錨固系統 的英文怎麼說

中文拼音 [máotǒng]
錨固系統 英文
anchorage system
  • : 名詞(鐵制的停船設備) anchor
  • : Ⅰ形容詞(結實; 牢固; 堅硬) firm; hard; solid Ⅱ副詞1 (堅決地; 堅定地) firmly; resolutely 2 [書...
  • : 系動詞(打結; 扣) tie; fasten; do up; button up
  • : Ⅰ名詞1 (事物間連續的關系) interconnected system 2 (衣服等的筒狀部分) any tube shaped part of ...
  • 系統 : 1. (按一定關系組成的同類事物) system 2. (有條理的;有系統的) systematic
  1. Road vehicles - anchorages in vehicles and attachments to anchorages for child restraint systems - part 1 : seat bight anchorages and attachments

    道路車輛.車輛中裝置和兒童約束裝置的附件.第1部分:座椅繩環的裝置和附件
  2. As a new type of external thermal insulation system, it integrates traditional external thermal insulation technique with light - weight, weatherproof and ventilative flex finish tile, no need for anchoring

    該體將傳的膨脹聚苯板薄抹灰技術與自重輕、耐候性強、防水透汽性好的柔性面磚相結合,無需,安全美觀。
  3. And. the test research on the restrained beams strengthened by epoxy - glued cfrp which is glued in term of different angle is presented. based on the test of shear strengthening by cfrp - bonded, qt. ality control standards of the design and construction is established

    作者對cfrp加用材料性能、結構受力特徵進行了的論述,對按不同角度粘貼cfrp加的約束梁進行了試驗研究,得到大量數據,並在試驗的基礎上,得出了有關的構造要求、要求等設計施工質量控制條件。
  4. Our product range covers drilling and demolition, direct fastening, diamond and anchoring systems, firestop and foam systems, installation, measuring and screw fastening systems as well as cutting and sanding systems

    我們的產品范圍涵蓋鉆孔與鑿破、直接定、鉆石與安卡、防火與發泡填縫、安裝、定位與螺絲,以及切割與砂磨
  5. In the excavating process of the left bank, such methods as concrete embolism, consolidation grouting > cable strengthening and bailing shoud be used when the fault f5 is round. on the right bank, the system anchorage and bailing methods shoud be used. it is surgested that the prestressed cable shoud be used to deal with the deterministic blocks. and the prestressed anchor to the undeterministic blocks

    左岸拱肩槽邊坡在開挖施工至斷層f5附近時,要使用混凝土栓塞、結灌漿、索加及排水等措施以防止巖體失穩。右岸拱肩槽邊坡開挖過程中要採取及排水防滲等措施,以防止個別潛在不穩定的邊坡失穩。
  6. The pouring anchor and shot concrete as used from the middle of 1950 " s, while the technology of anchorage, which was used as foundation support was popular in europe in i960 " s, and this method was used to strengthen the tunnels " ceilings and support mines from 1970 " s in china

    在我國70年代前已開使在加隧洞頂、礦山支護等工程中開始使用, 80年代開始應用於深基坑支護工程,但也主要是與鋼板樁、灌注樁、地下連續墻等結合使用,做為支護的一種手段取得了良好的效果。
  7. The business scope of tiandi science & technology co., ltd. are the product and sale of electricity product, mine electricity products ; the design and contract of underground project, coal cleaned and chosen project, coal comprehensive usage project, environmental protection project and net work project, mine construction and the design of production system, technology promotion, consultation, contract and service of external project

    簡介:天地科技股份有限公司主要技術和產品包括:採煤機,掘進機,全礦井綜合自動化,計算機軟體技術,礦井提升機自動化控制,煤礦裝車、配煤、計量自動控制,液壓支架電液控制,液壓支架設計與開發;煤炭洗選設備;煤礦建設項目的設計、咨詢和工程總承包,地下建設施工程,建築物加技術與材料;煤炭開采,特殊採煤技術,煤礦桿支護成套技術與設備,工作面支護技術,綜采工作面自動監測技術。
  8. The shantou bay suspension bridge is the first mordern suspension bridge in china its substructures are mainly towers and anchorages this paper presents some of the key techniques of the substructures construction , including the cable anchorage system setup , the hydrated heat control in the anchorage , construction of the foundation and bearing plate of the tower in the ocean , the control of tower construction , etc

    汕頭海灣大橋是我國第一座現代懸索橋下部結構主要包括索塔和碇本文介紹了該橋下部結構施工的一些關鍵技術環節,包括主纜錨固系統的安裝,大體積混凝土的溫控防裂,主塔基礎和承臺的海上施工,塔柱滑模施工控制等
  9. Since the existed research has n ' t illuminated the failure form of post - embedded reinforcing steel bar bonding anchor and its mechanism, has n ' t systematic research on factors influencing the function of post - embedded reinforcing steel bar bonding anchor, and also failed to test on the long period validity of post - embedded reinforcing steel bar bonding anchor, it is very unfavorable for the spread and application of post - embedding technique. in the meantime, the fact that the present post - embedding anchoring material is of few kinds, high prices and still - to - be - improved performance has become the bottleneck of the post - embedding technique ' s development, which has restricted its further application and development. therefore, it is of great importance to develop a new type high - performance inorganic anchoring material with reasonable price and improved performance

