防波堤堤頭 的英文怎麼說
中文拼音 [fángbōdīdītóu]
防波堤堤頭
英文
breakwater end-
Lama exper in evaluation, planning, edsign, environmental appraise, engineering cost, inspection and relative scientific research subject advisory of haror, wharf, breakwater, and slipway project in prot and waterway engineering
擅長對水運工程中的港口、碼頭、防波堤、船臺、滑道等工程項目的評估、規劃、設計、環境評價、工程造價、監理及有關科研課題的咨詢。It continued with the planning of the modification to the northern breakwater of the china ferry terminal, and the reconstruction of the existing public piers at pak sha wan, tung lung chau, hei ling chau, tai lam chung and castle peak
該署在年內繼續策劃改建中國客運碼頭的北防波堤,重建五個分別位於白沙灣、東龍洲、喜靈洲、大欖涌及青山的公眾碼頭。Head of breakwater
防波堤堤頭It commenced construction of a light beacon at sha lo wan, public piers at sai kung and sam ka tsuen, modification to the northern breakwater of china ferry terminal and the planning for construction of a sheltered boat anchorage at tai o
同時,又開始了沙螺灣燈塔、西貢和三家村公眾碼頭的興建工程、改建中國客運碼頭的北防波堤,以及策劃興建大澳的船隻碇泊處。分享友人