錨定變形 的英文怎麼說

中文拼音 [máodìngbiànxíng]
錨定變形 英文
anchorage deformation
  • : 名詞(鐵制的停船設備) anchor
  • : Ⅰ形容詞1 (平靜; 穩定) calm; stable 2 (已經確定的; 不改變的) fixed; settled; established Ⅱ動詞...
  1. Fist of all, on the basis of the research of agone boffins, this author investigates the interaction mechanism of bolts and rock, and introduces the elastic ? lastic analytical resolution which is consist of the liner structure, the equivalent reinforced wall rock and the original wall rock in the simple loading from the equivalent well - proportioned view ; this solution is very important meaning for the engineering design. on the basis of coulomb friction model, the author introduces the finite element equation of the contact problem in order to provide the academic foundation for the application of msc. marc. finally, combining the engineering practice of the non - linear analysis of shield tunnel through yellow river of the south - north water transfer and using the model of friction, the author researched the evolution law of stress and displacement field in the structure of grouted rock bolts, and analyzed the effect to the stress and deformation of surrounding rock mass due to anchor supports

    首先,在前人研究成果的基礎上,對桿與圍巖的相互作用機理進行研究,利用全長桿的中性點理論,從等效均化的角度來考慮桿對圍巖的加固作用,並推導了在簡單荷載作用下,含有襯砌、等效加固后的圍巖、原始圍巖三者的彈塑性解析解,對工程設計有著重要的參考意義;在數值模擬方面,以考慮固圍巖滿足規則化庫侖摩擦模型為基礎,利用虛功原理推導了接觸問題的有限元方程的計算格式,為開發運用大型商用有限元軟體msc . marc提供了理論根據,也成了本文的理論基礎:最後,論文以南水北調東線穿黃隧洞穩性分析項目為工程實例,利用本文所述的接觸問題的摩擦模型理論,對桿支護結構的應力場、位移場的化規律進行了研究,分析了加支護對隧洞圍巖應力、的影響。
  2. As one of the. most effective rock shoring forms, rock - bolt reinforcement is still in use combining with some shoring forms such as three - dimensional vegetable netting, insufflating - virescence reinforcement, sash reinforcement and their effects are very distinctly

    但作為減小巖體側向、增強邊坡穩桿支護作為最有效的巖質邊坡的支護方式之一,仍廣泛地於三維植被網、邊坡綠化噴播、框格防護等式結合進行邊坡防護,效果非常明顯。
  3. 3. a space bond slip relation of reinforcements in either end of a member is proposed, based on one - dimensional bond slip model of reinforcements proposed by teng zhiniirmg from tsinghua university, the first - time loaded ascending stage ? curve of which model is modified as the line which parameters are not changed so as to simply the computation. the bond, slip is regarded as the boundary nonlinearity of a member

    3 、採用清華大學滕智明建議的一維鋼筋粘結滑移恢復力模型,但從簡化計算的角度出發,將首次加載的上升段曲線改為直線,並假構件端部的諸多縱向鋼筋的滑移服從平截面假,考慮由節點固區粘結滑移引起的構件端截面軸向和兩轉角附加
  4. This paper also presents the methods of controlling unstressed length of cable, pre - displacement of saddle, anchor span tension, erection of wire strands, the fixed position for erecting cable band and cable length. determination and control approach of displacement of saddles during cable erection are also introduced. at the same time, the change course of linetype during construction period for suspension bridge is analyzed

    再次,介紹了懸索橋的施工控制內容與方法,利用軟體sgkz2000對多座懸索橋進行了施工計算,提出本文關于懸索橋的主纜無應力長度控制、索鞍預偏量控制、跨張力控制、絲股架設控制、索夾安裝位置與吊索長度控制的方法;介紹了吊梁階段鞍座頂推量的確與控制方法,分析了施工階段懸索橋的線化過程。
  5. Secondly, in view of the limitation and shortage of traditional simulation of finite element approaches for bolt, a new composite grouted bolt element including nonlinear contacting relation will be built based on the above study of the mechanics mechanism of fully grouted bolt. then, an elastic - plastic finite element program will be developed for the analyses of tunnel stability, in which the composite grouted bolt element and nonlinear finite element analysis method will be used ; the patterns and the affect of main design parameters on the support effect of bolt will be analysed using the program, and conclusions of guidance importance for tunnel support design will be drawn. finally, simulation compution for the excavation and support of a highway tunnel will be made out using the above production, and the method of application of the program will be discussed ; analysis of the deformation, stress and distribution of plastic range will be done, and rational support plan will be worked out, which is of guidance importance for tunnel support design and the thery and technique of fully grouted bolt used in tunneling will be perfected further

