長跨度 的英文怎麼說

中文拼音 [zhǎngkuà]
長跨度 英文
long span
  • : 長Ⅰ形容詞1 (年紀較大) older; elder; senior 2 (排行最大) eldest; oldest Ⅱ名詞(領導人) chief;...
  • : 動詞1 (抬起一隻腳向前或向左右邁) step; stride 2 (兩腿分在物體的兩邊坐著或立著) bestride; stra...
  • : 度動詞[書面語] (推測; 估計) surmise; estimate
  1. The basket symmetrical cantilever construction, which is often used, is one way of large - span bridge construction. with the length of cantilever longer, the risk is increased as well

    掛籃對稱懸臂施工是大橋梁施工中常用的一種方法,隨著懸臂的加,風險也隨之加大。
  2. Usually, due to a long life cycle and container transport, geographic span, the ambient temperature and humidity will be great changes, especially on the sea, the temperature difference between day and night, when the temperature inside the container below the dewpoint, it is easy to create " foggy rain "

    通常,集裝箱運輸由於周期,地域大,環境溫和濕會有很大的變化;特別在海上,晝夜溫差大,當集裝箱內的溫低於露點,很容易形成「霧雨」的現象。
  3. The identification of flutter derivatives for bridge sectional model has long been a key issue in long - span bridge flutter and buffeting analysis

    期以來,橋梁斷面顫振導數的識別都是大橋梁顫抖振響應分析中的重點和難點問題。
  4. The visual obstacle by gap joint of pieces of bent / tempered glass of general specification is removed for bent / tempered glass with extra big width and curve length to realize the ideal design of curved glass with extra big span for sightseeing balcony and elevator

    超寬、超弧彎鋼化玻璃消除了普通規格彎鋼化玻璃拼縫對人的視覺障礙,使觀景陽臺、觀光電梯等圓弧玻璃超大的理想設計成為現實。
  5. Specification for longspan steel joists, lh - series and deep longspan steel joists, dlh - series

    Lh系列長跨度鋼擱柵和dlh系列深長跨度鋼擱柵規范
  6. The newly completed hall of national agricultural exhibition center has a length of 152. 5m, width of 86m, exhibition hall area of 13, 000m2 and highest point of 15. 6m

    剛剛新建的北京全國農業展覽館?新館採用大獨立柱基張弦式管橋架結構,152 . 5米,寬86米,展廳面積13000平方米,最高處達15 . 6米。
  7. The resonance conditions of the train - bridge system are affected by the span, total length, lateral and vertical stiffness of the bridge, the compositions of the train, and the axle arrangements and natural frequencies of the vehicles

    車橋系統的共振條件與橋梁及豎向和橫向剛,列車編組、車輛軸距參數及車輛的自振頻率等因素有關。
  8. Continuous rigid - framed and box - typed bridge of middle span. according to the wording feature of pc. continuous rigid - framed bridge in cantilever casting construction, every kind of temporary measurement has been analyzed

    中等預應力混凝土箱形連續剛構橋橋布置時,為方便施工及減小主橋橋,邊徑在無特別要求的情況下,可考慮選用較小的邊、中比例。
  9. The upper level is for cars and has a width of 22. 5 meters ; the lower level is railroad and has a width of 18 meter. the length of the bridge is 1670 meter ( 1 mile )

    5米;下層為雙線鐵路,寬18米;全1670米,正橋156米,有兩臺8墩9米,每孔128米。
  10. The upper level is for cars and has a width of 22. 5 meters ; the lower level is railroad and has a width of 18 meter. the length of the bridge is 1670 meter 1 mile

    江大橋上層是公路,寬為22 . 5米下層為雙線鐵路,寬18米全1670米,正橋156米,有兩臺8墩9米,每孔128米。
  11. It has a span of 4260 feet. the bridge is so long that the shape of the earth had to be taken into account by its designer.

    橋的有4,260英尺。橋梁很,所以它的設計師不得不考慮地球的形狀。
  12. Considering that the characteristics of our country ' s highway tunnels are always of long spans, tabular and of various geometry, by means of thorough analysis of the different problems existed in the design of support structures of the tunnels at present, this paper pays special attention to the two key problems, optimization method of form selection of structural section of the tunnel as well as the stability and bearing capacity of the support structures, in the design of the long and large tunnel on high - class highway, introduces the simplified complex - form optimum method in the structure optimization theory, discusses the optimum design model of lining section of highway tunnel with satisfying demands in building clearance, ventilation and load conditions, puts forward an optimization method of form selection of three different kinds of lining sectional forms ( i. e. single - center circle, three - center tabular circle and three - center sharp circle ), establishes a complete set of systematic optimum design the ory and method of long and large tunnel on high - class highway, develops the corresponding computer software used on the planned xuefeng mountain highway tunnel on shaoyang to huaihua expressway in hunan province for optimization of form selections of the structural sections, and obtains a series of relatively reasonable structural design parameters

