鑄鋼廠 的英文怎麼說

中文拼音 [zhùgāngchǎng]
鑄鋼廠 英文
cast steel plant
  • : Ⅰ動詞(鑄造) cast; coin; make Ⅱ名詞1. (古國名) zhu, a state in the zhou dynasty2. (姓氏) a surname
  • : 鋼名詞(鐵和碳的合金) steel
  • : 廠同「庵」 (多用於人名)
  • 鋼廠 : steel mill
  1. Widely employed in coal mine, downhole coal bunker, coal washery, cement factory, foundary, thermal power plant, sintering plant coal gas factory, fertilizer plant, chemicals plant, aluminium plant, alkali factory, steel works, coking plant, pharmaceutical factory, mine, dock, foodstuff, and feedings process works, concrete process, etc. with bunker, hopper, transmitting pipeline and drawshaft

    廣泛用於煤礦、及井下煤倉、洗煤、水泥、火力發電、燒結、煤氣、化肥、化工、鋁、制堿、焦化、制藥、礦山、碼頭、糧食、飼料加工、混凝土加工等擁有料倉、料斗、輸送管道和礦山溜井的礦企業。
  2. Multi - laboratory center of pangang is worked for production of steel - making factory. many producing processes, such as desulfurize 、 extracting - vanadium 、 steel - marking 、 refine out ladle ( lf 、 rh ) 、 caster etc, need directing and controlling by sampling and analysis, in order to get chemical composition information of molten iron 、 semisteel 、 molten steel 、 vanadium slag and slag and develop producing

    綜合化驗中心是為煉生產服務的,煉各生產工序如脫硫、提釩、煉、爐外精煉( lf 、 rh ) 、連等,都必須通過取樣、化驗分析來實時獲得鐵水、半水以及提釩釩渣、爐渣等化學成分來指導、優化生產。
  3. Refractory products. dimensions of ladle bricks for steelworks and foundries

    耐火製品.煉包襯磚的尺寸
  4. Being resipansible for technology guality of this unit, i have arganized and completed or then 10 great consultative projects in meteluvgical industing including feasible research repart and preliminary design of dan yang ring - type sintering plant loaned from world bank. designed no. 6 semi - contiuars rolling mill line of shagang group ; nangang group steel making plant water treatinent system, feasible research report and preliminarg design of nangang group no. 3 continuous casting machiue and hebei wwan iron making co. 24m2 rinn - tgpe sintering plant, as chief - disigner, none argamizing working drawing disign far it

    作為本單位技術質量負責人,近年來組織了完成了10餘項較大規模的冶多工程咨詢任務,其中包括世行貸款的丹陽環燒工程可研和初步設計;擔負港沙集團六軋車間半連軋生產線設計;南集團煉水處理系統完善;南集團煉矩形櫃連可研及初步設計;河北武安市鐵業公司24m ^ 2環燒工程擔任總設計師,完成了初步設計,正組織開展施工圖設計。
  5. Success in addition of no. 2 slab caster of the pangang iron and steel co. have brought large economic and social benefits ! the succeed example design of automation are provided for the decision and popularization and implementation of add for old equipment. this project was conjoin of design and program and debug. the control effect of no. 2 slab caster is satisfying, moreover, achieve high speed and whole automatic aim

    新增2 #板坯連機的成功,將具有很好的經濟和社會效益,尤其是該項目的自動化設計方案為自動化控制系統在企業舊設備改造及再增加新設備時的決策、推廣、實施提供了一套較為有效的、可供借鑒的方法和模式。
  6. It is attached by 5 branches : one cast iron factory, one iron pipe factory, one pipe fitting factory, one metals factory, one steel window frame factory

    下設煉鐵管件金屬製品等五個分
  7. Here the wealth of the land lies below the surface in rich coal seams, and the mining villages have grown into busy towns around iron and steel foundries, chemical works and oil refineries

    這里礦藏豐富,地表下有厚厚的煤層,因發展採掘業而形成的村落現已成為繁華的城鎮,周圍有、化工及煉油
  8. Of of of the linfen huge mythical bird peaceful magnesium industrylimited company steel casting foundry is domestic specialized isengaged in the special casting ( centrifugal casting ), one of theproduction, the research, the development, sales science andtechnology enterprises

    臨汾鵬泰鎂業有限公司鑄鋼廠是國內專業從事特種造(離心造) 、生產、研究、開發、銷售的科技型企業之一。
  9. There are arc - furnaces of all sizes, refiner furnace for casting steel in the forging workshops, and there are blast cupola and main frequency furnace for casting iron and copper

    造分有各種噸位大中小電弧爐包外精煉爐鐵,銅有沖天爐工頻感應爐。
  10. The company has several workshops that possess processing ability in casting steel and iron, welding, machining large parts and electric device, assembling and trial running

    桂林市固力橡膠機械製造有限公司在桂林橡膠機械等處設有製造基地,具有鐵、焊接、大型零件加工、電氣裝置製造和裝配試車的能力。
  11. In the research case of 11 tapping during night shift on december 31, 2000, optimized schedule strategy can cut down 65 minutes at most used for processing from charging into converter to slab out of caster for each tapping. with the model, it is possible to dynamically adjust schedule and reorder or reorganize production process

    以煉2000年12月31日中班11爐連的生產調度計劃為例,利用模擬模型制定和優化的調度計劃使水從煉到連的作業時間最大可以節約65分鐘;利用煉生產調度時間petri網模型,還可以根據實際生產條件的變化(譬如設備故障)對生產進行動態調整,以方便組織生產。
  12. Pangang iron and steel co. exits one set of double slab caster, but continuous casting rate is 50. 6 % and under metallurgy industry average, and its mould casting devices are established at the beginning of 1970s, the devices are old, consumed energy is high, severity pollution, low metal callback, quality is not stable, these restrict competition for market

