錨定點 的英文怎麼說

中文拼音 [máodìngdiǎn]
錨定點 英文
anchored point
  • : 名詞(鐵制的停船設備) anchor
  • : Ⅰ形容詞1 (平靜; 穩定) calm; stable 2 (已經確定的; 不改變的) fixed; settled; established Ⅱ動詞...
  • : Ⅰ名詞1 (液體的小滴) drop (of liquid) 2 (細小的痕跡) spot; dot; speck 3 (漢字的筆畫「、」)...
  1. Fist of all, on the basis of the research of agone boffins, this author investigates the interaction mechanism of bolts and rock, and introduces the elastic ? lastic analytical resolution which is consist of the liner structure, the equivalent reinforced wall rock and the original wall rock in the simple loading from the equivalent well - proportioned view ; this solution is very important meaning for the engineering design. on the basis of coulomb friction model, the author introduces the finite element equation of the contact problem in order to provide the academic foundation for the application of msc. marc. finally, combining the engineering practice of the non - linear analysis of shield tunnel through yellow river of the south - north water transfer and using the model of friction, the author researched the evolution law of stress and displacement field in the structure of grouted rock bolts, and analyzed the effect to the stress and deformation of surrounding rock mass due to anchor supports

    首先,在前人研究成果的基礎上,對桿與圍巖的相互作用機理進行研究,利用全長桿的中性理論,從等效均化的角度來考慮桿對圍巖的加固作用,並推導了在簡單荷載作用下,含有襯砌、等效加固后的圍巖、原始圍巖三者的彈塑性解析解,對工程設計有著重要的參考意義;在數值模擬方面,以考慮固圍巖滿足規則化庫侖摩擦模型為基礎,利用虛功原理推導了接觸問題的有限元方程的計算格式,為開發運用大型商用有限元軟體msc . marc提供了理論根據,也形成了本文的理論基礎:最後,論文以南水北調東線穿黃隧洞穩性分析項目為工程實例,利用本文所述的接觸問題的摩擦模型理論,對桿支護結構的應力場、位移場的變化規律進行了研究,分析了加支護對隧洞圍巖應力、變形的影響。
  2. Where good natural protection is not available a fixed hanger or ringbolt should replace the piton

    若該處並無良好的天然支,則應以固耳片或環形栓取代該巖釘。
  3. In anchoring effect, in addition to the influence of high and low anchor points on subjects price estimates, we also consider the moderating role of the operation of anchor points ( one - way / two way ), the reinforcement of anchor points ( normal / intensified ), and the relevancy between anchor and target ( relevant / unrelevant )

    效應的實驗中,除了考慮高低值對受測者價格估計判斷之影響,同時亦探討運作方式(雙向單向) 、強化作用(強化一般) 、以及訊息與估計標的物之間的語意相關性(相關不相關)等三個變數,是否會扮演類型對決策者估計影響之調節角色。
  4. 3. a space bond slip relation of reinforcements in either end of a member is proposed, based on one - dimensional bond slip model of reinforcements proposed by teng zhiniirmg from tsinghua university, the first - time loaded ascending stage ? curve of which model is modified as the line which parameters are not changed so as to simply the computation. the bond, slip is regarded as the boundary nonlinearity of a member

    3 、採用清華大學滕智明建議的一維鋼筋粘結滑移恢復力模型,但從簡化計算的角度出發,將首次加載的上升段曲線改為直線,並假構件端部的諸多縱向鋼筋的滑移服從平截面假,考慮由節固區粘結滑移引起的構件端截面軸向和兩轉角附加變形。
  5. Secondly, this paper made some theoretic researches on its engineering classfication and applicable scope for this technology ; then combining with project example, this paper carried out scheme design for this technology, and compared some different kinds of underpinning scheme and node and structure design, and put forward the method of " reinforcce steel bar through column " to build pile cap beam, " resistant bend and shear anchored reinforce steel bar " to strengthen column consolidation effect, and the method of " steel plate hoop " to build reinforcing bar connection of the foundation beam, etc. in the process of the consturction scheme research and implement, this paper synthetically elaborated the organizaton for project construction, put forward the construction technical measure of specific aim on the artificial pile, and pile cap beam, and underground adding layer and structure stabilization, and overall structure stabilization and so on. for this project, adopt reinforcing bar concrete to brace hole wall to ensure the safety of engineering in the artificial pile construction, use flexible connection catch to make the cage hoisting easier to simplify the construction process, use the method of earthwork statified symmetrical balance in the process of underground adding layer excavation

