錨定桿 的英文怎麼說

中文拼音 [máodìnggǎn]
錨定桿 英文
anchoring rod
  • : 名詞(鐵制的停船設備) anchor
  • : Ⅰ形容詞1 (平靜; 穩定) calm; stable 2 (已經確定的; 不改變的) fixed; settled; established Ⅱ動詞...
  • : 桿名詞(桿子) pole; staff
  1. Fist of all, on the basis of the research of agone boffins, this author investigates the interaction mechanism of bolts and rock, and introduces the elastic ? lastic analytical resolution which is consist of the liner structure, the equivalent reinforced wall rock and the original wall rock in the simple loading from the equivalent well - proportioned view ; this solution is very important meaning for the engineering design. on the basis of coulomb friction model, the author introduces the finite element equation of the contact problem in order to provide the academic foundation for the application of msc. marc. finally, combining the engineering practice of the non - linear analysis of shield tunnel through yellow river of the south - north water transfer and using the model of friction, the author researched the evolution law of stress and displacement field in the structure of grouted rock bolts, and analyzed the effect to the stress and deformation of surrounding rock mass due to anchor supports

    首先,在前人研究成果的基礎上,對與圍巖的相互作用機理進行研究,利用全長的中性點理論,從等效均化的角度來考慮對圍巖的加固作用,並推導了在簡單荷載作用下,含有襯砌、等效加固后的圍巖、原始圍巖三者的彈塑性解析解,對工程設計有著重要的參考意義;在數值模擬方面,以考慮固圍巖滿足規則化庫侖摩擦模型為基礎,利用虛功原理推導了接觸問題的有限元方程的計算格式,為開發運用大型商用有限元軟體msc . marc提供了理論根據,也形成了本文的理論基礎:最後,論文以南水北調東線穿黃隧洞穩性分析項目為工程實例,利用本文所述的接觸問題的摩擦模型理論,對支護結構的應力場、位移場的變化規律進行了研究,分析了加支護對隧洞圍巖應力、變形的影響。
  2. Stability calculation methods for grillage supporting structure with prestressed anchor and its application

    框架預應力邊坡支護結構穩性計算方法及其應用
  3. As one of the. most effective rock shoring forms, rock - bolt reinforcement is still in use combining with some shoring forms such as three - dimensional vegetable netting, insufflating - virescence reinforcement, sash reinforcement and their effects are very distinctly

    但作為減小巖體側向變形、增強邊坡穩支護作為最有效的巖質邊坡的支護方式之一,仍廣泛地於三維植被網、邊坡綠化噴播、框格防護等形式結合進行邊坡防護,效果非常明顯。
  4. The anchorage force of bolt, the displacement of deep surrounding rock, and the surface displacement of the gateway were comprehensively observed, indicating that the testing entry affected by dynamical mining pressure still keeps stable, achieving a good supporting effect

    受力、圍巖深部位移、頂板離層及巷道表面位移綜合觀測表明,受回採動壓影響后,試驗巷道穩,支護效果好。
  5. It is very difficult to construct prestress anchored bar in the area near sea that contains many highly confined aquifers

    介紹了的構造、作用機理、施工工藝以及決施工質量的關鍵技術。
  6. The pile - anchor retaining structure system is often used in chongqing area. for a long time, there is a conception about the transfer approach of soil pressure behind the pile - anchor retaining structure system that the pressure is applied on the holding sheet firstly, then transferred to the columns by the sheet, finally transferred to the form ground by the anchor