    現有一臺雙流連機,但其全年連比才50 . 6 % ,低於我國冶金行業平均水平,並且其現存的模錠設施系七十年代初建成,設備陳舊、能耗高、污染嚴重、金屬收得率低、產品質量不穩定,制約了攀產品在市場上的競爭力。
  13. Considering the influence of material original flaw, the thesis gave the 4 # 125t crane of no. 3 steel - making plant of maansan steel co. for example to analyze the designing and remaining life of the crane ' s girder by using damnification limits design method. the method was based on the theory of rupture dynamics and the principle of disrepair - security

    本文以馬第三煉4 # 125t造起重機主梁下蓋板大面積可見裂紋情況為例,考慮材料初始裂紋的影響,在斷裂力學理論和破損?安全設計原則的基礎上,採用損傷容限設計法來重新計算造起重機的設計壽命;並對正在服役的造起重機計算其剩餘壽命,為造起重機的安全運行提供了較可靠的理論依據。
  14. The fem model was accurate and effective by using submodel and error estimation technique that ensured the reliability of calculation and analysis. the thesis got the measure of critical flaw and designing life of the girder. in addition, the thesis calculated the remaining life of the girder while the flaw reaching 150mm

    結合有限元分析結果和損傷容限設計方法,本文計算了馬第三煉4 # 125t造起重機主梁下蓋板的臨界裂紋尺寸,及初始裂紋為0 . 5mm時主梁的設計壽命,並估算了在裂紋尺寸達到150mm時主梁的剩餘壽命。
  15. In order to suit for the changes and the requirements for market, pangang iron and steel co. have being setted up bloom continuous casting machine

    新上「大方坯連機」項目是攀根據市場需求,也是適應市場變化的情況下提出的。
  16. In order to raise continuous casting ratio, improve product quality, decrease power consumption, fit in with the changing needs of the internal and external markets, pangang iron and steel ( group ) co. decided to invest a fall continuous casting construction project

    全連工程是攀為提高連比、提高質量、降低能耗、適應國際國內市場要求而投資新建的。
  17. Jinzhou shuangling precision casting factory lie on shuangyang town. jinzhou city liaoning prov. it is 13 km away from jinzhou airport. 23 km from jinzhou port. the factory occupies land area of 10 thousands m2. the total asset value is rmb 10 millions. there are more than 300 staffs and 55 of which are engineering. now the factory owns water glass 、 colloidal sillica process to produce about 2000 kinds of precision castings, including mineral mechanical parts that are made of plain carbon steel 、 alloy steel 、 stainless steel more kinds of other metal. the annual production capacity is 2000 tons of precision steel casting

    錦州市雙凌精密位於遼寧省錦州市雙羊鎮內,區距錦州機場13公里,錦州港23公里,佔地面積10000平方米,本現有職工350人,其中專業技術人員55人,固定資產1000多萬元,工擁有先進設備,採用水玻璃、硅溶膠工藝,生產普通、不銹等多種材質, 2000多種礦山機械配件、工程機械配件、汽車配件等精件產品,年生產能力2000噸。
  18. When the data of logistics in current process are used for input of simulating logistics in future 100 % continuous casting process, supply of hot metal from iron - making process may not satisfy the needs of 100 % continuous casting on raw materials. because planning scheme in continuous casting process depends greatly on smelting scheme in convertor vessel, it is important for operator to balance raw materials supply, smelting and casting in order to realize the scheme of 100 % continuous casting. when some equipment are work abnormally, mixer of hot metal and lf furnace can be used for logistics buffer

    用攀生產數據對模擬軟體系統進行的測試和模擬研究結果表明:模擬系統的隨機數發生演算法可以實現對作業時間的依分佈隨機抽取;在相似的輸入條件下,模擬結果與實際生產物流的時間分佈規律基本吻合,達到了模擬軟體設計的預期目標;若以攀提釩煉現工藝的鐵水輸入作為全連后的輸入條件,則現工藝的物料供應能力可能難以滿足全連生產的要求;連機的連澆計劃對轉爐爐次計劃的編制有很高的要求,合理安排來料、煉與澆三者間的物流平衡關系將是保證全連作業的重要條件;當出現設備異常情況時,可以利用混鐵爐與lf爐站前等待作為物流緩沖池,通過延長系統的平均物流時間來緩解因設備檢修和故障等擾動所造成的影響,確保生產的順利進行。
  19. The company area 7, 500 square meters, the floor space nearly 6, 000 square meters, the fixed asset 5 million yuan, are a specialized precision casting factory, produces each kind of stainless steel, the carbon steel and the copper alloy casting

    公司佔地面積7500平方米,建築面積近6000平方米,固定資產500萬元,是一家專業的精密家,生產各類不銹、碳及銅合金件。
  20. Because have a series of generally acknowledged merits, such as high efficiency, high quality, high lumber recovery with low costs, etc. to cast steel in succession, every country in the world, which is developping energetically, cast and liken improving to optimizing for the structure of steel factory, strengthen the key link that the market fought for ability and increasing economic efficiency as the central link

    由於連續具有成本低、高效率、高質量、高成材率等一系列公認的優點,世界各國都在大力發展,把提高連比作為結構優化,增強市場競爭能力和提高經濟效益的中心環節。
分享友人