防水應變計 的英文怎麼說

中文拼音 [fángshuǐyīngbiàn]
防水應變計 英文
waterproof gage
  • : Ⅰ動詞(防鷥) provide against; defend against; guard against Ⅱ名詞1 (防守; 防禦) defence 2 (堤...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 應動詞1 (回答) answer; respond to; echo 2 (滿足要求) comply with; grant 3 (順應; 適應) suit...
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • 防水 : waterproof; water proofing
  1. Based on consider hereinbefore, this dissertation discusses several aspects on the problem of the sustainable and optimum exploitation of groundwater resources as follows : ( 1 ) reviewed entirely the origin and evolvement of the concept " sustainable development ", stated and commented the study status in queue on " sustainable development " around national and international range, thorough discussed the science connotation about the concept " sustainable development " ; ( 2 ) looked back and commented across - the aboard some furthest basic concept and proposition related to groundwater resources, put forward self opinions on a few existent mistake points of view and chaos understandings ; ( 3 ) expatiated entirely on the content and meaning of the theory of changeable groundwater resources system, contrast with the traditional methods of groundwater resources calculation and evaluation, combined example to show the application of this theory ; ( 4 ) thorough analyzed the difficult and complexity to forecast the groundwater resources, fully stated the traditional methods of groundwater resources forecasting, pointed out the characteristic and applying condition of these forecasting method, introduced the main ideas and methods of wavelet analysis developed recently, and the matlab software be known as the fifths era computer language, and its accessory wavelet analysis toolbox, applied these methods and tools to analyze the groundwater dynamic curve, adopted the b - j method and morte - carlo method, combined with the theory of changeable groundwater resources system, discussed the new view on the forecast of groundwater resources ; ( 5 ) synthetically analyzed the characteristics and limitations of the present all kind of groundwater manage model, combined mathematical programming mathematical statistics random process and the theory of variation system of groundwater resources on the unite optimum attempter of surface water and groundwater, emphasized how to make the model more nicety, more simple, more practicality ; ( 6 ) analyzed the inside condition and outside condition to assure the sustainable and optimum exploi tation of groundwater resources, the inside conditions are the follows : correct resources idea, scientific methods of resources calculation and evaluation, credible forecast methods of resources, exercisable measures of resources management, the outside conditions are the follows : the development idea of high layer, the transform of manage system, the matched policy and rule of law, the adjusted of economy lever, the improve of cultural diathesis, the boosting up of water - saving consciousness and detail measures, the control of population rising, the prevention and cure of water pollute, the renew and rebuild of ecology ; ( 7 ) scan the sustainable and optimum exploitation of groundwater resources from the high level of metagalaxy, earth system science, and philosophy ; lint out the more directions on groundwater resources

    基於以上考慮,論文主要從以下幾方面對地下資源可持續開發問題進行了比較深入的探討:全面回顧了「可持續發展」概念的由來與演,對國內外「可持續發展」的研究現狀進行了述評,並對「可持續發展」概念的科學內涵進行了深入探討;對涉及地下資源的一些最基本的概念和命題進行了全面的回顧和評述,對目前仍然存在的一些錯誤觀點和混亂認識提出了自己的見解;全面闡述了地下資源值系統理論的內容和意義,並與傳統的地下資源算評價方法進行了對比分析,結合實例具體說明了方法的用;深入分析了地下資源預測預報工作的極端重要性和復雜性,對傳統的地下資源動態預測方法進行了全面的評述,指出了各類預測預報方法的特點及適用條件,對最近二十多年剛發展起來的小波分析技術的主要思想和方法及其用范圍,以及號稱第五代算機語言的matlab軟體和附帶的小波分析工具箱進行了介紹,並用於地下動態過程線的分析,採用時間序列中的b ? j法,蒙特卡羅方法,與地下資源值系統理論相結合,探討了地下動態資料分析和地下資源預測預報的新思路;綜合分析了現今各類地下管理模型的特點及缺陷,將數學規劃、數理統、隨機過程等與地下值系統理論相結合進行地表地下或多源的聯合優化調度,使模型更準確、更實用;對保證地下資源可持續開發的內部條件和外部條件進行了分析,內部河海人學博卜學位論文前言、摘要、目錄條件主要是正確的資源觀,科學的資源算與評價方法,可靠的資源預測預報技術,可操作的資源管理措施,外部條件主要是高層發展思路、管理體制的革、配套的政策法規、經濟杠桿的調節、人文素質的提高、節意識的增強及具體節措施、人口增長的控制、體污染的治、生態的恢復和重建等;從宇宙科學、地球系統科學及哲學的高度審視地下資源的可持續開發;指出了地下資源可持續開發的進一步研究方向。
  2. The main content of this article includes : " ( l ) the planar non - linear and viscid - elastic static mechanical analysis is used to analyze and calculate the md in service. ( 2 ) the planar nonlinear static mechanical analysis of the stress and deformation is used to analyze the med in banking, which is banked to the height of 140m

