長方形槽 的英文怎麼說
中文拼音 [zhǎngfāngxíngcáo]
長方形槽
英文
rectangular slot- 長 : 長Ⅰ形容詞1 (年紀較大) older; elder; senior 2 (排行最大) eldest; oldest Ⅱ名詞(領導人) chief;...
- 方 : Ⅰ名詞1 (方形; 方體) square 2 [數學] (乘方) involution; power 3 (方向) direction 4 (方面) ...
- 槽 : 名詞1 (盛牲口飼料或飲料等液體的器具) trough; manger (for water animal feed wine vat) 2 (兩邊...
- 長方形 : oblong; rectangle; oblong shape長方形圖 histogram
- 長方 : rectangular長方鍵 longitudinal key; 長方體 [數學] rectangular parallelepiped
-
The results show that selection of radiation parameterization schemes has distinct impact on the simulated results. the results simulated by the group with detailed long - wave and short - wave radiation parameterization scheme reflect plateau terrain and typhoon, cloud, subtropical high, trough / ridge more particularly and reasonably ; intensity of typhoon rainfall center is improved 1 / 3, there have been some improvements on intensity of the north heavy snow, more approach the observation
通過對2002年第16號臺風個例和2002年12月19 24日降雪個例的模擬,結果表明:選用不同的輻射參數化方案對模擬結果具有明顯的影響,較詳細的長短波輻射參數化方案組合模擬的各種輻射量和雲對地形以及臺風、副高和槽脊等天氣形勢的反映更加細致合理;降水的預報也更加接近實況。In this thesis, first, reasons and factors for the stability of loose rock dams were summarized according to the field surveys and certain expert ' s experiences. then, researches on block stability problems were reviewed, and according to the relationship between grain size and incipient velocity, it is found that the block weight is in direct proportion to 6 - 9 power of incipient velocity, and 50 % increase of the velocity will result in about 40 times change of the block weight. after that, experiments were conducted in a flume, focusing on the relationship between incipient velocity and some main factors including block weight, water depth over the dam, cross - section size, block material and river bed material
本文首先根據散拋石壩損毀情況的現場調查資料,結合有關專家多年的整治經驗,總結出壩體的損毀原因及影響因素;對現有塊體穩定性的研究成果進行回顧和總結,並針對散拋石壩的直接損毀現象,結合山區河流的水流、地形特點,利用塊體粒徑與起動流速的關系,提出塊體穩定重量與起動流速高次方成正比的概念,流速50的增長可能導致塊體穩定重量接近40倍的變化;通過二維變坡水槽試驗,研究了壩體穩定的主要影響因素,包括塊體重量、壩頂水深、斷面尺寸、塊體材料(塊石和卵石兩種) 、護底等,結果表明對于山區河流,試圖僅僅通過增加壩體單個塊體重量或斷面尺寸來提高壩體穩定性效果甚微;最後,根據西部地區的自然、經濟、交通等條件,提出可以採用柔性混凝土鉸鏈體等一類整體性較好的護面層作為散拋石壩的防沖毀措施,以期取得良好的工程效果。Vast stores of carbon in the form of peat underlie much of the tundra in alaska and russia, evidence that for long periods arctic tundra has been a net carbon sink ; about 600 cubic miles of peat are currently in cold storage
碳以泥煤的形式大量儲存在阿拉斯加與俄羅斯大部份的苔原底下,長期以來北極苔原一直都是碳的儲存槽,現在約有2500立方公里的泥煤冷藏於此。Square files are used to enlarge square and rectangular openings, filings, slots, keyways and other similar purposes
主要是為了擴大方形和長方形、銼削、槽孔、鍵槽和其他相似的用途。Abstract : it was deduced that the shapes of magnetic particle indicationsof point - type defects on workpiece surface depended on the resistance of carrier medium, and their dimensions depended on the volume of the defect equivalent cuboid, the magnetising characters of workpieces and magnetic particles, the strength of magnetic field, the lengths and sections of magnetic particles and the resistance character of carrier medium
文摘:推斷出工件表面點狀缺陷磁痕的形狀取決于磁粉載體的介質阻尼力,磁痕大小取決于缺陷等效長方槽的體積、工件和磁粉材料的磁化特性、磁場強度、磁粉長度和橫截面積以及載體介質的阻尼特性等。This thesis researches on the stability of fibre suspensions applying theoretical, numerical and experimental methods. first the linear stability analysis is performed to fibre suspensions utilizing flow stability, slender - body and orientation tensor theories. the governing equations of channel and pipe suspensions of different stability handling modes and tensor closure approximations are derived
首先綜合應用流體動力穩定性理論、細長體理論以及纖維方向張量工具,對纖維懸浮流進行線性穩定性分析,推導槽流和管流的穩定性方程,並對槽流導出在不同的穩定性分析模式以及不同的方向張量封閉格式下的多種形式方程。Welded static non - pressurised thermoplastic tanks - part 3 : design and calculation for single skin rectangular tanks
焊接固定常壓熱塑性槽罐.第3部分:單層壁長方形槽罐的設計和計算Welded static non - pressurized thermoplastic tanks - part 3 : design and calculation for single skin rectangular tanks ; german version en 12573 - 3 : 2000
焊接非承壓熱塑固定槽罐.第3部分:單層壁長方形槽罐的Through the experiment, four engineering questions are answered : 1. whether the notching construction can be done on the wet beach of the downstream of the yellow river with the blasting method ; 2. whether the ditches can be created by the blasting and how long can be maintained ; 3. whether the ditches can be used to divert water and form a new river channel by water flushing ; 4. the impacts on the safety of the existing projects therein from the blasting concerned
通過試驗,回答了在黃河下游濕灘上能否進行爆破開槽施工;爆破能否形成溝槽,形成的溝槽可以保持多長時間;能否作為引槽引水,通過沖刷形成新河槽;爆破開槽對已有工程的安全影響等四方面的問題。Supported by the state natural science foundation project " formation mechanism and evolution processes of flood channels in the changjiang estuary ", this paper study systematically the formation and evolution, erosion and deposition, and features of dynamic sediment of flood channels in the changjiang estuary, and put forward a development model of the different flood channels
本文依託國家自然科學基金課題《長江河口漲潮槽形成的機理與演化過程的定量研究》 ,以長江河口的漲潮槽為研究對象,採用沉積和地貌,定性和定量相結合的方法,運用gis技術對河口漲潮槽的形成機理、演化模式、動力沉積特徵以及沖淤變化等問題進行了系統的研究。分享友人