    本文首先對于基礎托換與結構加固技術的目的和意義、國內外發展狀況進行了綜合闡述;其次對該項技術工程分類及適應范圍進行了理論上的分析研究;然後結合工程實例對該項技術進行了方案設計,對比幾種不同的托換方案和節及構造設計,提出了「通筋穿柱法」做承臺梁, 「抗彎抗剪筋法」強化柱加固效果, 「鋼板箍法」做地基梁鋼筋連接等多項技術;在施工方案的研究和實施過程中,對于工程施工組織進行綜合闡述,並就人工挖孔樁、承臺梁、地下加層及結構加固、整體結構穩等專項施工方案提出有針對性的施工技術措施,人工挖孔樁施工採用鋼筋砼護壁確保挖孔樁的安全成型,使用柔性連接鉤進行鋼筋籠吊裝簡化施工工序;承臺梁施工採用梁主筋橫穿柱身化學膠固等;地下加層綜合施工技術採用土方分層對稱平衡開挖,分段挖土做筏基結構自穩等;最後對于該工程實施后的效果分析,說明該項綜合施工技術的可行性。
  6. The main functions of the module for initializing drawing environment are to set up the scale. linetype. breadth and frame of drawings according to the characteristics of the general arrangement drawing to passenger shippings. the main functions of the second module is to establish and extend graph library, retrieve from graph library and output graph blocks. using the parameterization design method to design interactively and modify automatically graphs of the local cabin are the tasks of the third module. in the help module, the drawing specifications of passenger shipping are integrated, such as equipments of anchor and moor, arrangement of cab, cabin and baggage, measures to come through and ration of passengers, etc. there are some advantages in the proposed system, such as friend interface, operation easily, drawing conveniently and modification automatically

    其中初始化繪圖環境模塊主要針對客船總布置圖繪制的特來完成比例、線型、圖幅和圖框的設置;客船總布置圖圖庫模塊主要完成圖庫的建立和擴充、圖庫的查詢以及圖塊的輸出;局部艙室參數化設計模塊採用參數化技術完成對局部艙室圖形的自動修改以及交互設計;客船規范幫助模塊則集中了一些武漢理工大學碩士學位論文客船繪制規范,如泊及系泊設備、駕駛室、乘客艙室及行李的放置、脫險措施及乘客額等規范。
  7. In tank seismic design considered the liquid sloshing, hydrodynamic pressure of tank shell, uplifting condition of unanchored tank and effective bottom plate width

    而未儲槽的槽壁上舉狀態分析,應將有效上舉部分的底板列入設計考量,這些都是儲槽耐震分析的重
  8. 5 fixed protection / anchors should not interfere with nearby existing routes

    5固栓之安裝不應干擾到其他鄰近的路線。
  9. The force control of suspension bridge anchorage cable is the main contents which will be researched. according to the character of suspen - sion bridge anchorage, three questions is solved in this paper on the basis of the construction control experience of the highway bridge of yichang yanzhi river. firstly, an effective method of cable force control is presented in this paper, which has settled the puzzle of cable force accurate operate through fixing a pressure transducer at the behind of the hydraulic jack. secondly, an exactitude calculation model is founded in this paper. in addition the influence of boundary condition, sag, inclination, flexural rigidity and environment temperature to the cable vibration frequency which make the frequency method could be used to the measurement of cable force. in the end of this paper, a control system of anchorage cable force is developed on the basis of the above research. this system is very steady, credible, high precision and convenient. it is a new and credible method to be used to the force control of sus - pension bridge anchorage cable. in this paper, the conundrum of cable force control has been solved. the fruits are very useful to the development of inland suspension bridge

    提出了一種有效可行的跨張力控制方法,即通過在油壓千斤頂后加壓力傳感器,並利用單片機技術進行數據採集,解決了懸索橋跨索股初張力精確控制的難題;建立了跨索股索力的精確計算模型,分析了索股的邊界條件、斜度、垂度、抗彎剛度及環境溫度對索股頻率的影響,解決了弦振法在大跨徑懸索橋索力測試中的應用問題;在上述研究成果的基礎上,研製出了跨張力控制系統,該系統具有穩可靠,精度高,使用方便等特,它的投入使用將為我國今後大跨徑懸索橋跨張力控制提供一種全新的、可靠的手段。
  10. Considering the difference in application scale, we designed a proximity based mobile beacon assisted localization algorithm ( pmaloc ) for the application of small scale, and designed a distance - in - hops based mobile beacon assisted localization algorithm ( hmaloc ) for the application of large scale