    支擋結構體系是重慶地區經常採用邊坡支護形式之一,長期以來,人們認為樁支擋結構體系的傳力途徑是:土壓力先作用於擋板上,通過擋板再傳到兩邊立柱,然後再通過把力傳遞給穩地層。
  7. Our company is specialized in supplying all kinds of terminal block, switch test double block, ground block, fuse block, three - level sensor block with light, double block, universal block, integral block, nylon cable ties, cable ties, releasable cablle ties, self - locking cable tie, marker calbe ties, flexible pipe, cable marker, expansion nail / plug, wire joint, cable clamp, nail clip, screw on wire connector, self - adhesive tie mount, spiral wrapping band, wire connectors, cable tie mounts, nylon fasteners, cable gland, nylon ties, cable terminal, terminals, terminal connector, wiring duct, pre - insulated terminals, cable markers, electrician tools, cabling accessories, plastic cable ties, wire tie, tie wrap, beaded tie wraps, tie wrap adhesive, tie wrap tool, cable, wires, terminal connector, terminal block, nail, nylon cable glands, pe tubing and quick screw connector, circle nail cable clips, self - adhesive tie mounts, expand nails, spiral wrapping bands, screw on wire connectors, copper connecting terminals, pre - insulated electrician tools, wire connectors, cable tie mounts, nylon fasteners, nylon ties, cable terminal, pre - insulated terminals, cabling accessories, plastic cable ties, wire tie, tie wrap, beaded tie wraps, tie wrap adhesive, tie wrap tool, cable, wires, terminal connector, terminal block, nail, nylon cable glands, cable accessories, wiring accessories etc. we offer superior product and best service with competitive price

    我們公司是專門供應各種終端塊,交換機測試雙重座,地面座,保險絲座,三層傳感器座輕型雙座通用塊,積分塊,尼龍電纜聯系,電纜聯系,松解索關系自鎖式電纜接頭,光纜標記關系,軟管,電纜標記,膨脹釘/插頭,電線接頭,電纜鉗,夾釘,螺絲電線連接,自粘配合摩,螺旋帶包,導線連接器,線纜配合固座,尼龍緊固件,電纜壓蓋,尼龍關系,電纜終端,終端,終端連接器,電線導管,預終端絕緣,電纜料,電工工具,電纜配件,塑料電纜聯系,配合鋼絲,為配合劇情,串珠配合纏上搭膠包裹,包裹配合工具,電纜,電線,終端連接器,終端塊,釘,尼龍索腺體,聚乙烯管材及快速接頭螺絲,圓釘電纜夾,自粘配合固座,擴大釘,螺旋帶包螺導線連接器,銅接線端子,預絕緣電工工具,電線接頭,電纜接頭固座,尼龍拉鏈,尼龍關系,電纜終端,預終端絕緣,電纜配件,塑料電纜聯系,配合鋼絲,為配合劇情,配合串珠包,搭包膠,配合工具包,電纜,電線,終端連接器,終端塊,釘,尼龍腺體電纜,電纜配件,線路配件等,我們提供卓越的產品和最好的服務,具有競爭力的價格
  8. Combined with the real example of monitoring pressure on the supporting system in the long span underground space of dk7 + 692 section at jiao - xin line of chongqing light railway, it is set forth the methods about choosing the support system and its parameter, digging methods of underground space, measuring and testing methods for the stress of the support system ; the testing results and variation pattern were analyzed for the stress of the initial supporting i - steel axial stress of bolt, stress of shot - concrete, supporting pressure of temporary i - steel and stress of steel of the second lining, then, the reason for deformation of the support system induced by sharp increase of i - steel was determined

    摘要結合重慶市輕軌較新線大坪車站大跨度地下空間dk7 + 692斷面施工支護體應力監測的工程實例,闡述了該大跨度地下空間支護結構的參數選擇、地下空間的開挖方法、支護體結構的應力量測方法及測試手段;分析了支護體初期支護工字鋼拱應力、軸力、噴射混凝土內應力、臨時工字鋼支撐應力、二次襯砌鋼筋應力等測試結果和變化規律;確了工字鋼拱應力急劇增大而可能引起支護體系失穩的原因。
  9. Application of the point reaming technique to the pull - out anchor

    位擴孔技術在抗拔中的應用
  10. The pre - stressed anchor supporting structure with beam and column is analyzed theoretical in this paper, combined with theoretical study and design of such supporting structure, which is one of the plan projects of construction science and technology in hunan province. the topic provides engineering aiming with practical and concise computation method, and also provides the advice for structure with proper theory foundation and schemes to some extent

    本文結合湖南省建設科技計劃項目「永久性肋樑柱擋土墻設計關鍵問題及計算軟體開發」 ,對預應力肋樑柱支擋結構進行了理論分析,提供了適合於工程的、比較簡捷的實用計算方法,同時也為該類支擋結構設計提供一的理論依據和設計建議。
  11. In this method, spaces for plant growth are separated from the anchoring bar and shotcrete structures, but they have some mutual relations in following two points : firstly, establishments for plant growth can be fixed by using anchoring bars and shotcrete ; and secondly, water for plant growth can be partly supplied by drainage holes arranged in anchoring bar and shotcrete structures

