閘線 的英文怎麼說

中文拼音 [zháxiàn]
閘線 英文
brake cable
  • : anchor gate
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  1. The study on single - pole adaptive reclosure of ehv transmission lines with the shunt reactor

    帶並聯電抗器的超高壓輸電單相自適應重合的研究
  2. At locks, isolated farmhouses and riverside pubs he would talk to people, hoping for hints of a military presence.

    在水、孤零零的農舍和河邊客棧,他同人聊天,希望能探聽到一些有關軍事駐地的索。
  3. After analyzing several kinds of protection for feeder line in subway dc traction power supply system, it is pointed out in the paper that the phenomena of refusing action and error action can not be avoided with existing protection which can not protect the whole feeder line

    摘要分析了地鐵直流牽引供電系統中幾種常用的饋保護類型,發現現有的保護方法很難避免跳保護拒動或誤動現象的發生,並且不能保護饋的全長。
  4. By hydraulic modeling, this paper describes studies on the stability of a floating bulkhead operating in standing water and flowing water, and it ' s hydrodynamic stability characteristics that distinguish in standing water from in flowing water ; and direct measurements of the forces acting on the model floating body during floating and sinking is taken. as a result, the rotation stress curves are produced and analyzed ; to provide data for optimum operation schedule analyses of the sluice, the relationship of the impact forces acting on the side wall of the gate and the running speed is studied ; the reasons of unstably uplifting of the bulkhead are discussed and the method to solve the problem is also given in this paper

    本文結合常州新防洪控制工程水工模型試驗,系統分析了浮箱門在靜水和動水中的穩定性及其影響因素,指出靜水穩性和動水穩性的不同特點;試驗測定了浮箱門動水運行時的受力情況,給出並分析了定位過程轉動力的變化過程曲;根據浮箱門啟閉速度與門體和岸墻之間撞擊力大小的關系,選擇合理的動力設備,為設計和工程實踐提供可靠依據;分析浮箱門難以穩定上浮的原因,並給出解決方案。
  5. The bank of shanghai of university of shanghai, the park of zhabei of construction bank railway hospital, the green sea new station on the ground of daning, the subway extends line ( in building ), inner loop, zhonghuan ( while planning ), overhead on the 1st, form the three - dimensional network of communication lines

    上海大學上海銀行,建行鐵道醫院北公園,大寧綠地上海新客站,地鐵1號延伸(在建中) 、內環、中環(規劃中) 、高架,形成立體交通網。
  6. The main contents are as follows : 1. analyze and calculate the influence on network frequency and power flows on tie line when 660mw generator unit trips out from hbpn

    主要工作如下: ( 1 )分析並計算河北南網在發生660mw機組掉時,對電網頻率和聯絡潮流等方面造成的影響。
  7. The main contents in the paper are as follows : ( 1 ) the operational principle of the hydraulic automatic tilting gates with connecting lever and rolling wheel were analyzed. using block diagram, the author elaborated on the running course and steady factors of the tilting gate. then the instantaneous running center in the running course of the tilting gate was brought forward, and the trochoid of the center was described

    本文研究的主要內容如下: ( 1 )分析闡述了水力自動翻板門的工作原理和運轉機理,結合框圖詳細分析說明了翻板門的運轉過程及其穩定條件,給出了門在運行過程中的瞬心軌跡,分析研究了門運動過程中的基本平衡方程。
  8. Examples of " external works " include external carparks, paved areas, deep bored wells, cable ducts, draw in pits, fencing, and steel gates as mentioned in the above general specification

    外部工程的例子,在上述一般規格已有提到,包括戶外停車場、已鋪面地方、深鉆井、電纜槽、進坑、圍欄和鋼
  9. At eastbound and westbound causeway road opposite gate 1 of victoria park

    維多利亞公園一號對出的維園道東西行
  10. So according to the technology regulation of reclamation engineering, hydraulic calculation must be carried out in the design of final closure. this paper firstly introduces the progression and present situation of reclamation engineering, emphasizing on the features of present reclamation and on the experiences and theories of home and abroad ; using fortran perfects the hydraulic calculation program of the closure and makes the program to meet different conditions ( such as considering flood, the variation of time interval, multi - entrance, multi - reservoir capacity ), and after comparing and analyzing a great deal of schemes, the reasonable computation scheme was brought up ; the interface of the program was carried out by the programming language vb to make the process of calculation become easier and more distinct, so the result can be analyzed and handled more directly ; vb is used in the later management of the result to plot the graphic chart of the isoline of the maximum of hydraulic element ( the velocity of flow, the drop height and the rate of flow ) automatically ; finally it was applied in the reclamation project of dongbidao of fuqing

    本文首先介紹圍海工程的發展進程與國內外圍海的開發現狀,重點介紹了我國目前圍海工程的特點及在圍海工程實踐中積累的經驗和理論;利用fortran語言完善堵口工程龍口水力計算程序,使程序可以滿足圍海工程復雜工況下(如考慮內港洪水、計算時段的變化、多口門、多庫容、多水)的龍口水力計算,並進行大量方案的比較和分析,提出合理計算方案;利用面向對象的可視化編程語言vb進行界面開發,使計算過程有良好的人機界面,更直觀地對計算結果進行分析和處理;計算結果的后處理採用vb編程實現龍口水力要素最大值等值圖的繪制;並運用所編軟體對福建省福清市東壁島圍墾工程進行龍口水力計算,為堵口合龍提供科學依據。
  11. According to eigenvalue equation ( general formula ) of the energy method of the plane steel frame structure stability, and considering the restriction of the end of the column of the main steel frame and function of deflection curve gained from the differential balance equation general resolution, we get the equation for calculating the length coefficient of the main frame structure stability of the steel arch gate and the resolutions are also given