    主要研究工作有: ( 1 )茅坪溪護大壩完建和蓄時的力和形的分析算:對完建和蓄時壩體的力和形進行平面非線性靜力分析算和平面粘彈性靜力分析算,對分析算結果作出結論。
  3. Therefore a physics - based conceptual model for forecasting in the cold zone of china is established, and the effectiveness of the model has been proved by practical operation in three basins of dunhua, changding and hengdaohezi. finally, for the purpose to popularize the presented model, a software system is completed and some new ideas are created in the system such as the interface design, selection of methods, option and integration of the procedures and so on. the system has been working very well in several basins in the north - east of china

    為使模型能夠得到推廣用,使研究成果為生產力,還建成了寒區文預報軟體系統,在系統的研建過程中,經過反復修改和完善,在界面設、預報方法選擇、預報方案生成和串接、系統的維護擴展、洪調度、報汛測站的設置和動等六個方面具有鮮明特色,使建成的系統具有實用性、通用性、友好性、可擴展性等優點,受到用戶的一致好評。
  4. Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying, design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no. 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying, design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength, stability and thermal control problem for xi - luo - du project

    溪洛渡電站超大型地下洞室群圍巖穩定的安全可靠性分析:被成都勘測設研究院用於比選報告及可行性論證中; ( 2 )小關子電站攔河閘壩及地基的分析:被成都勘測設研究院用於地基加固處理方案; ( 3 )三峽廠房7 # - 14 #壩段溫控並縫措施研究:為廠房壩段並縫方案的可行性提供了依據; ( 4 )堤工程體系的長期監控預報預警決策系統開發:為監控、預測預報堤滲漏管涌破壞提供分析軟體; ( 5 )向家壩地下洞室群圍巖穩定的安全可靠性分析:被中南勘測設研究院用於初步設方案中; ( 6 )靠船墩的疲勞可靠度研究:為廣東航運規劃設院的靠船墩優化設和加固提供依據; ( 7 )溪洛渡高拱壩壩體壩基(壩肩)強度和穩定的三維靜動力隨機有限元分析及可靠度算:為溪洛渡重大工程壩體的靜動力安全穩定性及溫控方案提供依據。
  5. The cost control of hlsip shoud take a method of quota design step by step during the design stage ; during the construction seage, the emphasis should be attached to optimizing construction scheme, check and signing the working drawing and making a strict demand on metering pay. at the same time, the cost out - of - control should be avoided, and the constructor should treat the project change cautiously and properly handle the claim

    高揚程梯級提灌溉工程的投資控制,在設階段逐步推行限額設的作法;施工階段以優化施工方案,審簽施工圖紙,嚴格量支付為重點,止投資失控,同時要謹慎對待工程更,正確處理索賠事宜。
  6. Three phase dry type power transformer, which make it with those features : safety, reliability, and energy saving, fireproof, flameproof, simple maintenance etc., the design is advanced ; the structure of products is reasonable and the outline is fine, the main performances of the products are much better than the national standards, for example, partial discharge level no - load loss, on - load loss, noise level, it is adaptable for application on heavy humidity and severely pollute places which are near to lake, sea and rive, as well as, high demand - fireproof, heavy load capacity place, such as : high building, airport, station, port, underground, hospital, electrical power station, metallurgy, shopping center, residential area and petroleum chemical industry, nuclear power station, nuclear - powered submarine

    非包封線圈三相干式壓器,具有安全可靠節能爆維護簡單等優點。其設先進結構合理外形美觀。主要性能指標均優于國內標準,如局放平空載損耗負載損耗噪聲以及能適高溫度環境使用等,可安裝在靠近湖海河邊污穢潮濕的環境及火要求高負荷較大的地區,適用於高層建築機場車站碼頭地鐵醫院電廠冶金行業購物中心居民密集區以及石油化工核電站核潛艇等場所。
  7. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、模板工程、混凝土工程、預力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模板的設、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;雙控制確保預力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、橋面層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  8. Abstract : in this paper, the major problems in water resources, flood and drought, and water environment in china are analysed, and new subjects of study on hydrology are pointed out, including the uncertainty of hydrological phenomena, the effect of human activities on hydrology, the calculation of water level frequency, the optimum effcet of water resource development and utilization, the analysis of water supply and demand, the mechanism of water - saving agricultural irrigation, flood and drought prevention, etc

