鍋爐爐排 的英文怎麼說

中文拼音 [guōbèi]
鍋爐爐排 英文
boiler grate
  • : 名詞1. (炊事用具) pan; pot 2. (裝液體加熱用的器具) boiler; cauldron3. (某些器物上像鍋的部分) bowl (of a pipe, etc. )
  • : 排構詞成分。
  • 鍋爐 : boiler; furnace
  1. The boiler discharged steam.

    放了蒸汽。
  2. Design and study of biomass briquette boiler

    雙層生物質成型燃料設計與研究
  3. As to simple turbine, steam discards directly into atmosphere, or into condensator for cooling, then goes back to boiler for use

    在簡單的渦輪機中,蒸汽被入大氣,或進入冷凝器冷凝成水后流回
  4. Manufacturers ' data report for watertube boilers, superheaters, waterwalls, economizers

    水管過熱設備壁水管和熱力裝置的生產商數據報告
  5. Water supply for high rise building, fire profection, heating, chilledwater in rhe air conditioning system, town main, residential complex, industrial application, and iow pressure circulator of the boiler system

    高層建築生活、消防、採暖、空調系統給水,城鎮、城市住宅小區公共供水,也可用於工礦企業給水以及低壓循環給水。
  6. Specifications of coal for chain and travelling grate stoker boiler

    鏈條用煤技術條件
  7. Usages : exhaust pipes of aircraft, boiler covers, heat exchangers, boiler pipes, some parts that are impossible for heat treatment after welding or assembling

    航空器氣管、蓋罩、熱交換機、用管、延展接頭等的焊接、接合后無法熱處理的零部件及設備。
  8. The measurement of the running result indicates that its efficiency achieves 90 to 93 percent when using in a liquid state pulverized coal fired boiler and 92 to 95 percent when using in a solid state ptdverized coal fired holiler

    運行測試表明:用於液態渣煤粉,其除塵效率達到90 93 ;用於固態渣煤粉,其除生效率達到93 95 。
  9. With the coal gas producer furnace as heat resource, in low temperature burning, the sulfur dioxide and dust withdrawal is lower than the national standard. therefore under normal work condition, regardless of the boiler size all may achieve the smokeless running

    採用煤氣發生做熱源,由於低溫燃燒,二氧化硫及煙塵的放量低於國家標準,因此在正常工作狀態下,無論大小都可以達到無煙化運行。
  10. Cleaning technology of power station boiler, condenser and discharge line

    火力發電廠電站、凝汽器、灰管清洗技術;
  11. The improvement of a 6. 5t h spreader stoker - fired furnace with pneumatically operated dumping grate

    拋煤機翻轉改造
  12. Note : periodic relief valve discharge may occur on dead end service applications, such as boiler feed lines or cooling tower makeup lines

    注意:在終端應用中,如給水管線或冷卻塔補水管線,安全閥可能會出現周期性放。
  13. Coal - water slurry is a new type of clean fuel as a replacement for oil. this paper introduces the tests of maoming no. 2 oil - fired 220 t / h utility boiler being retrofitted to fire coal - water slurry, including slagging tendency, heat transfer performances and pollutant emissions. firstly the k - ? two - equation turbulence model is used in numerical simulation for the side - air burner, compared with the practical measures and tests, good accordance achives

    水煤漿是一種低污染、高效率、流動性強的代油新型清潔燃料,本文針對廣東省茂名熱電廠2 #油改燒水煤漿示範工程,對改造后的結渣特性、內傳熱特性和污染物的放特性進行了試驗研究。
  14. When the water is full, the bwf should be stopped immediately, then to weak firing and open blowdown and drain valves till the water level returns to normal

    滿水后應減少給水或及時水,立即停止給水,並減弱燃燒,開啟污閥及流水閥,直到水位恢復正常后才關閉。
  15. A bad combusting condition had been occurring on the two boilers typed dg670 / 13. 7 - - in the huanggezhuang power plant for two years : 2003 - 2004. there were fourteen times boilers break without arrangement which has had a serious influence on the development of the company. in order to improve the combusting condition of their boilers and prevent the “ four - pipes ” from leaking, we made experiments and improvements on the combusting system of # 22 boiler

    黃桷莊電廠dg670 / 13 . 7 -型型微傾斜底液態近兩年燃燒狀況不好, 2003年- 2004年兩臺「四管」泄漏非計劃停共14次,嚴重影響了電廠的經濟運行,使電廠的效益有較大的滑坡。
  16. To solve the frequent ash and slag stacking in the ash - pit under the 600 mw supercritical boiler for huaneng shanghai shidongkou no. 2 power plant, the high resolution acoustics imaging real - time monitoring system was developed using underwater acoustics imaging technology

    摘要結合華能上海石洞口二電廠600mw超臨界底灰坑頻繁堆渣放的實際情況,利用水下聲納成像技術,開發了高解析度聲納成像實時監視系統。
  17. Installations for oil supply systems for oil burners - part 2 : safety requirements and tests : parts, valves, pipes, filters, oil de - aerators, meters

    燃油供油系統的安裝.第2部分:安全性要求和試驗.零件閥門,管道過濾器油氣器和儀表
  18. Collect dust ; drain smoke, air supply and suction for high - temperature furnace, air conditioner and boiler, incinerator and public hazard prevention

    集塵、煙、高溫、空調、風、焚化
  19. Collect dust, drain smoke, air supply and suction for high - temperature furnace, air conditioner and boiler, incinerator and public hazard prevention

    集塵、煙、高溫、空調、風、焚化、防制公害等。
  20. The method of cell modeling is used for modeling the flow, combustion, heat transfer and pollutants generation process in the furnace of 600mwpulverized coal boiler, the temperature distribution and gas species distribution inside the furnace is got by it

    應用小室模型對600mw燃煤內流動、燃燒、傳熱及污染物放進行了一維數值模擬研究,得出了內溫度和各個不同組分沿膛高度的分佈。
分享友人