錨固支座 的英文怎麼說

中文拼音 [máozhīzuò]
錨固支座 英文
anchored bearing
  • : 名詞(鐵制的停船設備) anchor
  • : Ⅰ形容詞(結實; 牢固; 堅硬) firm; hard; solid Ⅱ副詞1 (堅決地; 堅定地) firmly; resolutely 2 [書...
  • : Ⅰ名詞1 (分支; 支派) branch; offshoot 2 (地支) the twelve earthly branches3 (姓氏) a surname...
  1. Each leg has three holes on the bottom for anchoring to the floor or base plate

    每個柱底部都有三個孔,用於在地面或底上。
  2. Through these studies and analysis, following conclusions could be drawn : ( 1 ) it is necessary to study on harness engineering of landslide and dangerous rock since the main representations of this geological hazard are landslide and dangerous rock through geological investigation ; ( 2 ) it can be concluded though stability analysis that the dingzhuang landslide is stable naturally, which is identical to the in - situ investigation ; ( 3 ) through stability analysis, the landslide would slide if the water level dropped down from 175. 10m to 156. 0m and it rained successively after the three gorges reservoir work. ( 4 ) according to the results of calculation and the characteristic of the landslide, it is suggested that such measures as unloading at upper part, anchorage and pile supporting system and drainage system should be used on the landslide. ( 5 ) according to geological investigation, there are three kinds of dangerous rock in the engineering, those are failing - down rock, collapsing rock and sliding rock

    因此有必要對滑坡進行治理; ( 4 )根據滑坡推力計算結果和本滑坡屬牽引式滑坡的特點,滑坡體上部相對較穩定,中下部處于基本穩定或不穩定狀態,因此建議此滑坡治理採用上部削坡減載與拉抗滑樁、擋墻進行擋結合的處理方法,同時結合截排水等措施進行綜合治理; ( 5 )根據地勘資料,通過對危巖體的形態、規模、基和底界層及分佈特點和分析,將本工程危巖體失穩崩塌的方式歸納為墜落式、傾倒式和滑塌式三種類型並分別提出相應的穩定性計算方法; ( 6 )分別對本工程中的危巖體進行了穩定性計算,並且發現其都處于不穩定狀態,因此根據實際情況分別提出相應襯砌撐和清理等加治理措施,最後還對加后的危巖體進行了校核計算,滿足要求。
  3. The support pedestal shall be designed for anchor bolting to a concrete foundation and shall be of adequate strength and mass to support the combined weight of the pump / motor assembly and all forces imposed by the pump unit during operation

    撐基應該採用螺栓定在混凝土基上,應該具有適當強度和質量,能夠撐泵/電機總裝的總重量,以及泵設備在運行過程中所產生的所有壓力。