閘板行程 的英文怎麼說
中文拼音 [zhábǎnhángchéng]
閘板行程
英文
gate travel- 閘 : anchor gate
- 板 : Ⅰ名詞1 (片狀硬物體) board; plank; plate 2 (專指店鋪的門板) shutter 3 [音樂] (打拍子的樂器) ...
- 行 : 行Ⅰ名詞1 (行列) line; row 2 (排行) seniority among brothers and sisters:你行幾? 我行三。where...
- 程 : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
- 行程 : 1 (路程) route or distance of travel; distance of run; length of travel; distance travelled; jo...
-
The main contents in the paper are as follows : ( 1 ) the operational principle of the hydraulic automatic tilting gates with connecting lever and rolling wheel were analyzed. using block diagram, the author elaborated on the running course and steady factors of the tilting gate. then the instantaneous running center in the running course of the tilting gate was brought forward, and the trochoid of the center was described
本文研究的主要內容如下: ( 1 )分析闡述了水力自動翻板閘門的工作原理和運轉機理,結合框圖詳細分析說明了翻板閘門的運轉過程及其穩定條件,給出了閘門在運行過程中的瞬心軌跡線,分析研究了閘門運動過程中的基本平衡方程。The phenomenon of crack that appears in the hydraulic culvert and sluice is explained separately. the rule is concluded. the mechanism that forms the crack is studied
對水工涵閘工程墩墻和底板混凝土的裂縫現象分別進行了闡述,總結其規律,分析其成因,並研究其開裂機理,為採取相應的工程防裂措施提供理論依據。The aim of this thesis studies frozen - heave forces on culvert brake slab - foundation. first, it introduces the reasons and types of frozen damage of the slab - foundation in seasonal frozen soil conditions. secondly, the experimental studies of frozen soil mechanics were decided in order to revolve frozen - heave forces on the slab - foundation
本論文以涵閘平板式基礎作為研究對象,首先探討了平板基礎凍脹破壞的原因及破壞類型,並圍繞涵閘工程平板基礎的凍脹力進行了工程凍土力學方面的試驗研究。Underground headstock gear and later construction of preset double joint were implemented, which achieved satisfactory results, and thus may serve as a reference for lock design under similar conditions
該船閘閘首採用地下式啟閉機房和底板預留寬縫後期施工,且在施工過程進行了計算機模擬模擬研究,所有這些方面均取得了較好的效果,可供具有類似條件的船閘設計時參考。( 3 ) the vibration types and physical course of the tilting gate were elaborated, the causes of all kinds of the vibration were analyzed, and then the corresponding shock absorption measures were put forward
( 2 )分析闡述了翻板閘門振動類型及其物理過程研究,對各種振動的原因進行了分析,同時也提出了相應的減振措施。According to the analysis of the gate, the author put forward a mathematical model of the optimization design of the hydraulic automatic tilting gate, and then worked out the structural stability optimization design program of the hydraulic automatic tilting gate. then by the calculation of the program, a better design for a certain project was gained
根據對翻板閘門的運行分析,提出了翻板閘門優化設計數學模型的一般表達式,並據此編制出水力自動翻板閘門的結構穩定性優化設計程序,對某一工程實例,通過程序的計算,得到了較理想的設計成果。The stability analysis and structural optimization design of the hydraulic automatic tilting gates with connecting lever and rolling wheel were carried out in the paper to make them not only be better applied in all kinds of water conservancy but also be wildly applied in ship project, city environmental protection, and other correlative project, further to better the social and living condition
本文對連桿滾輪式水力自動翻板閘門進行穩定性分析和結構優化設計,使得它們不僅能更好地應用於各類水利水電工程中,而且能廣泛應用於航運工程、城市環境保護和其他相關工程中,將會對社會的發展和生活環境的改善有著重要的意義。At last the corresponding formulae was yielded. 4. the design scheme of jiangtang lake flood - intake sluice was systematically researched, including selecting the sluice location, calculating the height of the sluice soleplate, selecting of the sluice structure and bank wall, and then the reliable proof for determining rational structure scheme was provided
4從閘址選擇、閘底板高程確定、閘室結構和岸墻等方面,對姜唐湖進洪閘工程的設計方案進行了系統的研究,為最終確定較為合理的結構方案提供了可靠依據。分享友人