    首先,本文在綜合分析隧道穩性影響因素及失穩破壞模式的基礎上,對全長粘結式砂漿桿作用力學機理進行了深入研究,為全長粘結式砂漿桿的有限元模擬分析奠了基礎;其次,針對傳統桿有限元模擬方法的局限性與不足,在上述全長粘結式砂漿桿作用力學機理研究基礎上,建立出能反映界面非線性粘結的新型復合砂漿桿有限單元模型;然後,運用上述復合砂漿桿單元模型,引進非線性有限元分析手段,開發了隧道支護穩性分析的有限元程序,並就全長粘結式砂漿桿的型式與設計參數對支護效果的影響進行了深入探討,得到了對隧道支護設計具有指導意義的結論;最後,運用本文研究成果對某公路隧道工程實例進行了開挖與支護的模擬計算,探討了其應用方法,並就隧道與應力及塑性區分佈規律進行了分析,從而提出了合理的支護方案,為隧道支護設計提供了參考依據,完善了隧道全長粘結式砂漿桿支護的理論與方法。
  6. The flexible retaining structure is another important retaining structure in soft soil. the integrated numerical analysis of this retaining structure ( including the methods and theory of calculating active earth pressure under sorts of conditions as well as the calculating method of horizontal stiffness coefficient of bracing structure and the method of deciding boundary condition etc. ) was gived. the effect of all parameters on the characteristics of retaining structure was discussed using methods of sensitivity - analysis

    本文針對目前常用的彈性支點法,給出了完整的數值分析方法,包括各種條件下的墻後土壓力的計算方法和原理、支撐系統(或拉系統)水平剛度系數的計算、邊界條件的確方法等,並以此為基礎採用靈敏度系數分析方法討論了各參數對圍護結構態的影響,指出土體側向基床比例系數是影響圍護結構的最主要的參數。
  7. At first, the mechanical model of joint is discussed, and the constitutive relation of the rough joint, especially the bolt - supported joint, is given. then bedding slide of bedding stratified rock slope is studied adopting limit equilibrium method, and a formula of stability is brought forward. at last, the bedding stratified rock slope ' s buckling deformation and failure mechanism and its evaluating method of stability is investigated, a corresponding mechanics model is established, then detail research to this failure mode is made in theory combining the energy law and elastic stability theory of plate and beam, and an analytical solution of the yielding curve is educed from this model

    文中首先對結構面的力學模型進行了一的探討,提出了粗糙結構面尤其是加結構面的本構關系;然後採用極限平衡法,研究了順向層狀巖質邊坡的順層滑動失穩,提出了其穩性計算公式;最後,結合能量律和彈性板梁穩理論,探討了工程中常見的順向層狀巖體邊坡潰屈失穩時的破壞機理、規律和穩量評價方法,建立了相應的力學模型,求出了其相應的解析解,並提出了臨界坡長與最大彎曲位置的確方法。
  8. At last, the analysis of the redistribution of the initial crust stress and the distribution of the plastic area is made ; the stability evaluation of the rock mass around the cavern is provided. the outcome is conformed with the reality. then applys the approximately equivalent dissolved rule, and considers the action of anchor staff to consolidate the rock mass, and correspond model is established, nonlinear finite element m ethod is applied to analyze the effect of the supports, the result shows that the action of anchor staff is obvious and deformation and stress state of the rock mass is greatly approved. so, the result conforms that the idea and the means used in the thesis is applicable

    最後運用非線性有限元對廠房開挖后圍巖的應力重分佈和塑性開展區的分佈作了分析,評價了廠房的圍巖穩性,其結果與實際開挖情況基本吻合,針對圍巖穩性評價的結果,提出了固方案,運用等效概化原理考慮桿的作用,建立了採用系統桿加固后的地下廠房圍巖的三維彈塑性模型,運用非線性有限元分析了加固效果,結果表明固作用明顯,圍巖明顯減小,圍巖內的應力狀態大為改善,從而驗證了本文所採用的研究思想和方法是切實可行性的。
  9. It was shown that the measured active soil pressures were smaller than the theoretical values and diminished with time, the measured pore water pressure decreased with the time and increased with the depth of soil, the combinative effects of cap girder and supporting structure were obvious which diminished the displacement of foundation pits, and the measured axial force of the anchor and interior steel beam were far less than the design force, indicating that the design safety factor of the foundation pit was too large to be economical

    基坑工程實行信息化施工並獲得了豐富的監測數據,通過對數據分析結果表明:實測主動土壓力小於計算主動土壓力,實測主動土壓力隨時間延長小:土體中孔隙水壓力隨時間增長而減小,孔隙水壓力隨深度增加而呈非線性增加;基坑冠梁協同作用明顯,冠梁減小了基坑索軸力比較穩,鋼撐軸力化相對較大,且二者軸力仍富餘較大,該設計比較安全。
分享友人