    在該方法中,供植物生長的空間(包括綠化槽、綠化盆等)與噴結構是相互分離的,但在以下兩方面又有所聯系:第一,藉助于和噴射混凝土來固栽種植物所需的設施;第二,通過布置在噴結構上的排水孔為植物供水。
  12. Simulation analysis of stability of coal roadway bolting

    支護煤巷穩性模擬分析
  13. The supporting mechanism of pre - stress anchor is given in following sentences in this paragraph : make full use of sectional stability, put - up steel - net shot concrete to the stratified earth as the trench is being excavated, and by this means, the little liding of soil layers and small broken slumps of rock slopes can be avoided

    預應力板的支護機理:充分利用巖土層自身或預處理的局部的穩性,隨基坑開挖分層掛鋼筋網噴射砼,以避免土層幫片及巖石邊坡小的節理破碎滑塌,並把土壓力傳給板,由集中受力,通過固力平衡土壓力。
  14. Finally, the thesis primarily sets up the internal force model of the supporting structure system in the bi - arch tunnel, namely, the distribution model of the surrounding rock ' s pressure, the internal force model of the steel framework and the axial force model of the anchor bolt, and these results can have the guiding significance to the design and construction of the similar tunnel engineering

    最後,結合有限元的理論計算及現場實測數據的分析,初步建立了雙連拱隧道支護結構體系的內力模型,即:圍巖土壓力模型、初期支護鋼拱架內力(主要為軸力和彎矩)模型以及軸力模型。充分理解和闡述了構件的工作狀態,對今後類似隧道工程的設計和施工具有一的指導意義。
  15. Anchor pin bushing

    襯套
  16. These measures included the slope horizontal displacement monitor, the supporting structure swag monitor, the subsidence monitor, the pre - stress of anchor monitor, the ribbed beam steel stress monitor. we monitored the whole process and got feedback information in time, so the trend and development of slope " s displa

    在施工過程中,我們採取了邊坡穩性安全監測措施,主要包括邊坡水平位移觀測及支護結構撓度觀測;沉降觀測;以及應力監測;助梁鋼筋應力監測等。進行全過程的檢測並及時反饋信息,隨時掌握邊坡的位移趨勢與發展。
  17. By the analysis of the present computational models and methods on anchor bolts, the author deems that there are some disadvantages in these methods, such as : ( 1 ) the models ca n ' t reflect the relative slide between the bolts and geotechnical mass ; ( 2 ) the division of fem mesh is too complicated ; ( 3 ) some computational parameters of the bolts are difficult to determine

    論文中,通過對目前各種的有限元計算模型進行比較分析,發現它們存在著如下問題:無法反映和巖土體間的剪切?滑移作用;有限元網格劃分過于復雜;計算參數難以選擇和確等。
  18. In qingdao, this system has become one of main technologies in the field of deep foundation trench. the technology of anchor shot, which appeared 50 years ago in foreign countries, was only a temporary supporting measure during constructing

    噴技術,在國外50年代前,只是作為施工過程中的一種臨時性措施, 50年代中後期出現了灌漿和噴射砼,而作為基礎支護的工法於60年代在歐洲開始普及。
  19. According to the theory of developing viscous crude with screw pump and combined with the reservoir characteristic and oil property, fault block 70 is developed reasonably and effectively through a series of corollary technique including chemical pre - processing in the formation, viscosity decrease in the well bore, down - hole anchoring of screw pump, optimized design of screw pump, reasonable determination of the turning rate of screw pump, frequency alternating control, heat exchange and viscosity decrease in well head, monitoring of screw pump

    依據螺泵開采重油的理論,結合澤70斷塊稠油油藏的特點和原油物性,通過實施地層化學預處理、井筒降粘、螺泵井下、螺泵優化設計、螺泵合理轉速的確、變頻控制、井口換熱降粘、螺泵監測等一系列螺泵配套工藝技術,使澤70斷塊得以合理有效的開發。
  20. Fish - tailed anchor

    魚尾錨定桿
分享友人