防彈墻 的英文怎麼說

中文拼音 [fángdàn]
防彈墻 英文
buster slab
  • : Ⅰ動詞(防鷥) provide against; defend against; guard against Ⅱ名詞1 (防守; 防禦) defence 2 (堤...
  • : 彈名詞1. (彈子; 小球形的東西) ball; pellet 2. (內裝爆炸物, 具有破壞和殺傷能力的東西) bullet; bomb
  • : 名詞(磚、石等築成的屏障或外圍) wall
  • 防彈 : bulletproof; shellproof防彈板 [軍事] armour; 防彈背心 bulletproof vest; 防彈玻璃 bulletproof glas...
  1. In this paper, the author combines the theory analysis with the experiment research method, and discusses the seismic behaviours, 3d elaborate finite element analysis and simplified model analysis of a kind of multi - function tall building - " sub - shearwall supported by frame ", which is applied widely today. the main contents are as follows : in order to observe the failure process and the earthquake response of the complex structure, and to analysis the seismic behaviour of the structural system and structural members, a 1 / 20 cement mortor model of a complex tall - building which is about to be built was producted and the shaking table test of this model under 26 sorts of earthquake loads was made. using sap2000 finite element analysis program, a 3d analysis model was built in computer, and the elastic time - history analysis of the model was done

    本文採用理論分析和試驗研究相結合的方法,研究了目前應用較多的綜合性大廈? ?框支分區剪力高層商住樓的抗震性能及空間精細分析和簡化分析方法,主要內容為以下幾方面:對一擬建的復雜高層建築結構,採用1 20比例的空間整體模型,進行了26種工況下的模擬地震振動臺試驗,觀察了結構的破壞過程和地震反應,分析了結構及構件的抗震性能;建立了結構的精細空間模型,利用sap2000n大型有限元分析程序對結構進行了性時程分析;通過有限元分析與試驗結果的對比,對結構的抗震性能和抗震能力做出綜合評價,認為該結構由於轉換層上部去掉部分樓板,既可滿足建築設計的通風、採光等要求,又可達到協調結構轉換層上、下樓層抗側剛度的效果,是一種較理想的有多道抗震線的結構型式。
  2. Elastic mid - strength rock wool board : used for heat preservation, fireproofing and sound absorption for the building wall / roof, such as curtain wall, inner wall partition and elevator hoistway, etc

    性,中等強度巖棉板:適用於建築體/屋頂保溫、火、吸音,如幕、內隔斷、電梯井等。
  3. Technological innovation is the development of enterprises in the last word, i have always maintained the secretary rise in special wallssevered the forefront of the core system, in 2000, the high - intensity of my invention cesium potassium glass chip. test success has been on the market seven years, 2007 to special ( fire ) glass wallsindoor fire glass partition, fire glass window design, construction and 10 years of deep - processing glass curtain wall designconstruction and constantly sum up experience and experiment, glass walls severed system to fire. high temperature must be within the framework of anti - bomb material support fixed glass in the event of fire. at the time of the explosion have enough time to ensure the integrity of the entire system. bullet - proof glass or glass does not fire in a short period of time due to damage fixed framework, a glass panel fell off, lost the fire or bomb - functional

    企業不斷的技術創新是我們發展的硬道理,也是我司一直保持林立於特種幕、隔斷系統前沿的核心, 2000年,我司發明的高強度單片銫鉀火玻璃,經試驗檢測成功推向市場以來已有7個年頭,七年來特種(火)玻璃幕、室內火玻璃隔斷、火玻璃門窗的設計、施工及十多年來的玻璃深加工,幕設計、施工及不斷的經驗總結和試驗,玻璃幕、隔斷系統要火、沖擊波必須要有耐高溫高強度的框架材料固定支撐玻璃,在一旦發生火災、爆炸的時候要有足夠的時間保證整個系統的完整性,不至於火玻璃或玻璃在短時間內由於固定框架破壞,而玻璃脫落,失去了火或的功能。
  4. According to the documentation collected from domestic and abroad wang wei dong who works in huadong architect and structure institute utilizes the similar work property between the underground continuous wall and pile subjected the vertical loads, and introduces poulos method of elasticity and plastic which applies to pile foundation into the calculation for subsidence of underground continuous wall. pujialiu and yu yuzhou from water and electronic engineering of qinghua university, according to the result of three axes, define the concrete parameter utilize the model of non - linear e - b combined with the design cross section of dam in xiaolangdi, yellow river accept the total stress programme of thepd dam, and we analyze the stress and displacement of plastic concrete diaphragm wall by finite element method in comparison with the result of common concrete one. at same time, we consider the effect of the character of plastic concrete diaphragm wall which is composed of different gradients and adopting the level of stress and pulling stress infers whether the plastic concrete diaphragm wall is safe or not

