problem of the left side of the river and the elementary analysis on the model of geological mechanism, two section planes of rock group t33 and j have been chosen to carry out the stability evaluation ( the slope stability analysis utilized the sarma program ), both of which have the different rock characters. when loads are calculated, the internal force, underground water, earthquake force, their combination and measure to deal with anchorage force infliction are also considered

    根據左岸邊坡穩定問題的前期工作和地質學模式的初步分析,並結合工程地質條件調查,選取巖性構成不同的t33巖組和j巖組的兩個剖面分別進行穩定性評價(邊坡穩定性分析採用sarma程序進行) ,計算載荷考慮了自重、地下水、地震及其組合以及施加錨固力的處理措施。
  13. The total normal stresses arc then modified by satisfying the rigorous equilibrium conditions for the whole sliding body, resulting in an closed form expression for the required magnitude of anchoring force

    再進行修正,使后邊坡體滿足所有整體平衡條件,最後得到邊坡滿足給定安全系數要求的錨固力解析表達式。
  14. The anchor technology is a kind of method of active reinforcing that changes slope ' s stress status and inspires one ' s own stability by huge anchor force

    技術是利用巨大的錨固力改變坡體應狀態、調用坡體自穩能的一種主動加方法。
  15. In contrast to conventional procedures, the present method assumes the normal stresses associated with the action of anchorage is approximated by the analytical stress distribution corresponding to an infinite wedge with concentrated force at the apex

    應用無限楔體受集中作用的彈性學解答計算與錨固力對應的滑面正應分佈,將其與前滑面正應疊加。
  16. In the stability graphical method, the basic property of rock mass is understood by engineering geology survey, the stability is analyzed at first, then the supporting parameters are determined, and the anchoring force is checked according to the type of cable - anchor

    穩定性圖解法通過巖體工程地質調查來掌握巖體的基本特性,首先對采場進行穩定性分析,在此基礎上確定其支護參數,並針對具體索型號驗算錨固力
  17. By the test of anchor cable pull - out intensity, research is carried on anchor capability, stiffness coefficient and prestress losses of anchor cable in reinforcing similar soil slopes. the mechanisms of reinforcing similar soil slopes by prestressed anchor cable sash ( beam ) are studied by the method of combination of field test, theory analysis and numerical simulation, as a result, the calculational pattern of internal force of anchor cable sash ( beam ) is put forward

    本文通過大量野外調查,提出類土質邊坡的概念,並分析了它不同於一般粘性土邊坡的特性;通過索抗拔試驗研究了類土質邊坡的錨固力大小、索剛度系數和索預應損失情況;通過現場試驗、理論分析和數值計算相結合的方法,研究預應索框架(地梁)加類土質邊坡的機理,提出預應索框架(地梁)的內計算模式。
  18. Furthermore, the pressure of soil can be exerted on anchor boards, so the stressed anchor can balance the pressure of soi1 through the anchoring. before the trench displaces, the anchoring pressure begins to work through the exertion of pre - stress. meanwhile, the stress pressure of anchor changes and is adjusted through shot concrete and its stressed steel. so the whole supporting system, which is similar with the pile - anchor supporting system, is finally formed, and it can limit the displacement of trenches

    桿的錨固力在基坑出現位移前,通過雨應的施加即得以發揮作用,桿的受應生變化並通過噴射硅及其中的受筋得以調整,從而形成一個與樁一結構近似的整體支護系統,起到限制基坑位移的作用。
  19. One is the " belt persistence ", which is defined as the total length of joints teace length in a 1m wide belt projected to a basic line ( eliminating the overlay section ) over the length of the basic line. another is the one called as " search persistence ", which is defined a as the total length of joints trace length on the searched potential slipe surface over the length of the slip surface. thus, the author establishes a measuring and calculation system to these definitions and finishes a great deal of field investigation aiming at the joints trace length and the " rock bridge " survey

    在此基礎上,針對a區邊坡的穩定性,結合邊坡的破壞失穩模式,以邊坡節理巖體的連通特性的研究為突破點,從節理巖體的幾何參數的統計分析出發,採用monte - carlo隨機模擬原理形成節理網路模擬圖,以巖橋和節理組合破壞的內在機制為依據,以搜索節理巖橋組合的最短路徑為手段,通過帶寬投影法與路徑搜索法兩種方法的計算,獲得了sn向中緩節理的連通率分別為48 . 7和56 . 78 ,最終推薦60的連通率進行了邊坡的穩定性分析與計算,並結合工程實際,計算了邊坡的推錨固力,最終為邊坡的支護設計提供優化建議。
  20. Each unit anchor has its own individual tendon, its own unit fixed length of borehole, and is loaded with its own unit stressing jack which ensures that the load in all unit anchors is always identical. the total working load of the anchor is beard by each fixed anchor length of all units in staggered depth in the borehole and by means of respective bearing bodies, the tension loads applied to the plastic coated strands are changed into the compression loads on the grout of each fixed anchor length, then the total working load can be divided into several smaller loads and transmitted to the rock mass and soil in different locations in dispersed compression

    分散型索是在一個鉆孔中安裝若干個索單元,每個單元都有自己的桿體和段,在張拉時分別承受相同的工作荷載;索總的錨固力由分散布置於鉆孔不同深度處的這些單元索的段來共同承擔,並利用各單元的承載體將無粘結索的拉轉化為對段注漿體的壓,從而將索總的錨固力以壓形式分散作用於不同深度的巖土體上。
分享友人