長圓形設計 的英文怎麼說

中文拼音 [zhǎngyuánxíngshè]
長圓形設計 英文
obround design
  • : 長Ⅰ形容詞1 (年紀較大) older; elder; senior 2 (排行最大) eldest; oldest Ⅱ名詞(領導人) chief;...
  • : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • 設計 : devise; project; plan; design; excogitation; layout; layout work; styling
  1. Fluid noise mainly comes from out put pulsation of rate of flow, the main reason of out put pulsation of rate of flow is the instant high pressure return flow that obturation cubage produced when the big round curve pressure transition. the v trough on the port plate can reduce the fluid noise. in this paper, the author based on the acting of dam a river and condensability of liquid and used matlab language as tool to calculate the v trough on the original port plate and drew out the p - t diagrammatic curve and analyzed its shortcoming and improved the design of original v trough and got that the best size of its angle was 12. 3 and its length was 5mm and the cross section was an equilateral triangle

    流體噪聲主要來源於輸出流量脈動,造成輸出流量脈動的主要原因是閉死容積在大弧段壓力切換時產生的瞬時高壓迴流,在配流盤上開v型尖槽可降低因高壓迴流而引起的流體噪聲,本文以截流作用和液體的可壓縮性為理論依據,以matlab語言為工具,對原配流盤上的v型尖槽進行了理論算,繪制出p - t圖線,分析了它的不足,並對原有v型尖槽進行了優化,得出了v型尖槽的最佳幾何尺寸:配流盤平面上的v型尖槽的兩邊的夾角為12 . 3 ,槽5mm ,槽的橫截面為等邊三角
  2. Based on the close analysis of the influence factors of the vertical bearing capacity, circular aperture extension theory is employed to establish the computing formulas for the pile vertical stress and the foundation vertical bearing capacity, respectively. moreover, with analyzing the features of the calculation parameters such as materials of gunite mortar, jet pressure, diameter of the jet pipe, pile length, pile layout, a design theory for chemical churning pile composite foundation is proposed. then, the variation of the pipe deformation with loads, the deformation coordination of pile and soil are studied

    在此基礎上深入探討了旋噴樁的樁土受力特性及其復合地基的加固機理,從影響旋噴樁復合地基豎向承載力的因素入手,基於孔擴張理論給出了樁體豎向應力及旋噴樁復合地基的豎向承載力算公式;通過對噴射漿液、噴射壓力選取、噴射直徑估算、樁及樁位等各種算參數的深入分析和研究,提出了一套相應的旋噴樁復合地基算方法;通過算分析,深入探討了旋噴樁復合地基變隨荷載變化規律、樁和樁間土變協調關系、樁土應力比及復合地基壓縮模量的確定,並提出相應的方法和修正參數;此外,結合工程應用,對旋噴樁復合地基的施工技術及其現場質量檢測方法進行了較全面的探討。
  3. Witch has worked out the tooth shape of datum rack and computer simulation of gear manufacture. pointedness, undercut and tooth tip becoming sharp are analysed. tooth thickness calculation and measurement, superposition coefficient calculation and belt length calculation are resolved

    2 、給出了基準齒條的齒廓狀,進行了齒輪加工算機模擬,分析了可能出現的稜角問題,進行了齒輪內齒頂的求解、根切問題分析、齒厚算與測量、齒頂變尖的分析、重合度的算、帶度的算及齒輪的程序編制等。
  4. A new waveguide made of changing a wide wall of a rectangular waveguide to a uniform curved wall is called conformal waveguide. a kind of expression of approximate solution for domain mode of the new waveguide, including symmetric, unsymmetric arc, parabolic arch, hyperbolic arch, elliptic arch, etc., is constructed by using boundary condition of mental waveguide, variational method and boundary element method. by using the equivalence principle, an approximate calculating formula for equivalent resonant conductance of a narrow longitudinal halfwavelength slot cut in the curved wall of the unsymmetric arcrectangular waveguide is derived, and the result is shown. although this solution is approximate, it can solve the problem in designing the slotted antenna of such conformal waveguide

