長焊軌 的英文怎麼說

中文拼音 [zhǎnghànguǐ]
長焊軌 英文
long welded rail
  • : 長Ⅰ形容詞1 (年紀較大) older; elder; senior 2 (排行最大) eldest; oldest Ⅱ名詞(領導人) chief;...
  • : 動詞(用熔化的金屬修補金屬器物或使金屬工件連接起來) weld; solder
  • : Ⅰ名詞1. (路軌;軌道) rail; track 2. (比喻辦法、規矩、秩序等) rut; path; course Ⅱ動詞[書面語] (遵循; 依循) follow
  1. Long rails in jointless track are usually made on welded rail site or in railway welded rail factory

    摘要無縫線路道常由鐵路廠或現場基地接。
  2. The pd3 rails made in china and uic900a rails made in france are welded into 250m long rail by contact weld

    在鋪基地採用接觸將pd3和法國uic900a接成250m
  3. This paper analyzes the cause of small concaves around the welding seam in the long rail of guangzhou metro line 2, and presents preventive measures, such as increasing the under layer of the rail, limiting the weld seam, lowering the welding temperature etc

    摘要結合廣州地鐵2號線接觸的實踐,分析了產生頭表面小凹痕的原因,提出改變墊高鋼的方式、縮小正火范圍、降低正火溫度、限制接頭錯牙量等預防措施。
  4. This paper discusses aluminium heat welding principle, the application of aluminium heat welding technology in welding crane rails and infect of long rail temperature stress on buildings

    摘要介紹了鋁熱原理及其技術在接起重機道中的應用,並對溫度應力對建築物的影響進行了深入分析。
  5. According to the engineering experiences obtained from the laying of a jointless track of high - speed communication line - line 3 in dalian city, this paper introduces in general the laying technology, particularly the long rail welding, the construction site welding, seamless track spreading and trak controller laying, and discusses problems often occuring in long rail wedling and seamless track laying

    摘要根據大連市快速道交通3號線一次性鋪設碎石道床無縫線路的工程實踐,介紹了基地接、單元節的工地接;無縫線路鎖定和鋼伸縮調節器的鋪設等技術,並對接和無縫線路鋪設中應注意的問題進行了探討。
  6. This paper discusses the applicable ranges of current welding long rail techniques under various construction circumstances of urban rail transit project, and holds that the engineering scheme of the welded - rail site, the viaduct welded site and the utilization of mobile touch - weld vehicle shall be adopted

    針對城市道交通工程中不同的施工環境,對比分析了現有的各種接方法和適用范圍,探討了現場基地、高架橋上的基地及利用移動式接無縫線路的施工方案。
  7. At that time, owing to the limited construction funds and a lack of related regulations on environmental noise and vibration, dorts referred to the gc report of environmental assessment and thus adopted two remedial measures. one was to draw up contracts stipulating the specification of the environmental control systems and train types for noise reduction. the other was the utilization of continuous seamless welded rails to attenuate vibration

    由於當時客觀上國內尚未有噪音及振動相關法規,本局又受限於捷運工程經費限制,于參考總顧問報告后,在噪音控制方面:針對環控系統及電聯車訂定相關合約規范;在減少振動方面:道系統採用無縫
  8. The seven items are : ( 1 ) welding in the long - rail foundation

    一次性鋪設跨區間無縫線路的七個主要的作業項目為: ( 1 )基地接。
分享友人