    由於已有研究對后植鋼筋粘結的失效形式、破壞機理未作出明確回答,對后植鋼筋粘結性能的影響因素未進行研究,對后植鋼筋粘結的長期有效性未予以試驗證實,不利於植筋技術這種新型結構加技術的推廣應用,同時現有植筋材料存在品種少、價格高、性能需要進一步改進和提高等局限性,已成為植筋技術發展的瓶頸,制約了植筋技術的進一步應用和發展,因此開發價格合理、性能優良的新型高性能無機質類材料就顯得尤為重要和迫切。
  10. Avalanche protection systems. passive concentrated anchorages for soft ground. pull out tests method

    雪崩防護.軟地無源集中的地.著力實驗方法
  11. ( 2 ) for consolidation of the grottoes ’ slope, there ’ s no mature theory and technique. in this paper the back analysis of shear strength of the rock slope at yulin grottoes is presented. through the back analysis of shear strength, we can presents a procedure for the design of consolidation of the yulin grottoes in anxi. it is very important in the field of reinforcing the slope of grottoes

    ( 2 )目前對于石窟邊坡的索加研究尚無的理論和方法,本文以安西榆林石窟為例,提出了一種通過反演( c , )值來設計加石窟邊坡的方法。對于在未知巖體的抗剪強度( c , )值的條件下來設計加石窟邊坡,該方法的提出具有一定的理論意義和應用價值。
  12. This thesis aims to analyze how to select and assign prestressed tendon, how to design anchorage bearing joint, how to control the crack, how to calculate the axial prestressed force and the third moment and how to design the edge column of top layer. on the base of the research in and out our country and construction of the prestressed structure, some helpful conclusion and suggestion are presented, which is suggestive for the design and construction of long span continuous prestressed concrete frame

    本文將綜合設計與施工兩個方面,對預應力筋的選用、布置,區的設計及構造處理,裂縫問題,側向約束對梁軸向預壓應力及柱中第三彎矩的影響,頂層大跨邊柱設計等幾個問題進行的分析研究,並在國內外研究和大量工程實踐的基礎上,提出了一些建議和預防措施,對此類工程設計和施工有一定的參考價值。
  13. Test method for anchorage of permanent metal railing systems and rails for buildings

    建築物護欄和永久金屬護欄裝置的試驗方法
  14. Comparing the tension test results of a series of carbon fiber products, the one with the best price - performance ratio is picked out among them to be used in the field experiment. the corresponding epoxy resin binder both and anchorage - tension system are also developed

    通過對十余種碳纖維製品的抗拉試驗,選擇出「性價比」較高的碳纖維布作為試驗路段的筋材,並初步研製出與之配套的環氧樹脂膠和張拉
  15. Furthermore, the pressure of soil can be exerted on anchor boards, so the stressed anchor can balance the pressure of soi1 through the anchoring. before the trench displaces, the anchoring pressure begins to work through the exertion of pre - stress. meanwhile, the stress pressure of anchor changes and is adjusted through shot concrete and its stressed steel. so the whole supporting system, which is similar with the pile - anchor supporting system, is finally formed, and it can limit the displacement of trenches

    桿的力在基坑出現位移前,通過雨應力的施加即得以發揮作用,桿的受應生變化並通過噴射硅及其中的受力筋得以調整,從而形成一個與樁一結構近似的整體支護,起到限制基坑位移的作用。
  16. Relying on the project of sanchaji self - anchored suspension bridge, this thesis analyzes the calculating theory of the cable system and does some significant experimental research on the anchorage system of the self - anchored suspension bridge

    本文依託長沙三汊磯自式懸索橋工程,對自式懸索橋的主纜計算理論、主纜方式和區受力特徵進行了研究和試驗。
  17. Standard guide for selection, design, and installation of dimension stone anchoring systems

    規格石錨固系統的選擇設計和安裝的標準指南
  18. At last, the analysis of the redistribution of the initial crust stress and the distribution of the plastic area is made ; the stability evaluation of the rock mass around the cavern is provided. the outcome is conformed with the reality. then applys the approximately equivalent dissolved rule, and considers the action of anchor staff to consolidate the rock mass, and correspond model is established, nonlinear finite element m ethod is applied to analyze the effect of the supports, the result shows that the action of anchor staff is obvious and deformation and stress state of the rock mass is greatly approved. so, the result conforms that the idea and the means used in the thesis is applicable

    最後運用非線性有限元對廠房開挖后圍巖的應力重分佈和塑性開展區的分佈作了分析,評價了廠房的圍巖穩定性,其結果與實際開挖情況基本吻合,針對圍巖穩定性評價的結果,提出了方案,運用等效概化原理考慮桿的作用,建立了採用桿加后的地下廠房圍巖的三維彈塑性模型,運用非線性有限元分析了加效果,結果表明作用明顯,圍巖變形明顯減小,圍巖內的應力狀態大為改善,從而驗證了本文所採用的研究思想和方法是切實可行性的。
  19. Based on the theoretical analysis of the anchorage technique of planting - bar, this paper presents the failure model, empirical formulation and key points of operation of planting - bar anchorage, and explains the development and application of planting - bar technique in port engineering combining site experiment and test

    摘要通過對植筋技術的理論分析,地提出了植筋的破壞形式、工程經驗公式及施工操作的要點,並結合現場試驗與檢測說明植筋技術在港口工程上的發展應用。
  20. The stiffness of the bolts are added to the integer stiffness matrix. 44 5. the above theories are applied in the stability analysis of the 5 machine set of pubugou hydropower underground cavity group

    桿的勁度加入到的整體勁度矩陣中,直接而又比較客觀的反映了桿對巖體的加效果,並推導了相應的理論公式。
分享友人