    本文針對我國公路隧道多為大、扁平、幾何形狀呈多樣化的特點,通過深入分析目前隧道支護結構設計中存在的各種問題,抓住高等級公路大隧道設計中隧道結構斷面的優化選型及隧道支護結構的穩定性與承載能力兩個核心問題,引入結構優化理論中的簡易復合形優化方法,深入探討了滿足建築限界、通風條件、受力狀態約束等條件下公路隧道襯砌斷面優化設計模型,提出了三種襯砌斷面形狀(單心圓、坦三心圓和尖三心圓)的優化選型方法,建立起一套完善的高等級公路大隧道的系統優化設計理論與方法,並開發出相應的計算機程序,用於擬建的上海至瑞麗國道主幹線湖南省邵陽至懷化高速公路雪峰山大高速公路隧道的結構斷面優化選型,得出了一系列較為合理的支護結構設計參數。
  13. In fictions, tune scale, an important factor in time ' s artistic construction, refers to the time span of the stories

    摘要時作為小說時間藝術構建的重要一元,指的是小說故事的時間
  14. The lantau link comprises the cable - stayed kap shui mun bridge and, of course, the spectacular tsing ma bridge, the span of which measures 1, 377 m, that making it one of the longest suspension bridge in the world carrying both road and rail traffic

    青嶼干線由斜拉索結構的汲水門橋及宏偉壯觀凈為1 , 377米的青馬大橋組成。青馬大橋更是世界上最的道路鐵路兩用吊橋之一。
  15. Seismic response analysis of a long - span cable - stayed bridge under random seismic excitations with spatial variations, including travelling effect, incoherence effect and local site effect, was made with stochastic method

    摘要以南京第二江大橋南漢橋為例,採用隨機振動分析方法研究了地震動的空間變化特性,包括行波效應、部分相干效應以及局部場地效應對大斜拉橋地震響應的影響。
  16. Regarding the rc beams subjected to concentrated load or even load and braced by bonding steel, an analysis is made on the relevant factors influencing maximum anchorage shear stress of steel sheet. the analysis is based on elastic theory and makes use of the formula for calculating anchorage shear stress of steel sheet. as indicated by the results, the maximum anchorage shear stress not only realtes to such parameters as height of cross section of rc beam and span but also relates to the thickness of adhesive layer, elastic modulus, thickness of steel sheet, and length of steel sheet. the present method will check maximum an chorage shear stress on the end of shear sheet so as to prevent rc beam from local damage. the present results will offer important reference for our country to further perfect bracing design by bonding steel method

    在彈性理論的基礎上,利用鋼板錨固剪應力計算公式,對在集中荷載或均布荷載作用下採用粘鋼加固的混凝土梁,分析鋼板錨固最大剪應力的有關影響因數.結果表明,最大錨固剪應力不但和混凝土梁的截面高等參數有關,還和粘膠層厚、彈性模量、鋼板厚及鋼板有關.採用文中方法可以對鋼板端部最大錨固剪應力進行驗算,防止混凝土梁出現局部受拉破壞.研究結果為進一步完善我國粘鋼法加固設計提供重要的參考資料
  17. With the great development of brides with large - scale span in china, the application of superlong and superhigh bridge pile in construction is increasingly popular, so that the bridge - pile buckling analysis ( hereafter abbreviated as bpb analysis ) gradually receives its due importance

    隨著我國大橋梁的高速發展,超、超高的橋梁基樁在工程建設中應用日益廣泛,因此橋梁基樁的屈曲分析也日益受到應有的重視。
  18. The main structure of caiyuanba yangtze bridge in chongqing, up to date the largest - span tie bar arch bridge, is formed by two side tie bars and one middle tie bar which unite the y - shape rigid framework and arch rid. therefore, tie bars are one of the key components

    重慶菜園壩江大橋是迄今為止世界上的系桿拱橋,該橋的兩根邊系桿和一根中系桿將南北兩岸的y型剛構和中間的拱肋連成一個受力整體,構成該橋的主結構,因此系桿是該橋關鍵受力部位構件之一。
  19. Making reference to the anqing changjiang river highway bridge construction and the construction control, firstly, this paper studies the philosophy of the cable - stayed bridge construction control simulation analysis systematically, and pays much attention to the theory of simulating the construction process : backward analysis and forward analysis. then on the basis of introducing the construction process of the anqing changjiang river highway bridge, analysis the construction course fully, and analysis comparatively the result of each girder segment construction simulation, and study the variation philosophy of the line style of large cable - stayed bridge during construction

    本文緊密結合安慶江公路大橋的主梁施工及施工控制實踐,首先系統地分析了斜拉橋施工控制模擬計算的整體思路,並重點分析探討了斜拉橋施工過程計算的理論:理想倒退分析和實時前進分析,然後在介紹安慶江公路大橋主橋施工過程的基礎上,全面地計算分析了全橋的施工過程,並且應用施工過程計算結果,對每一個梁段的施工模擬工況進行對比分析,研究了大鋼斜拉橋在施工過程中的線形變化規律。
  20. The main contents about calculation of cable curve for suspension bridges are as follows : firstly, parabola theory, a traditional calculation theory of linetype for suspension bridge, is introduced. according to behavior of suspension bridge, segmental catenary theory which is an exact calculation theory of cable curve for suspension bridges is then built. after that, the errors and adaptable range of segmental parabola theory, segmental straight - line theory and traditional parabola theory are compared one another

    懸索橋線形計算部分的主要內容如下:首先,介紹了懸索橋的傳統線形計算理論? ?拋物線理論;根據懸索橋的特徵,建立了懸索橋主纜線形計算的精確理論? ?分段懸鏈線理論;並由此比較了分段拋物線法、分段直線法及傳統拋物線理論的誤差和適用范圍;分析了索變化、變化及主纜變形引起的恆載重分佈對主纜線形的影響。
分享友人