    演算法設計時考慮到應用規模的不同:針對小規模應用,設計了基於鄰近關系的移動輔助位演算法( pmaloc ) ;針對大規模應用,設計了基於跳計數的移動輔助位演算法( hmaloc ) 。
  11. Medium - sized drilling rigs for cge, including xy series core drills, gq series engineering drilling machines, mgj series anchoring drilling machines, directional drilling machines and hydraulic components etc

    系列桿鉆機和非開挖向鉆機的生產基地,也是我國生產各種中淺孔液壓巖芯鉆機的中型骨幹企業。
  12. According to the theory of developing viscous crude with screw pump and combined with the reservoir characteristic and oil property, fault block 70 is developed reasonably and effectively through a series of corollary technique including chemical pre - processing in the formation, viscosity decrease in the well bore, down - hole anchoring of screw pump, optimized design of screw pump, reasonable determination of the turning rate of screw pump, frequency alternating control, heat exchange and viscosity decrease in well head, monitoring of screw pump

    依據螺桿泵開采重油的理論,結合澤70斷塊稠油油藏的特和原油物性,通過實施地層化學預處理、井筒降粘、螺桿泵井下、螺桿泵優化設計、螺桿泵合理轉速的確、變頻控制、井口換熱降粘、螺桿泵監測等一系列螺桿泵配套工藝技術,使澤70斷塊得以合理有效的開發。
  13. The property of freedericksz transition and the bistable state for nematic liquid crystal ( nlc ) cell in the surface physics of liquid crystal ( lc ) have been one hot point of current lc science

    液晶錶面物理中弱向列液晶盒的freedericksz轉變的性質以及與此相連的雙穩態問題是目前液晶科學的一個熱問題。
  14. The property of freedericksz transition and the problem of bistable state for weak anchoring nematic liquid crystal ( nlc ) cell in the surface physics of liquid crystal ( lc ) have been one hot point of current lc science

    液晶錶面物理中弱向列液晶盒的freedericksz轉變的性質以及與此相關的雙穩態問題是目前液晶科學的一個熱問題。
  15. The results indicate : when reduced anchoring strength a is large and = 0 or > 0, the first order transition may occur at threshold point or at saturation point ; when a is very lager and = 0 and > 0, the uniform twisted solution jumps directly to the saturation solution

    結果表明:當反映強度的參量( = k _ ( 22 ) ? al )較大,且修正參量= 0或0時,在閾值或飽和可以發生一級轉變。當很大,且修正參量= 0或0時,還會發生均勻扭曲解直接轉變為飽和解。
  16. We think the value of anchoring strength and the sign of modified parameter of anchoring energy should not be regarded as determinant when we distinguish between the first order transition and the second one, otherwise we also explain the accurate condition of first order transition in non - symmetric cell and point out the essence of it

    討論了飽和的一級轉變問題,驗證上、下基板強度相同的液晶盒系統的一級轉變條件同樣適合不對稱盒系統,通過實例證明強度的大小及能修正系數的正負不能作為區分一級或二級轉變的參考條件。
  17. When a control is anchored to a form and the form is resized, the control maintains the distance between the control and the anchor positions

    當控制項到某個窗體時,如果該窗體的大小被調整,該控制項維持它與位置之間的距離不變。
  18. 10 when a fixed wire / sling / rope / cord is an essential point of protection then it should be removed and replaced with fixed hanger / ringbolt / rappel / abseil anchors

    當構成支的主要元件為鐵線/扁帶/繩索/細繩時,最好將之移除,並用固耳片/環形栓/下降固加以取代。
  19. The director in nlc cell may be expressed by one angle parameter 9 or, and it is called one dimension problem ; the director expressed by two angle parameters 6 and, called two dimension problem ; the paper consists of two absolute parts : l. the first order freedricksz transition at saturation point for the weak anchoring nlc cell the first order freedricksz transition ( the first order transition ) at threshold point has been studied by a lot of theoretical works

    液晶盒內指向矢可用一個角量或表示稱為一維問題,需要用兩個角參量和表示稱為二維問題。本文由兩個獨立的工作構成: 1弱向列液晶盒在飽和的一級freedericksz轉變現有的理論工作都討論在閾值的一級freedericksz轉變(一級轉變) 。
  20. And sets it to draw arrow anchor caps at the beginning of lines

    並對其進行設置,以便在直線的起繪制箭頭帽:
分享友人