    地下連續是一種歷史較短的施工方法,目前,砼的設計還是以傳統的設計方法為主,根據查找國內外文獻資料,華東建築設計院王衛東利用地下連續與樁在豎向荷載作用下的工作性能有相似性,將適用於樁基的poulos性理論引入對地下連續的沉降計算中;清華大學水利水電工程系濮家騮、于玉貞根據三軸試驗結果確定混凝土的參數,利用非線性e - b模型,結合黃河小浪底土石壩設計剖面,採用thepd土石壩總應力程序,對深覆蓋層塑性混凝土的應力、位移進行有限元分析,並與普通混凝土計算結果加以對比,同時分析了不同配比塑性混凝土特性的影響,並採用應力水平和拉應力數值來判斷塑性混凝土的安全程度。
  5. A design example is introduced in this paper where the concrete watertight wall with low elasticity module is used to strengthen the earth - rock dam of qing shan reservoir, and it is a new type of concrete watertight walls whose elasticity module and crush strength of its wall material lie between normal and plastic concrete

    本文是關于用低模砼加固青山水庫土石壩的設計實例,其體材料的性模量和抗壓強度界于普通和塑性混凝土之間,是一種新型的混凝土
  6. In this paper, the stresses of concrete watertight walls with different elasticity modules are calculated, according to deformation compatibility and boundary conditions of watertight walls and soil layers around, and some factors such as durability of walls are considered, the optimal wall intensity and the corresponding elasticity module are determined, thereby the mixing ratio of wall material can be ascertained by test

    文章通過對不同模的砼的應力計算,按照與周圍土層的變形協調性能和邊界條件,並考慮體的耐久性等因素,確定最優的體強度及相對應的性模量,進而通過試驗確定體材料的配合比。
  7. During the course of stress calculation, the concrete watertight wall and the soil around are supposed to be linear elastic material, the onsolidation of dam is supposed to be completed before the watertight wall is constructed, the contact element is adopted to simulate the interface between the dam and watertight wall, and the completed before the watertight wall is constructed, the contact element is adopted to simulate the interface between the dam and watertight wall, and the influence towards the stress of watertight wall when water elevation changes is calculated by fem

    應力計算時將砼及周圍土體假設成線性材料,假設在施工時壩體固結已經完成,用接觸單元模擬壩體和之間的接觸面,利用有限元計算出水位變化對應力的影響。
  8. The choice dam type is especial importance, during the designed research of the rock - fill dam, particular under the rock - fill dam with very deeply cover layer, the stress and strain of the middle wall and cutting interpenetration wall of the dam foundation is mostly sensitive, whether the. design of dam is scientific and reasonable, it is very important for cutting interpenetration and stability of the dam, the article offer the reference for the design of cutting interpenetration in the foundation with deep cover with earth the water conservancy in xiaban zone, based on the study and analysis the design of cutting seep in the foundation with deep cover with earth, cutting interpenetration concrete wall and the joining model of cutting interpenetration material in body of dam and the applying effect in the practical worko based on the foundation which absorbed and summarize the achievement of design and research in the inter and outer country, for the project of the clay vertical middle wall and vertical cutting interpenetration, the asphalt concrete vertical middle wall and vertical cutting interpenetration the clay inclined middle wall and the lever carpet layer cutting interpenetration, respectively in terms of the different stage of complete period sluice period and working condition, adopting nonlinear calculate and analysis with the finite element method ; carrying the analysis and study with the 3d finite element method as to the different joining model of the left bank high slope cutting interpenetration body and the foundation concert cutting interpenetration wall ; carrying the analysis and study with the 3d finite element method as to the effect of the wall stress and strain because of the different elasticity modulus of the concert cutting interpenetration wall through the analysis and study with the different project. have comparatively all - around comprehended the various model dam, particular the distribute rule of stress and strain of the cutting interpenetration system, provide for the important evidence of the plastic area size the join model of the foundation cutting interpenetrate wall and dam body cutting interpenetrate system the choice of the dam model and the design of the structure of the dam body, the result of research and advice have very importance value in design and building for the similarity project

