防洪水庫 的英文怎麼說

中文拼音 [fánghóngshuǐ]
防洪水庫 英文
flood control pool
  • : Ⅰ動詞(防鷥) provide against; defend against; guard against Ⅱ名詞1 (防守; 防禦) defence 2 (堤...
  • : i 形容詞(大) big; vast; grand Ⅱ名詞1. (洪水) flood 2. (姓氏) a surname
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • 防洪 : flood protection; flood control; prevent or control flood
  • 水庫 : reservoir水庫岸防護林 reservoir bank protection forest; 水庫測量 reservoir survery; 水庫出流量 ou...
  1. Operation of sanmenxia reservoir on the control of flood and ice run after xiaolangdi project operated

    小浪底運用初期三門峽運用分析
  2. The existing problems in the design of reservoir flood operations is analyzed, then aiming at the insufficience of the typical flood, the method for reservoir flood operation with classified forecast is presented in this paper

    摘要在分析調度設計存在問題的基礎上,針對典型過程代表性的不足,本文提出了分類預報調度設計方法。
  3. Article 37 no unit and individual may damage, occupy or destroy flood control works such as dams, embankments, sluices, bank revetments, pumping stations and drainage systems, hydrological and communications facilities and standby apparatuses and materials for flood control

    第三十七條任何單位和個人不得破壞、侵佔、毀損大壩、堤閘、護岸、抽站、排渠系等工程和文、通信設施以及汛備用的器材、物料等。
  4. Study on flood control forecast operation model of biliuhe reservoir

    碧流河預報調度方式研究
  5. Taking the biliuhe reservoir as an example, the determination process of satisfied flood operation mode is systematically illustrated in this paper

    隨后以碧流河為例,詳細闡述了分類預報調度規則的確定過程,並給出了實時預報調度的流程。
  6. Because of the unreasonable operation mode, the reservoirs sedimentation is serious, which lead to the problems of inadequate use of water resource, degressive works benefit and high risk in water works operation and flood control in this area

    但長期以來,由於運用方式不合理,工程泥沙淤積嚴重,徑流資源得不到充分利用,工程效益逐年衰減,並對工程運行和地區安全形成嚴重威脅。
  7. These measures include : rehabilitation of vegetation with preserving soil and water on the eroded infertile soils, the entrance to “ soil reservoir ” dredged by controlling with different eroded soil types, using “ soil reservoir ” of the upper reaches of the yangtze river bigger much more than the reservoir of the three gorges

    充分調用「土壤」實現長江流域減災的措施應包括建立保土保的地表植被系統,分類整治侵蝕劣地土壤,疏浚入滲「土壤」的通道,以及重視調用一個比三峽容大得多的「土壤」 。
  8. Taking into account weather and flood forecast information ; the forecast operation manner is studied under the condition of without the change of the existing flood control standard to realize the conversion of flood control and benefits. ( 4 ) through analyzing runoff and water utilization information during reservoir operation, design flood, and the existin

    汛陽位動態控制方法研究及其風險分析根據流域天氣預報、流域前期降雨、能力和興利要求,利用汛限位變動范圍,結合預報和短期降雨預報模型,研究汛限位動態控制方法。
  9. The geographic information systems ( gis ) allows the modulation and simulation of different scenarios and the graphic representation of the different alternatives. in order to present and explain to a non expert public like politicians and the population in the floodplain, multimedia technology will play a valuable role trying to make the decision making process more participated

    (四)在利工程管理方面,從舊有的單純的利工情數據擴展到以利工情信息為基礎數據背景的工程風險管理系統,對各類工程在狀態下的安全性進行評估、城市工程規劃、城市發展與工程相結合、工程實施投資效益分析、工程建設對環境質量的影響等等。
  10. Therefore a physics - based conceptual model for forecasting in the cold zone of china is established, and the effectiveness of the model has been proved by practical operation in three basins of dunhua, changding and hengdaohezi. finally, for the purpose to popularize the presented model, a software system is completed and some new ideas are created in the system such as the interface design, selection of methods, option and integration of the procedures and so on. the system has been working very well in several basins in the north - east of china

    為使模型能夠得到推廣應用,使研究成果變為生產力,還建成了寒區文預報軟體系統,在系統的研建過程中,經過反復修改和完善,在界面設計、預報方法選擇、預報方案生成和串接、系統的維護擴展、調度、報汛測站的設置和變動等六個方面具有鮮明特色,使建成的系統具有實用性、通用性、友好性、可擴展性等優點,受到用戶的一致好評。
  11. The summer flood reason is the key period for reservoir controlling flood and achieving benefit because this stage is longer and the volume of flood is larger

    春汛的風險進行了定性分析。夏汛時間長,量大,是確保安全和實現興利效益的關鍵時期。
  12. Many geological and hydrological factors of the river section, where the yellow river water intake engineering is laid out, such as the capacity of the reservoirs along the river section upstream and downstream, the rate of the flow discharge, the erosion and silt of the watercourse, the form of the riverbed and the water current, ice tuck, the convergence of the upstream branches of the river section, flood crest, sand crest size, the capacity for flood discharge of the watercourse, the effect of flood control structure around and the impacts on surrounding environment and the third person " s legitimate rights and interests, should be considered

    黃河取工程的布設要考慮工程所處河段的地質文等諸多因素。如該河段上下游容,泄流量、河道沖刷、淤積、河床形態、流形態、冰塞、河段上游的支流匯入、峰、沙峰的大小、河道行能力的大小、周圍工程的影響及對周圍環境和第三人合法權益的影響等等。
  13. When the water situation of any river or lake approaches the guaranteed water level or the safety flow capacity, or when the water level of any reservoir approaches the level of design flood, or when a great danger occurs to flood control works, the flood control headquarters under the relevant people ' s government at or above the county level may declare an emergency flood season

