防滲地基 的英文怎麼說

中文拼音 [fángshènde]
防滲地基 英文
impermeable base
  • : Ