閘墻 的英文怎麼說

中文拼音 [zhá]
閘墻 英文
lock wall
  • : anchor gate
  • : 名詞(磚、石等築成的屏障或外圍) wall
  1. The stress status of concrete at face of sluice pier in the case of cold wave, pipe cooling and cast - in - place partial sluice pier and so on

    研究了寒潮、水管冷卻、整澆部分體等情況下墩表面混凝土應力分佈狀況。
  2. Construction of cutoff wall in colluvium of lock head lengzhuguan

    冷竹關首工程崩積堆層中防滲的施工
  3. By hydraulic modeling, this paper describes studies on the stability of a floating bulkhead operating in standing water and flowing water, and it ' s hydrodynamic stability characteristics that distinguish in standing water from in flowing water ; and direct measurements of the forces acting on the model floating body during floating and sinking is taken. as a result, the rotation stress curves are produced and analyzed ; to provide data for optimum operation schedule analyses of the sluice, the relationship of the impact forces acting on the side wall of the gate and the running speed is studied ; the reasons of unstably uplifting of the bulkhead are discussed and the method to solve the problem is also given in this paper

    本文結合常州新防洪控制工程水工模型試驗,系統分析了浮箱門在靜水和動水中的穩定性及其影響因素,指出靜水穩性和動水穩性的不同特點;試驗測定了浮箱門動水運行時的受力情況,給出並分析了定位過程轉動力的變化過程曲線;根據浮箱門啟閉速度與門體和岸之間撞擊力大小的關系,選擇合理的動力設備,為設計和工程實踐提供可靠依據;分析浮箱門難以穩定上浮的原因,並給出解決方案。
  4. In fact my major in college was ancient civilization, which incorporated a lot of archeology. one of the things i discovered is that the eye of a needle is not the needle of a sewing needle as we know sewing needles today. if you go to an ancient city, it will always be surrounded by a huge wall

    而我在其中發現所謂針的眼不是指我們今天認識的縫針若說當時沒有縫針,我不會驚訝,我不知道有沒有,我倒知道針的眼是指什麼針若你去古城游覽,古城總有大圍陣,這些大城保護城市免受入侵這些古城也有大,那些通常也是關閉的,情況特殊才會開放,這些里有個門口開放,讓一般路人進出,就是一個小門口。
  5. The crackings occurred on the retaining wall and side piers of a flood gate during construction and the causations are investigated, inspected and analyzed, and then the relevant control measures are put forward based on the endangering degree from the cracks on the structure ; by which the normal operation function of the gate is guaranteed

    摘要針對某水工程在施工過程中擋及邊墩產生的裂縫,進行了裂縫特徵的調查、檢測和引發裂縫原因的分析,並根據裂縫對建築物的危害程度,提出了相應的控制措施,較好地保證水正常運行的功能。
  6. The phenomenon of crack that appears in the hydraulic culvert and sluice is explained separately. the rule is concluded. the mechanism that forms the crack is studied

    對水工涵工程墩和底板混凝土的裂縫現象分別進行了闡述,總結其規律,分析其成因,並研究其開裂機理,為採取相應的工程防裂措施提供理論依據。
  7. Check the gear wheel drive in the groove of the wall, select four gear wheel ( red pinion is not used ) of different size for use, load heavy gear wheel, times of heavy gear wheel, times of light gear wheel, minimum gear wheel most onto separately from left to right, make gear wheel hand in, form each other, leave behind, operate a switch, drive, finish

    檢查壁凹槽中的齒輪驅動裝置,選用大小不同的四個齒輪(紅色的小齒輪不用) ,從左到右分別裝上最大的齒輪、次大的齒輪、次小的齒輪、最小的齒輪,並使齒輪間相互交結,拉下拉,驅動完成。
  8. He steered toward it, thinking, i must remember to put the brake on before i hit the wall.