    把矩波導一個寬面外突成均勻曲面構成的新波導統稱為共波導.利用金屬波導邊界條件、變分法、邊界元素法構造這種新波導中主模場的一種近似解表達式,包括曲面橫截線為對稱、非對稱弧,拋物線弧,雙曲線弧,橢弧等.然後根據等效原理,推導非對稱弧矩波導曲面上窄的縱向半波縫隙的等效諧振電導的近似算公式,給出算曲線.這種解雖然是近似的,但卻能解決這類共波導縫隙天線的工程
  5. Considering that the characteristics of our country ' s highway tunnels are always of long spans, tabular and of various geometry, by means of thorough analysis of the different problems existed in the design of support structures of the tunnels at present, this paper pays special attention to the two key problems, optimization method of form selection of structural section of the tunnel as well as the stability and bearing capacity of the support structures, in the design of the long and large tunnel on high - class highway, introduces the simplified complex - form optimum method in the structure optimization theory, discusses the optimum design model of lining section of highway tunnel with satisfying demands in building clearance, ventilation and load conditions, puts forward an optimization method of form selection of three different kinds of lining sectional forms ( i. e. single - center circle, three - center tabular circle and three - center sharp circle ), establishes a complete set of systematic optimum design the ory and method of long and large tunnel on high - class highway, develops the corresponding computer software used on the planned xuefeng mountain highway tunnel on shaoyang to huaihua expressway in hunan province for optimization of form selections of the structural sections, and obtains a series of relatively reasonable structural design parameters

    本文針對我國公路隧道多為大跨度、扁平、幾何狀呈多樣化的特點,通過深入分析目前隧道支護結構中存在的各種問題,抓住高等級公路大隧道中隧道結構斷面的優化選型及隧道支護結構的穩定性與承載能力兩個核心問題,引入結構優化理論中的簡易復合優化方法,深入探討了滿足建築限界、通風條件、受力狀態約束等條件下公路隧道襯砌斷面優化模型,提出了三種襯砌斷面狀(單心、坦三心和尖三心)的優化選型方法,建立起一套完善的高等級公路大隧道的系統優化理論與方法,並開發出相應的算機程序,用於擬建的上海至瑞麗國道主幹線湖南省邵陽至懷化高速公路雪峰山大高速公路隧道的結構斷面優化選型,得出了一系列較為合理的支護結構參數。
  6. In the paper, based on the method of low pair replacing with high pair, the problem of cam design was transferred to that of linkage design. by means of rotary unit vectors, the equations of displacement, velocity and acceleration of the replacement mechanisms were developed. and then, the virtual linkage ' s length and direction were deduced

    論文基於高副低代原理,將平面凸輪機構與再現函數的平面連桿機構統一為同一種方法,運用向量函數建立代換機構的位移、速度、加速度矢量方程式,求取虛擬連桿桿和方向,由此展開凸輪理論廓線、實際廓線、曲率半徑和壓力角的求解,並得出用刀具加工凸輪時刀具中心的軌跡方程。
  7. The conformal microstrip antenna with some unique character has been applied in many fields, especialy on speedy objects. in this paper, an efficient fdtd algorithm is introduced to analyse the microstrip antenna. firstly, the fdtd formula in descartes coordinate system and in cylindrical coordinate system are obtained from the time _ dependent maxwell equations using the yee algorithm in a calculating region where the dielectric parameters are independent of time and space. the choice of the space discretization units and the time discretization interval are discussed which are decided by the accuracy and stability respectively. the shape and setup of the excitation source are discussed too. the excitation source is chosen to be gaussian pulse in shape. secondly, the mur ' s first - order and second - order boundary condition are deduced in cylindrical coordinate system. the methods of transforming radiation fields from near zone to far zone in the frequency domain and in the time domain are presented when fdtd is applied to analyse the characteristics of far zone. finally, three kinds of microstrip antennas are analysed. they are a slot antenna that lies on a plane ground of a microstrip, a slot antenna that lies on a cylindrical ground of a microstrip and a microstrip line _ fed aperture coupled stacked rectangular patch antenna in cylindrical coordinate system