    根據平面剛架穩定性能量法特徵值方程(通式) ,考慮弧形鋼門主框架柱的柱端約束的特殊情況,求出撓曲函數(試解函數)通解,得到弧形鋼門主框架柱穩定性計算長度系數方程。其中弧門主框架主橫梁式形框架的臨界荷載比較現行規范推薦的有限元法簡單方便、結果精確及物理概念明確等優點。
  12. Delay trip multiple curves can choose the " inertia delay ", or to prevent electrical transformer loading terminal unnecessary trip

    多種延時跳可選購的"慣性延時" ,可防止電動機或變壓器負載端出現不必要的跳
  13. The check components and circuitry of forced main fuel trip should be separated from other control and monitoring system

    強制性主燃料跳的檢測元件和路,應與其他控制監視系統分開。
  14. According to the actuality of the studied water power station, the thesis combine the advanced fieldbus technique, ethernet and the traditional hydraulic technique together, and use them to design the supervise controlling system of the water power station. base on the gate - controlling request of the water power station, designed the gate ' s hydraulic hoist system

    文章從結合所研究的水電站的實際需要出發,將先進的現場總技術、以太網技術與傳統的液壓技術相結合,並應用到水電站門監控系統的實際設計過程中。論文根據所研究水電站門控制的具體技術要求,設計了適合該水電站的液壓啟閉機系統。
  15. Based on the research of several shiplocks, the temperature and stress field of the lock floor is simulated under temperature and gravity loads, where the shiplock floor is built on different foundations, the effect of setting up wide construction joints is analyzed by the nonlinear finite element method

    作者通過對多個船工程的研究,結合非性有限元模擬分析方法,考慮重力、溫度等荷載,計算分析土基和巖基上船結構底板預留寬縫施工方法的效果。
  16. Various factors that influence lightning strike switching rate are also analyzed. it has been showed that for some given configuration, all lightning over - voltages on substation equipments do not exceed the 1ightning strike insulation level in the case of invading waves out of lightning strike aerial input protection line

    同時利用規程法、行波法、擊距法對輸電路中不同桿塔型號的耐雷性能分別進行了研究和比較,對影響輸電路雷擊跳率的各種因素進行了分析。
  17. The coordination of mineral jy82 - type leak relay line with dkzb - 400 1140 mineral vacuum feed switch

    滅磁開關合閘線圈燒毀的事故分析及改進
  18. On - line monitoring of hvcb is the precondition of predicting maintenance, is the key element of reliable run, and is the important supplement to the traditional off - line preventive maintenance in fact, the faults are made by hvcb, no matter in number or in times, is over 60 % of total faults so it has determinative importance for improving the reliability of power supply and this can greatly decrease the capital waste used by - dating overhaul in this paper, the inspecting way of hvcb mechanism characteristic is discussed the concept of sub - circuit protector is presented, the scheme that we offered has been combined with sub - circuit integrality monitoring theory, to ensure that it has the two functions as a whole according the shut - off times at rated short circuit given by hvcb manufacturer, the electricity longevity loss can be calculated in each operation, and the remained longevity can be forecast too an indirect way for calculating main touch ' s temperature by using breaker shell temperature, air circumference temperature and breaker ' s heat resistance is improved in this paper, and main touch resistance can be calculated if providing the load current msp430, a new single chip microcomputer made by ti company, is engaged to develop the hardware system of the on - line monitoring device, and special problem brought by the lower supply voltage range of this chip is considered fully

    高壓斷路器所造成的事故無論是在次數,還是在事故所造成的停電時間上都占據總量60以上。因此,及時了解斷路器的工作狀態對提高供電可靠性有決定性意義;並可以大大減少盲目定期檢修帶來的資金浪費。本文論述了斷路器機械特性參數監測方法;提出了二次迴路保護器的概念,並將跳、合閘線圈完整性監視和二次迴路保護結合起來,給出具有完整性監視功能的二次迴路保護器實現方案;根據斷路器生產廠家提供的斷路器額定短路電流分斷次數,計算每次分對應的觸頭電壽命損耗,預測觸頭電壽命;提出根據斷路器殼體溫度和斷路器周圍空氣溫度結合斷路器熱阻來計算斷路器主觸頭穩態溫升的方法,並根據此時的負荷電流間接計算主觸頭迴路的電阻;在硬體電路設計上,採用美國ti公司最新推出的一種功能強大的單片機msp430 ,並充分考慮該晶元的適用電壓范圍給設計帶來的特殊問題;在通信模塊的設計中,解決了不同工作電壓晶元之間的介面問題,並給出了直接聯接的接方案。
  19. Function improvement of type jy82a leakage - detecting relay in combination with the tripping coils of the feed switch

    型檢漏繼電器與配合使用的饋電開關跳閘線圈的改進
  20. Choice and comparison of structure are done and the choosing spring, fatigue intension, opening coil and so on are studied in design

    在設計中分別對結構進行了選擇和比較並確定了設計方案,並對彈簧的選擇、疲勞強度、分閘線圈等進行了研究。
分享友人