    文摘:從資源開發利用與保護、旱災害治等方面論述中國當前存在的主要問題:危機和浪費同時存在、污染日趨嚴重、洪減災任重道遠、生態環境破壞嚴重、全球氣候暖產生不利影響;進而論述文學研究面臨的新課題:文現象的不確定性、人類活動對文的影響、位頻率算、資源開發利用的最佳效資源供需分析、農業節灌溉機理及旱災害的治,並指出必須加強對這些新課題的研究
  9. Sparedescription : in this paper, the major problems in water resources, flood and drought, and water environment in china are analysed, and new subjects of study on hydrology are pointed out, including the uncertainty of hydrological phenomena, the effect of human activities on hydrology, the calculation of water level frequency, the optimum effcet of water resource development and utilization, the analysis of water supply and demand, the mechanism of water - saving agricultural irrigation, flood and drought prevention, etc

    描述:從資源開發利用與保護、旱災害治等方面論述中國當前存在的主要問題:危機和浪費同時存在、污染日趨嚴重、洪減災任重道遠、生態環境破壞嚴重、全球氣候暖產生不利影響;進而論述文學研究面臨的新課題:文現象的不確定性、人類活動對文的影響、位頻率算、資源開發利用的最佳效資源供需分析、農業節灌溉機理及旱災害的治,並指出必須加強對這些新課題的研究
  10. During the course of stress calculation, the concrete watertight wall and the soil around are supposed to be linear elastic material, the onsolidation of dam is supposed to be completed before the watertight wall is constructed, the contact element is adopted to simulate the interface between the dam and watertight wall, and the completed before the watertight wall is constructed, the contact element is adopted to simulate the interface between the dam and watertight wall, and the influence towards the stress of watertight wall when water elevation changes is calculated by fem

    算時將砼滲墻及周圍土體假設成線彈性材料,假設在滲墻施工時壩體固結已經完成,用接觸單元模擬壩體和滲墻之間的接觸面,利用有限元算出化對滲墻力的影響。
  11. Thirdly, because the depth of the seepage prevention wall of xia ban di dam project has the value of 85m which is the maximum depth in the dam projects in our country, the stress state of the seepage prevention wall is very complicated, the influence of nine modulus for nine kinds of seepage prevention wall material on the stress and displacement of the seepage prevention wall is studied and the rule of the change of stress and displacement with the change of characteristic parameters for seepage prevention wall under time of engineering completion and water impounding operation period is given in this paper

    第三,鑒于大壩基礎混凝土滲墻深度達85m ,厚度僅為1 . 0m ,滲規模和工程難度為國內之最,墻體力比較復雜,本文研究了大壩施工填築竣工期、庫蓄運行期滲墻的力和形隨墻體參數的化而化的規律,為大壩安全設滲墻墻體材料的選擇提供了理論依據。
  12. The choice dam type is especial importance, during the designed research of the rock - fill dam, particular under the rock - fill dam with very deeply cover layer, the stress and strain of the middle wall and cutting interpenetration wall of the dam foundation is mostly sensitive, whether the. design of dam is scientific and reasonable, it is very important for cutting interpenetration and stability of the dam, the article offer the reference for the design of cutting interpenetration in the foundation with deep cover with earth the water conservancy in xiaban zone, based on the study and analysis the design of cutting seep in the foundation with deep cover with earth, cutting interpenetration concrete wall and the joining model of cutting interpenetration material in body of dam and the applying effect in the practical worko based on the foundation which absorbed and summarize the achievement of design and research in the inter and outer country, for the project of the clay vertical middle wall and vertical cutting interpenetration, the asphalt concrete vertical middle wall and vertical cutting interpenetration the clay inclined middle wall and the lever carpet layer cutting interpenetration, respectively in terms of the different stage of complete period sluice period and working condition, adopting nonlinear calculate and analysis with the finite element method ; carrying the analysis and study with the 3d finite element method as to the different joining model of the left bank high slope cutting interpenetration body and the foundation concert cutting interpenetration wall ; carrying the analysis and study with the 3d finite element method as to the effect of the wall stress and strain because of the different elasticity modulus of the concert cutting interpenetration wall through the analysis and study with the different project. have comparatively all - around comprehended the various model dam, particular the distribute rule of stress and strain of the cutting interpenetration system, provide for the important evidence of the plastic area size the join model of the foundation cutting interpenetrate wall and dam body cutting interpenetrate system the choice of the dam model and the design of the structure of the dam body, the result of research and advice have very importance value in design and building for the similarity project