    本文從麥克斯韋旋度方程出發,建立了笛卡兒坐標下無源空間中均勻無耗媒質的fdtd基本方程和柱坐標下無源空間中均勻無耗媒質的fdtd基本方程,詳細討論了fdtd法算中時間步和空間步的選取原則以及激勵源的類型和置;推導了mur一階和二階邊界條件在柱坐標下的差分格式;給出了在用fdtd法算天線的遠場輻射特性時必需採用的頻域和時域近場遠場變換技術;最後用fdtd法算了平面微帶縫隙天線、柱面共微帶縫隙天線和柱面共微帶層疊天線的輸入阻抗和遠區輻射場,並分析了天線的一些參數的變化對天線輸入阻抗的影響,得出了一些有用的結論。
  8. These can make up the shortcoming of slrcp ; 2 3. to study the steel stress development of penstock, ring - form slsfsrcp and horse - shoe slsfsrcp during curing period are monitored. the pre - tension stress due to expansion of self - stressing concrete can be used in design ; 4

    和馬蹄管道進行了28天養護期內力監測,研究了鋼襯鋼筋鋼纖維自應力混凝土壓力管道的自應力成過程,明確了鋼筋的預拉應力數值,為此類改性管道直接提供依據; 4
  9. It has also pounded the keys, devices, disposition of surveyed spots, measure method and procedures, data gathering and process ( relation with construction workmanship ), error analysis and adjustment, control precision and rules, mechanism and method of control, tables of records, results and discussion. after completion, the bridge has good behaviors in dead loads state, cable forces, shape style of main beam, stress and strain of concerned sections, displacements of the tower top, which assure the reasonable state of cables, main girder and towers, and safe under running, demonstrate supervision

    通過課題研究與實橋運用,荊州江公路大橋斜拉橋施工過程各狀態和成橋恆載狀態下,斜拉索索力、主梁線、主梁關鍵截面應變、索塔塔頂水平偏位等關鍵項目的施工控制結果均滿足期望值的要求,滿足橋梁施工范圍的要求,大橋主梁線流暢,斜拉索、主梁和索塔三大體系的受力狀態合理,橋梁結構安全可靠,大橋的監測監控取得了滿成功,並為該橋營運階段的期監測監控奠定了良好的基礎。
  10. With the help of this program, this paper does research on the moved backwards of the slide surface, lengthening the anchor section, the soil nail ' s total force, gets conclusion about relations between the soil nail ' s length and the slope ' s grade, height, soil ' s mechanical parameter ; relations between soil nail ' s total force and coulomb soil pressure. with the help of the large multiuse finite element program ansys, this paper analyzes the soil nailing in one - step ' s slopes, in two - steps " slopes, puts the emphasis on the axis force ' s distributing along the soil nail at each rows, the effect of both the excavating mode and the original slope figure to the axis force of the soil nail, the one another effect between the upper - step slope and the nether - step slope in the soil nail ' s axis force, gets conclusion about the design of soil nail at the first low, different slope body is the same with different excavating mode, the original slope figure has more effect to some than others because of the slope body, the reasonably design of the step width in two - steps slopes, the two - steps excavating and retaining has more virtue than the one - step ' s. through soil pressure analysis this paper does research on the differences and the links between the coulomb soil pressure theory and the rankin ' s, the vertical pressure at the slope surface when the slope surface is inclined and the retaining wall is rough, the soil pressure ' s distributing behind the panel, gets conclusion about the effect of both the slope body inner stability and the slope surface local stability to the soil pressure

