錨臺 的英文怎麼說

中文拼音 [máotái]
錨臺 英文
anchor chock
  • : 名詞(鐵制的停船設備) anchor
  • : 臺名詞(指臺州) short for taizhou (in zhejiang province)
  1. The bilge water of fore chain locker is discharged by one independent bilge hand pump ( cs ? 32h )

    艏部鏈艙的艙底水由單獨設置的1艙底水手搖泵( cs ? 32h )排出。
  2. The eccentric mass type vibration generators are bolted to the platform.

    偏心量型式的振動發生器固在身上。
  3. Load out contractor s riser at zhanjiang anchorage

    在湛江地把承包商的隔水管裝上平
  4. " prestress anchor ribbed beam support system " is a new practical support technology which came from soil nailing walls system and un - embedded rank of piles with anchors support system that has been used successfully for 4 years by the author and his company named qingdao deep foundation stabilization engineering co., ltd. it " s mechanism is similar to rank of piles with anchors support system that can not be inserted into the bottom of foundation trench, but it " s ribbed beams are used to replace rank of piles made before excavation so the work cycle can be shortened and the support system cost can be reduced ; meanwhile this system maintains the soil nailing wall " s convenience of digging and supporting

    「預應力桿肋梁支護技術」是筆者及所在單位歷時四年在土釘墻和無嵌入多排樁兩種支護體系基礎上開發應用成功的一種新型實用性支護技術。其支護機理類似於未嵌入坑底的排樁多支護,只是由肋梁代替了開挖前施工的排樁從而提前工期並降低支護造價;同時繼承了土釘墻隨挖隨支護的機動靈活性。自1998年至今該技術已在青島、濟南、煙等十幾個深基坑和高邊坡工程中成功應用。
  5. Although the accuracy in meterological forecast of tropical cyclones has been distinctly improved, it is still a difficult problem confronting masters and anti - typhoon team leaders of the companies how to steer clear of typhoon reasonably and safely in case that the actual resistance to typhoon is strong enough, the sea area wide enough, and the time permitting ; to avoid unreasonable deviation, anchoring for shelter, blindly rushing onto her path, being involved in storm area, even into the the center of typhoon ; under the limitation of the condition of the sea area and time. how to take correct meassures to escape, such as navigating with wind or windward in bias angle, slowing down, anchoring, berthing alongside the warf, mooring to buoy, etc. as early as possible

    盡管氣象部門對熱帶氣旋監測預報的準確率已經比過去有了明顯的提高,然而船舶在海上如何避離風,如何做到在本船實際抗風能力允許、海域條件允許、時間也充裕的前提下合理避,安全避,避免不合理的繞航、 「扎風」 ,避免盲目冒進「搶風頭」 ,更避免被捲入強風區甚至風中心;在海域條件受限、時間尷尬的情況下又如何正確採取偏順航、偏頂航、滯航、泊、系岸、系浮等抗措施和技術,盡快擺脫風的影響,仍然是擺在船長和公司防抗領導小組面前的一個實實在在的難題。
  6. Secondly, this paper made some theoretic researches on its engineering classfication and applicable scope for this technology ; then combining with project example, this paper carried out scheme design for this technology, and compared some different kinds of underpinning scheme and node and structure design, and put forward the method of " reinforcce steel bar through column " to build pile cap beam, " resistant bend and shear anchored reinforce steel bar " to strengthen column consolidation effect, and the method of " steel plate hoop " to build reinforcing bar connection of the foundation beam, etc. in the process of the consturction scheme research and implement, this paper synthetically elaborated the organizaton for project construction, put forward the construction technical measure of specific aim on the artificial pile, and pile cap beam, and underground adding layer and structure stabilization, and overall structure stabilization and so on. for this project, adopt reinforcing bar concrete to brace hole wall to ensure the safety of engineering in the artificial pile construction, use flexible connection catch to make the cage hoisting easier to simplify the construction process, use the method of earthwork statified symmetrical balance in the process of underground adding layer excavation

    本文首先對于基礎托換與結構加固技術的目的和意義、國內外發展狀況進行了綜合闡述;其次對該項技術工程分類及適應范圍進行了理論上的分析研究;然後結合工程實例對該項技術進行了方案設計,對比幾種不同的托換方案和節點及構造設計,提出了「通筋穿柱法」做承梁, 「抗彎抗剪筋法」強化柱加固效果, 「鋼板箍法」做地基梁鋼筋連接點等多項技術;在施工方案的研究和實施過程中,對于工程施工組織進行綜合闡述,並就人工挖孔樁、承梁、地下加層及結構加固、整體結構穩定等專項施工方案提出有針對性的施工技術措施,人工挖孔樁施工採用鋼筋砼護壁確保挖孔樁的安全成型,使用柔性連接鉤進行鋼筋籠吊裝簡化施工工序;承梁施工採用梁主筋橫穿柱身化學膠固等;地下加層綜合施工技術採用土方分層對稱平衡開挖,分段挖土做筏基結構自穩等;最後對于該工程實施后的效果分析,說明該項綜合施工技術的可行性。
  7. The studies of the anchorage performances of steel column bases under uniaxial reversed loads are carried out through tests and theory

