錨臂 的英文怎麼說

中文拼音 [máobèi]
錨臂 英文
[船舶工程] anchor arm
  • : 名詞(鐵制的停船設備) anchor
  • : 臂名詞1. (胳膊; 從肩到腕的部分) arm 2. (人體解剖學上多指上臂) upper arm
  1. New ) arms act as anchors and body moves over arms

    新:手好像,身體滑過手
  2. First scheme is cantilever anti - slide pile with drain system ; the other scheme is pre - stress anchor rope anti - slide pile with drain system

    方案一為採用懸抗滑樁加排水措施;方案二採用抗滑樁加排水措施。
  3. Besides experiments, the present domestic and abroad study on anti - slide pile is mainly analysis by traditional cantilever beam method, foundation coefficient method and elastic mechanic method. on the basis of previous studies, this paper carries out a research on relevant design and calculation theory about anti - slide piles, comprising the interaction between anti - slide piles and rock and soil of side slopes, the soil arching model of anti - slide piles and the internal stress calculation method of prestressed anchor cables

    目前國內外對抗滑樁的研究,除試驗研究外,主要採用傳統的懸梁法、地基系數法及彈性力學方法來進行分析。本文在前人的研究基礎上,通過對抗滑樁相關設計計算理論進行研究,包括抗滑樁與邊坡巖土體的相互作用,抗滑樁的土拱效應模型以及抗滑樁預應力索的內力計算方法進行分析。
  4. Numerical simulation is carried under different conditions, including ( a ) the different distance between deep foundation excavations and the adjacent structures ; ( b ) different supports are used, such as cantilever piles, row piles with one - layer grouted soil anchor, row piles with two - layer grouted soil anchor, row piles with three - layer grouted soil anchor and soil nailings etc. this paper reveal the law of adjacent structures and bracing structures displacements and surrounding soil settlements. anchor and soil nailing ' s impact on the displacements of adjacent structures is analyzed then. further more, we find the law of displacements of bracing structures, surrounding soil settlements, differential settlement and absolute settlements of adjacent structures that may appear in the process of excavation by steps

    模擬分析了近鄰建築物在不同距離的條件下,懸支護、一層桿與排樁聯合支護、兩層桿與排樁聯合支護、三層桿與排樁聯合支護、土釘支護等幾種支護情況下的深基坑開挖過程,對深基坑工程開挖過程中近鄰建築物的變形、支護結構變形以及基坑外地層沉降的發展變化規律進行了分析總結;對桿和土釘支護對建築物變形的影響作了詳細地分析,找到了一些基坑開挖過程中基坑支護結構變形、周圍地層沉降、近臨建築不均勻沉降及絕對沉降的發展變化規律,得到了一些對深基坑工程設計和施工有工程實際意義的結論。
  5. C ) according the difference of geological condition and construction condition, this thesis select the best support among cantilever supporting pile, one - anchored supporting pile and soil nails support

    C )根據不同的工程地質和施工條件,優選懸支護樁、單層桿支護樁、土釘支護系列中的一種支護方案。
  6. Considering the difference of geological condition and construction condition, the thesis select the best form to save the money and make the work in security. a ) the pile support : according cantilever supporting pile, one - anchored supporting pile, the thesis compile a series of program with the method of criterion

    本文針對黃土地區懸支護樁、單層桿支護樁、土釘支護等不同的支護方案,優選了支護方法和結構形式,考慮了不同的地質條件和施工條件情況下,採用相應較合理的支護方案以達到安全可靠和經濟的目的。
  7. To clear a side of the control that has been anchored, click that arm of the cross

    若要清除已定的控制項的邊,請單擊該十字線的相應
  8. ( 3 ) rock bolts are used as an extension of the supporting piles. this structure solves the embedding problem of cantilever pile and is newly applied in foundation trench in china. no environment contamination appears in this old crowed town because no detonation or mechanical drilling

    ( 3 )利用巖石桿作為圍護樁的延伸成功地處理懸樁嵌固的問題,該結構方式的應用為國內首例,避免了在舊城鎮老房屋密集區基巖爆破和機械成孔對周圍環境的影響和污染。
  9. Taking the instance of the design of prestressed anchor cable slide resistant pile for the harnessing of k1158 + 640 landslide of jiaozuo - liuzhou railway, and on the basis of demonstrating the geological characters and stability analysis of landslide, this paper discusses the design and calculation for the selection of optimum locations of slide resistant pile distribution, the length of prestressed anchor cable and the number of hole diameter anchor cable, and also the design of the diameter of the slide resistant pile and reinforcement

    摘要以焦柳鐵路k1158 + 640滑坡治理工程設計為實例,在闡述滑坡的地質特徵、穩定性分析的基礎上,依據滑坡下滑力曲線,選取抗滑支檔工程布置的最佳部位,進行懸抗滑樁、預應力索抗滑樁兩種方案的經濟技術比較,確定選用預應力索抗滑樁方案。
分享友人