    工程設計中,壩型的選取顯得尤為重要,特別對于壩基有深厚覆蓋層的堆石壩,心和壩基的應力和變形是壩體、壩基最敏感的部位,設計方案是否安全、科學和合理,對大壩滲和穩定起到至觀重要的作用。本文研究分析了國內外深厚覆蓋層基礎滲設計、壩基混凝土與壩體滲體銜接形式及工程實際應用效果,為下坂地水利樞紐工程深厚覆蓋層基礎滲設計的方案選擇提供了參考;在吸收和歸納了國內外堆石壩的設計研究成果的基礎上,對粘土心和壩基垂直滲方案、瀝青混凝土心和壩基垂直滲方案以及粘土斜心和壩基水平鋪蓋滲方案,分別按竣工期和蓄水運行期的不同工作情況進行了有限元非線性計算分析;對左岸高陡邊坡的大壩滲體與基礎混凝土的不同結合型式進行了三維有限元靜力計算分析和研究;對混凝土不同性模量對體應力和變位的影響進行了三維有限元靜力計算分析和研究。通過對不同方案的計算分析和研究,比較全面的了解了各方案壩體,尤其是滲體的應力和變形分佈規律,為壩型選擇、壩體結構設計、基礎與壩體滲體的結合型式以及塑性區大小的確定提供了重要依據。
  9. We have successfully developed, researched and produced concrete expansion agent, high performance water - reducing agent, pump - sending agent, quick - coagulating water - reducing agent, high performance concrete mixing material, green environmental senior inner wall putty, pcc spring concrete waterproof coating and so on. our series products have gained high fame among our clients after being put into market

    幾年來,經過我們的共同努力,我公司成功地開發研製生產了混凝土膨脹劑,高效減水劑緩凝減水劑泵送劑早強減水劑高性能混凝土摻合料綠色環保型高級內膩子粉和pcc性水泥水塗料等20多個品種。
  10. After the invention of fire glass works, and many examples of the application of experience, in order to ensure that the special glasses ( fire. bomb blast ) walls partition function of the overall system, we designed a matching profile steel frame system

    經過火玻璃的發明應用及眾多工程實例的經驗總結,為了確保特種玻璃(火、)幕、隔斷的整體系統功能,我們開發設計了配套的鋼型材框架系統。
  11. Introduces some anti - seepage high embankment dams in the world with bitumen concrete inclined core wall, and analyzes, taking the existing maopingxi embankment dam as an example, the effect of slope thereof on the stress and deformation of the wall by non - linear adhesive elastic finite element calculation changing the type and thickness of the core wall

    摘要介紹世界上幾座瀝青混凝土斜心滲高土石壩,並結合國內已建的茅坪溪瀝青混凝土心壩,通過改變其心形式和厚度,並用非線性粘性有限元對其進行計算分析,探討了斜心的傾斜斜率對心的應力與變形的影響。
  12. To be the wall material of gtdw, comparing with the conventional concrete diaphragm wall, plastic concrete has a much lower elastomeric modulus that approaches to that of the around soil. as a result, the deformation of the plastic concrete diaphragm wall under pressure will be similar with that of the around stratums. the stress state of the iii diaphragm wall is greatly improved and thus improvement will make it easy for the diaphragm wall to fit the stress changes by the thinner of wall or the frequent changes of the water level

    塑性混凝土作為抓鬥薄體材料,相比于普通混凝土性模量顯著降低,使其更接近於圍土材料的變形模量,所以塑性混凝土在其受力后的變形能很好地于周圍地層相協調,因而能大大改善的應力狀況,更好地適應體變薄及長江水位頻繁變化而帶來的應力變化。
  13. To ensure the safety of the dam and provide the technology for the decision during the process of construction and store water. in this article, the elastic - plastic stress - deformation of dam is calculated and the consolidation is analyzed. including the rock - fill dam, the stress and deformation distribution of cut - off wall, the deformation of sloping core, the incresment and subduction of pore water pressure and the effective stress situation calculation

    為確保大壩安全,並為大壩施工期和蓄水期運行決策提供必要的技術支持,本論文根據上壩土料的應力一應變一強度特性、滲透和固結等特性,對壩體進行了塑性應力變形計算和固結分析,包括大壩堆石體、的應力及變形分佈和斜心的變形、孔隙水壓力增長及消散和有效應力狀態計算等。
  14. Explosive shell tore into the wall of the strongpoint

    爆炸的炮炸穿了守據點的壁。
分享友人