    通過分析比較,論證了對數螺旋線型比作為邊坡的假滑裂面具有較多的工程優點,並為此編制了一個採用極限平衡法分析土釘支護的fortran語言程序,以此作工具對滑裂面的后移、土釘錨固段的超、土釘總力的大小等方面作了研究,得出了有關土釘的度與邊坡的坡角、坡高、土體力學參數的關系、土釘總力與庫侖土壓力間的關系等結論;採用大型通用有限元數值分析程序ansys分別對採用土釘支護的一階邊坡、二階邊坡進行分析,重點是研究各排土釘的軸力分佈規律、開挖方式及原始邊坡態對土釘的軸力的影響、上下階邊坡在土釘軸力方面的相互作用,得出了有關第一排土釘的問題、不同類型的土體應適用於特定的開挖方式、原始開挖出的邊坡態對一些類型坡體的邊坡土釘支護有較大的影響而對另外一些影響不大、二階邊坡臺階寬度的合理確定、二階開挖及支護比一階時具有較多的工程優點等結論;通過土壓力分析對朗肯、庫侖兩種經典土壓力理論的區別與聯系、坡面傾斜及墻背有摩擦時的坡面豎向應力分佈、面板背土壓力的分佈態作了研究,得出了邊坡支擋土壓力受坡體內部穩定與坡面局部穩定兩個方面的影響、土釘支護面板背土體中卸荷拱的存在對面板受力有利等結論。
  11. The double circular - arc gears cad systems designed in vb language combines the accuracy and high speed operation abilities of computer, a great deal memory and manage data abilities of computer and abundant chart dispose abilities of computer with creating thinking and colligating analysis ability and logical judge ability of human being. it is a tight cooperate system

    以vb語言的雙弧齒輪cad系統,將算機高速、精確的運算功能、大量存貯和處理數據的能力、豐富而靈活的圖、文字處理功能與者的創造性思維、綜合分析能力、邏輯判斷能力結合起來,構成了一個人與算機各發揮所,又緊密結合的系統。
  12. The chemical composition, micro - structure and optical properties and its application of tio2 thin films deposited on k9 glass by using reactive electron - beam evaporation ( reb ) are studied through sem, tem, xps, xrd, spectroscopic ellipsometry ( se ) and uv - vis spectrophotometer in the dissertation, and the progresses of nucleation and growth of thin film are discussed from the point of view of dynamics and thermodynamics so that a structure model of tio _ ( 2 ) thin film is brought forward

    本文採用sem 、 tem 、 xps 、 xrd 、橢偏振儀( se ) 、 uv - vis分光光度等分析手段系統地研究了電子束反應蒸發方法在k9玻璃上制備tio _ 2薄膜的成分、結構和光學性能以及tio _ 2薄膜在光學多層膜中應用,並開發了膜系軟體。文中還從動力學和熱力學角度分析了tio _ 2超薄膜的核生過程,得出了tio _ 2薄膜的組織結構模型。
  13. Systemic measure scheme is designed on the basis of product line structure and every component of measuring system is specified. secondly, tube product shape imitating, rolling imitating of on - line tube product, measuring the chord length imitating with ccd and dimension measure arithmetic - circle least square estimation are finished. lastly, according to mentioned dimension measuring method, imitating operation and the result of imitating operation are emphatically analyzed

    文章首先介紹了管狀產品的生產線結構,根據生產線結構了系統檢測方案,並詳細說明了檢測系統各部分的組成;其次對管狀產品狀模擬、管狀產品在生產線上滾動模擬、線陣ccd檢測弦模擬、尺寸檢測演算法? ?的最小二乘法進行了研究;最後重點對所提出的尺寸檢測方法進行模擬算並對模擬算結果進行分析。
  14. This paper deals with the design and construction of the key sectional works, the round diaphragm wall and its inner lagging and bottom sealing, of the south anchorage foundation of yangluo changjiang river highway bridge

    摘要介紹陽邏江公路大橋南錨碇基礎關鍵分項工程地下連續墻、內襯支護和封底的施工情況。
  15. At last, a 3d - fem model is used for a soil - nailed supporting system in a classical two - layer distribution. the spatial distribution of horizontal displacement is reached by the analysis. some other analyses are made for the different ratio of length of foundation pit and the effect of the ratio on the largest horizontal displacement of the slope is analyzed

    在邊坡破壞模式研究中利用有限元方法對成都砂卵石地區典型的二元體土層基坑開挖進行了數值模擬,認為其破壞並不取均質土的弧破壞模式,而是一種折線破壞模式,同時建議在噴錨網支護中錨桿度的變化和極限平衡分析中考慮折線滑動面。
分享友人