    工程設中,壩型的選取顯得尤為重要,特別對于壩基有深厚覆蓋層的堆石壩,心墻和壩基滲墻的力和形是壩體、壩基最敏感的部位,設方案是否安全、科學和合理,對大壩滲和穩定起到至觀重要的作用。本文研究分析了國內外深厚覆蓋層基礎滲設、壩基混凝土滲墻與壩體滲體銜接形式及工程實際用效果,為下坂地利樞紐工程深厚覆蓋層基礎滲設的方案選擇提供了參考;在吸收和歸納了國內外堆石壩的設研究成果的基礎上,對粘土心墻和壩基垂直滲方案、瀝青混凝土心墻和壩基垂直滲方案以及粘土斜心墻和壩基平鋪蓋滲方案,分別按竣工期和蓄運行期的不同工作情況進行了有限元非線性算分析;對左岸高陡邊坡的大壩滲體與基礎混凝土滲墻的不同結合型式進行了三維有限元靜力算分析和研究;對混凝土滲墻不同彈性模量對墻體力和位的影響進行了三維有限元靜力算分析和研究。通過對不同方案的算分析和研究,比較全面的了解了各方案壩體,尤其是滲體的力和形分佈規律,為壩型選擇、壩體結構設、基礎滲墻與壩體滲體的結合型式以及塑性區大小的確定提供了重要依據。
  13. The major research areas of a ship against non - contact underwater explosion include four sectors, namely, ( 1 ) the characteristics of fluid field disturbed by an underwater explosion ( loadings of underwater explosion ) ; ( 2 ) the analysis of transient fluid - structure interactions, and the corresponding dynamic responses of the ship ; ( 3 ) safety assessment of the ship structure undertaking the elastic - plastic dynamic responses ; and ( 4 ) determination of the shock environment imposed on the shipboard equipments, and evaluation of shock protection design

    即非接觸下爆炸的流場特徵(下爆炸載荷) 、瞬態流場與結構相互作用所決定的艦船動響分析方法、以彈塑性動形響分析為依據的艦船結構下爆炸安全性評估與護技術、以船體結構動響為輸入條件的船用設備沖擊環境的確定方法及相的設備抗沖擊設分析方法。
  14. It also puts forward logical explanations to a few facts that are still unable to be explained, up to now, by the classical consumption models. however, for the scholars in china, the cognition of the buffer - stock theory still remains at a superficial level of only providing simple theoretical introduction to it. a finer depiction and empirical application of it will not only facilitate studies on the related theories in china but also do great benefit to the development of the buffer - stock theory itself because china is admittedly one of the

    本論文的主要發現及創新包括:在理解和刻畫我國居民的預性儲蓄行為時,緩沖儲備模型要優于以儲蓄平量作為被解釋量的模型;核密度估方法對不確定性的描述更準確;從儲蓄率化率的角度進行的格蘭傑因果關系檢驗證實了我國的居民存款儲蓄對經濟增長有推動作用;養老金的化對我國居民儲蓄行為具有顯著影響,而我國現有的醫療保障體系沒有發揮其該能夠發揮出的作用。
  15. Based on the analysis and calculation results, it is proven that geomembrane is an ideally impervious material. it has good performances in such aspects as impermeability, elasto - plastic deformation adaptability, resistance ability against erosion

    各種分析論證及其算結果均證明土工膜是一種理想的滲材料,具有很好的不透性,很好的彈塑性形能力,有一定的抗拉能力,能夠承受施工力和工作力。
  16. To ensure the safety of the dam and provide the technology for the decision during the process of construction and store water. in this article, the elastic - plastic stress - deformation of dam is calculated and the consolidation is analyzed. including the rock - fill dam, the stress and deformation distribution of cut - off wall, the deformation of sloping core, the incresment and subduction of pore water pressure and the effective stress situation calculation