    當江河、湖泊的情接近保證位或者安全流量,位接近設計位,或者工程設施發生重大險情時,有關縣級以上人民政府汛指揮機構可以宣布進入緊急汛期。
  14. The planners with their experience pertain to reservoir flood operations, regulate the design hydrographs of different weather systems and herewith establish satisfied flood operation rules with classified forecasts for better reservoir real - time operation

    結合調度經驗,調度設計人員通過分別調節不同天氣系統成因的設計過程,建立滿意的分類預報調度規則,用來更好地指導實時調度。
  15. Finally, taking the panjiakou reservoir in the haihe river basin in china as an example, the paper analysis the reasonable adjustment scheme of the limited level of the reservoir during the flood season according to the design flood, the flood forecasting, the flood control operation under forecasting, the flood control standard of upstream and downstream of the reservoir, the immigrants range, and the benefits and the risk of the reservoir in a long period of the operation simulation

    最後以海河流域潘家口為分析實例,從設計、預報預泄、預報調度方式、上下游設計標準、上游移民淹沒及土地退賠線、長期運行的風險和效益等多個方面分析論證了汛限位的合理調整方案。
  16. The application to qingjiang cascade hydropower plants shows that the proposed model can give the controlling rules for optimal dynamic flood storage and elevates the efficiency of reservoir system management and utilization of flood water

    該模型應用於清江流域梯級,計算結果表明,在不降低及梯級原有的標準前提下,能有效利用上游布埡容,分擔隔河巖部分任務,並顯著提高梯級發電量。
  17. A research on decision support system for basin flood control scheduling is presented by a case study of complicated flood control system of downstream basin of the yellow river including reservoir, river channel, flood diversion area and flood detention area in this paper

    流域系統聯合調度是提高流域工程體系能力的重要非工程措施,本文以黃河下游包含、河道與分滯區的復雜系統為實例進行了流域調度決策支持系統的研究。
  18. Whereafter, based on the analysis on the flood influence for traffic lines, the research is centered on the following parts : firstly, the destroying modes, reasons and mechanism of flooded lines are discussed, and the frameworks and countermeasures of preventing and controlling hazards system are put forward ; secondly, the ways of region forecasting for the landslide are analyzed and the automation of landslide forecast for certain site through visual programming is realized. furthermore, the function of dynamic segmentation in arc view is made use of to realize the forecast result ' s visualization ; thirdly, the reasons and patterns of roadbed subsidence are discussed and the methods of forecasting subsidence based on the gm ( 1, 1 ) model are put forward. then the applications of the arcview software and its extended module on the study of roadbed subsidence are debates upon ; fourthly, an analysis on the sources of flood for traffic lines, which situate in the reservoir coverage area, is given

    接著,論文探討了山區交通線路災害的特點、分類、時間和空間分佈規律以及災害的治原則和對策等;然後,以災害對交通線路的毀壞為主線,重點研究和分析了以下幾個問題:第一,探討了對交通線路的破壞方式,毀原因以及毀機理,並提出了交通線路禦系統框架和對策;第二,分析了雨季邊坡塌方災害的區段預測方法;通過可視化編程,編制了雨季邊坡塌方災害的工點預報程序,並結合arcview實現了預測結果的可視化;第三,對路基沉陷原因和模式進行了分析,並提出利用gm ( 1 , 1 )模型對路基沉陷區進行分析和預測,最後論述了arcview軟體及其擴展模塊在沉陷區研究分析中的應用;第四,對汛期區線路災害的原因進行了分析,並探討了利用數量化理論對路基護工程抗能力進行預測的意義;第五,提出從風險的角度對交通線路的災減災進行管理,對風險估計的相關問題進行了論述,並探討了交通線路害危險區段的劃分問題。
  19. Based on the analysis of satellite images of various periods, landform data and river channel transverse section evolution in the lower yellow river, the characteristics of the river channel boundary condition changes at different location are clarified as middle flood channel flood transport width and area are evidently decreased especially for the main channel with comparison to 1950s, beach area that is unimpeded before become blocked because of road, irrigation channel constructed on it, and consequently intensify high edge of beach and lowering dyke and river

    在現場查勘的基礎上,通過對丹江口和小浪底攔沙初期下遊河道演變、排能力變化特點的對比,分析了黃河下游面臨的新形勢:小浪底攔沙初期,下遊河道發生沖刷,但艾山以下窄河段沖淤變化不大,近年來形成的淤積萎縮的狀況難以很快改觀,游蕩性河段調整劇烈,工程出險機遇增大,河道位流量關系中流量以下部分同流量位明顯降低,中流量以上部分位降低幅度可能會明顯偏小,形勢仍不容樂觀。
  20. This thesis concludes the flood control situation, engineering measures and the situation of optimal dispatch method. it studies flood control engineering system, which is composed of flood prevention reservoir, river course dyke and natural detention basin, and the relationship between various flood engineering measures according to the composition and characteristics of the flood control engineering of the middle - lower reaches of beijiang. it suggests the objective function based on the least flood loss and the optimal dispatch strategy structure of the middle - lower reaches of beijiang bound with the requirements of the flood gradual progress equation combined with hydrology and hydraulics

    本論文總結了我國情勢、工程措施及其優化調度方法研究的現狀;針對珠江流域北江中下游體系的組成及其工程的特性,研究由防洪水庫、河道堤和天然滯區共同組成的工程體系中各工程措施之間的關系;提出了以災損失最小為目標函數、以文學和力學相結合的演進方程等要求為約束條件的北江中下游體系優化調度策略框架。
分享友人