錨定室 的英文怎麼說

中文拼音 [máodìngshì]
錨定室 英文
anchorage chamber
  • : 名詞(鐵制的停船設備) anchor
  • : Ⅰ形容詞1 (平靜; 穩定) calm; stable 2 (已經確定的; 不改變的) fixed; settled; established Ⅱ動詞...
  1. The main functions of the module for initializing drawing environment are to set up the scale. linetype. breadth and frame of drawings according to the characteristics of the general arrangement drawing to passenger shippings. the main functions of the second module is to establish and extend graph library, retrieve from graph library and output graph blocks. using the parameterization design method to design interactively and modify automatically graphs of the local cabin are the tasks of the third module. in the help module, the drawing specifications of passenger shipping are integrated, such as equipments of anchor and moor, arrangement of cab, cabin and baggage, measures to come through and ration of passengers, etc. there are some advantages in the proposed system, such as friend interface, operation easily, drawing conveniently and modification automatically

    其中初始化繪圖環境模塊主要針對客船總布置圖繪制的特點來完成比例、線型、圖幅和圖框的設置;客船總布置圖圖庫模塊主要完成圖庫的建立和擴充、圖庫的查詢以及圖塊的輸出;局部艙參數化設計模塊採用參數化技術完成對局部艙圖形的自動修改以及交互設計;客船規范幫助模塊則集中了一些武漢理工大學碩士學位論文客船繪制規范,如泊及系泊設備、駕駛、乘客艙及行李的放置、脫險措施及乘客額等規范。
  2. Stability analysis on surrounding rock of large cross section chamber supported with bolt steel mesh shotcrete combined system

    網噴聯合支護大斷面硐圍巖穩性分析
  3. This thesis discussed the design principia and desige method from the engineering point of view., and give out its own view about the selection of development of the hydropower station, layout of the underground cavern mass, selection of method for stability analysis on the surrounding rocks and support, and design of the rock anchorage crane beam. some conclusions assumed from the research and design of jiangkou power house is quite useful for all the underground hydropower station

    本文結合江口電站,從工程的角度對地下廠房的設計原則、設計重點進行了詳細論述,對電站開發方式的選擇,地下洞群的布置特點,圍巖的穩性分析及支護方式選擇以及巖吊車梁的設計方法進行了研究和論證。本文的觀點和結論對地下廠房工程設計有著一的普遍意義。
  4. Comprehensive analyses lead to the following conclusions : the rock condition is lead for excavating chambers in the right bank underground powerhouses of xiangjiaba hydro - power station ; surrounding rock is generally stable and unitary stability can be guaranteed after anchorage and gunited support

    綜合分析后認為:向家壩水電站右岸地下廠房洞群的成洞條件較好,圍巖基本是穩的,經過噴支護后整體穩是有保證的。
分享友人