    為確保大壩安全,並為大壩施工期和蓄期運行決策提供必要的技術支持,本論文根據上壩土料的力一一強度特性、滲透和固結等特性,對壩體進行了彈塑性算和固結分析,包括大壩堆石體、滲墻的力及形分佈和斜心墻的形、孔隙壓力增長及消散和有效力狀態算等。
  17. Under the horizontal earthquake action and wind force, aim at " the pure frame structure with rectangle columns ", " the pure frame structure with special - shaped columns ", " the frame - truss structure with special - shaped columns " and " frame - shear wall structure with special - shaped columns ", earthquake action analysis was done by the spacial finite element method through the changes structural parameter. analyzing systematically " structure vibration mode ", " vibration period ", " structure lateral rigidity ", " seismic action force ", " seismic response force ", " floor seismic shear force ", " lateral horizontal displacement of structure " and " members internal force ". results indicate : ( 1 ) based on equal area, the special - shaped columns replaced the rectangle columns, the structural lateral rigidity enlarges, the lateral displacement minishes obviously, the earthquake response increase slightly, the biggest increasing amount of frame columns axis - compress ratio is smaller than 0. 08. the whole aseismic performance of structure has improved ; ( 2 ) when the section ' s length and section ' s thickness ratio of special - shaped columns is smaller than 3. 6, the structure benefits to resist seismic action ; ( 3 ) the angle of horizontal seismic action with the whole coordinate is 0 degree, structure earthquake response is bigger, belonging to a control factor of structure aseismic design ; ( 4 ) the frame - truss structure with special - shaped columns and the " a " - brace has the biggest lateral rigidity ; ( 5 ) the frame - shear wall structure with special - shaped columns have bigger lateral rigidity and smaller displacement, members internal force enlarged just rightly, have much superiority of resisting seismic action ; ( 6 ) in the higher seismic fortification criterion region ( 8 degree of seismic fortification intensity ), aseismic disadvantageous building site ( iii type site ), adopting special - shaped columns structure system, should reduce possibly the building ' s self - weight in order to reduce the earthquake response ; ( 7 ) the response spectrum method of computing seismic response and the time - history analysis method have similar analysis result

    西安理工大學碩士學位論文在平地震作用下,並考慮風荷載組合,分別對「矩形柱純框架結構」 、 「異型柱純框架結構」 、 「異型柱框一析架結構」及「異型柱框-剪結構」等四種結構體系,通過改結構參數,運用空間有限元方法,進行地震作用算。系統地分析研究「結構振型」 、 「振動周期」 、 「結構側向剛度」 、 「結構地震反力」 、 「樓層地震剪力」 、 「結構側向位移」 、 「層間位移角」 ,以及「構件內力」 。結果表明:在等面積原則下,異型柱代換矩形柱后,結構剛度增大,側向位移明顯減小,地震反力略有增加,框架柱軸壓比最大增幅小於8 % ,結構整體抗震性能有所提高;當異型柱肢長肢厚比小於等於3 . 6時,結構有利於抗震;平地震作用力與整體坐標夾角為0度時,結構地震作用效較大,屬結構設的控制因素之一;異型柱框一析架結構採用「人」字斜撐,側向剛度大於「八」字斜撐和「人一八」字混合斜撐;異型柱框一剪結構側向剛度大、位移小,構件內力增大適中,是一種抗震性能優越的結構體系:在抗震設烈度較高地區( 8度)和抗震不利的建築場地( m類場地) ,採用異型柱結構體系時,盡可能減輕結構自重,降低地震作用力;分別採用「振型分解反譜」法和「時程分析」法進行地震作用算,兩種方法所得結果基本一致。
  18. Based on the reservoir bank protection project, the reconnaissance design, the construction, distortion slope body technical and so on, and according to the ecological prospecting and the forecast appraisal achievement of mountainous area reservoir runned for many years, through actual investigation of the collapses of the bank, the distribution distortion, the types and forming conditions, the collapses formation mechanism of the bank and the types of the pattern are analyzed, and of the bank collapsing parameter of each kind of gneiss under and above water stable angle of slope and so on are confirmend

    摘要利用已運行多年的山區型庫地質勘探、預測評價成果,在掌握庫岸護工程的勘察設、施工及形坡體的監測等技術資料的基礎上,通過對塌岸及形的分佈、類型及形成條件等方面問題的實測調查,分析塌岸效的形成機制及模式類型,確定各類巖土體的下及上穩定坡角等塌岸參數。
  19. Waterproof type strain gauge

    防水應變計
分享友人