    他照直開去,心想:可別忘了拉,以免撞
  9. Through improvement of construction technology of chamfer of zaohe river third - line lock ' s chamber wall, the inclined surface concrete quality has been well controlled

    通過對皂河三線船倒角施工工藝的改進,斜面砼表面質量得到了較好的控制。
  10. Introduced by prestressed pier in the gate of spillway in xiao xia hydroelectric power station, the text reasonably established 3 - d finite elements mechanic model by the advanced finite elements popular in the world which can expediently impose tension of anchor funicular at its place. it also considered possible diversified combination of loading, and indicated that the effect of its prestressed action is fruitful compared with its conventional counterpart by study of mechanic calculation in comparison. as a result, it vastly improved burdening state of pier. by analysis of 3 - d finite element method, it also gained the stress result indifferent boundary conditions such as breast wall joint support and fixed support, and the displacement result in diversified loading combination. those results gained the instructive and reference value in design of prestressed pier

    本文結合黃河小峽水電站泄洪預應力墩這一工程實踐,採用國際上已成熟的有限元方法,合理地建立了預應力墩的三維有限元模型,該模型可方便地按預應力錨索的點位施加錨索預張拉力,考慮了可能發生的多種荷載工況組合,並與無預應力墩結構進行了對比分析研究,指出其預應力效果是明顯的,可以大大改善墩結構的受力狀態,通過三維有限元分析,還得到了胸簡支、固端不同情況下的應力成果和各荷載下的位移成果,這些成果的取得對預應力墩的設計具有一定的指導和參考價值。
  11. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌的結構與支護研究;特大型水輪發電機組的科學研究。
  12. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌的結構與支護研究;特大型水輪發電機組的科學研究。
  13. On the process of simulation the deformation after excavation at the middle frusta and the vertical slope at three gorges permanent shiplock, program the fortran procedure to perfect model creation and the capability of the pre - procedure and post - procedure in flac - 3d

    在模擬三峽永久船中隔墩和直立邊開挖卸荷變形過程中,編制fortran程序,完善flac - 3d建模功能和增強其前後處理能力。
  14. After excavation, there are concentration phenomenon of stress at the corner or the shiplock room, and the tension zone lies in half of the middle part as well as the part of the two slopes to the lower part of the upright wall. finally the analysis results are compared with site monitoring data in period of construction as well as the feedback reports, the result of all comes to meet with each other very well

    開挖完成後,在室拐角處存在不同程度的應力集中現象,中隔墩上部1 2的巖體及南北邊坡至直立頂部平臺以下的部分巖體為拉應力區。在兩側邊坡及邊的塑性區出現在損傷區和部分卸荷影響區內,中隔墩大部分區域的巖體都進入了塑性狀態,室底板處的塑性區基本上與損傷區一致。
  15. And the conclusion can be obtained thatrafter excavation, the horizontal deformation increased continuedly with the depth of excavation. while the whole deformation takes on a tendency of nearly horizon and slightly downward. the middle part of the shiplocks maintains the state of unloading feedback during the excavation, when the excavation is finished, it expands toward two sides

    本文研究發現開挖完成後室直立和南北邊坡的巖體水平方向變形隨著開挖深度的下降而不斷增大,開挖完成後的總體變形表現為近水平略向下。中隔墩在開挖過程中,始終處于卸荷回彈,開挖完成後,中隔墩向兩側張開。
  16. The surrounding rock mass of the tgp shiplocks is jointed rock mass cut by well - developed discontinuous joints. the middle frusta and vertical border wall are the important components of the lock room construction. its deformability and stability will directly affect the construction function and using security

    永久船區巖體屬於一種斷續節理切割的裂隙巖體,中隔墩和直立邊室結構的重要組成部分,其變形大小和穩定程度將直接影響三峽航道的結構功能和運行安全。
  17. Shankou spillway project has many specific characteristics, for example, the gate frusta and weir body have equivalent thickness, the weir body is low and have corridor, the foundation of the weir body is " high - low foot " " and the side frusta is also used as retain wall. in view of the characteristics, to better analyze the stress distribution on weir body, gate frusta, the joints between gate chamber and weir body, under the condition that the gate chamber is applied with asymmetrical loads and complicated constraints, three dimensional finite element method is applied in this paper

    本文針對山口溢洪道墩與堰體底板厚度相當,堰體為低堰且設有廊道、堰體建基面「高低腳」及邊墩兼作擋土等具體特點,在室設計中采山口水利樞紐工程溢洪道室三維有限元整體應力計算分析用三維有限元整體應力計算方法分析室的受力狀態,分析室在荷載不對稱。
  18. Design and construction of the underground water - gate wall at qixi coalmine in zaozhuang

    棗莊市齊西煤礦水閘墻設計與施工
  19. Finite element analysis on application of sap5 program in wall structure of guigang shiplock

    5程序用於貴港船閘墻結構有限元分析
  20. The constraction practice of water brake wall in remining coal flow roadway in quot; bayi quot; coal mine

    八一煤礦復采溜煤巷水閘墻施工實踐
分享友人