    為此本文進行了單向重復加載下的鋼筋混凝土承-鋼柱腳試件固性能試驗研究和理論分析。
  8. Note : n0. 1 pilotage and quarantine anchorage and the shelter anchorage are available for vessels of less than 500 gross tonnage or those approved by the competent authority ; n0. 2 pilotage and quarantine anchorage is for all vessels ; tanker cargo - oil transferring anchorage is only for tankers carrying out oil transferring operations

    注:煙港第一引航檢疫地和避風地供500總噸以下的船舶和經主管機關批準的船舶泊;第二引航檢疫地供各類船舶泊;油輪過駁地限於過駁作業的油輪泊。
  9. The heavy load ropes used in the sea, fishery and coast industries, fishing system, rescue system, offshore platform systen, the ropes for berth, anchoring, survey system for the ociasion earthquake, and cable systems

    ? ?在海洋,漁業和海岸工業中使用的重負荷繩索。海上打澇系統,救援系統,海洋石油平系統,停泊、拋、嵌入系泊線、海洋地震勘測、海底電纜系統。
  10. B 378. load out contractor s riser at zhanjiang anchorage

    在湛江地把承包商的隔水管裝上平
  11. Berth 40, slip seven at the marina

    碼頭40船7
  12. This paper describes the construction technique of offshore anchoring rod rock - socketed piles for dalian beiliang oil product terminal, with the emphasis laid on the construction method of offshore construction platform, cleaning up inside piles, rock - socketed anchoring rod, and anchoring bolt, as well as means for dealing with special situations during construction

    摘要介紹大連北良石化成品油裝卸碼頭海上描桿嵌巖樁施工技術,著重介紹海上施工平、樁內清理、嵌巖桿、固硅的施工方法及施工中特殊情況的處理。
  13. Lin, c. h., " rational for limits to reinforcement of tied concrete column, " ph. d. dissertation, department of civil engineering, university of texas, austin, texas ( 1984 )

    陳永松,鋼筋混凝座鋼筋握裹滑?之預測,碩士論文,國立成功大學建築研究所,南( 1982 )
  14. Lin. c. h. ( 1984 ) : ” rational for limits to reinforcement of tied concrete column, ” phd. dissertation department of civil engineering, university of texas, austin, texas

    陳永松( 1982 ) :鋼筋混凝座鋼筋握裹滑移之預測,碩士論文,國立成功大學建築研究所,南。
  15. Ka lok s car breaks down on the road and is about to be hit and an app.

    美麗可愛的粉紅芭比趙家樂徐若?的車子毫無預警地在馬路上突然拋熄火,眼睜睜看著一近. .
  16. The shantou bay suspension bridge is the first mordern suspension bridge in china its substructures are mainly towers and anchorages this paper presents some of the key techniques of the substructures construction , including the cable anchorage system setup , the hydrated heat control in the anchorage , construction of the foundation and bearing plate of the tower in the ocean , the control of tower construction , etc

    汕頭海灣大橋是我國第一座現代懸索橋下部結構主要包括索塔和碇本文介紹了該橋下部結構施工的一些關鍵技術環節,包括主纜固系統的安裝,大體積混凝土的溫控防裂,主塔基礎和承的海上施工,塔柱滑模施工控制等
  17. With sovereignty 4, a monument upgrade platform can be anchored and built next to an outpost which already has a pedestal upgrade

    在主權等級4下,紀念碑升級平可以被定並建立在已經擁有基座升級平的站旁邊。
  18. With sovereignty 3, a pedestal upgrade platform can be anchored and built next to an outpost which already has a foundation upgrade

    在主權等級3下,基座升級平可以被定並建立在已經擁有基礎升級平的站旁邊。
  19. With sovereignty 2, a foundation upgrade platform can be anchored and built next to an outpost. after downtime, this will enable the installation of a single tier 1 improvement

    在主權等級2下,基礎升級平可以被定並建立在哨站旁邊。當停機維護后,它將可以安裝單一的一級提升。
  20. A c p anchors chains

    鏈試驗
分享友人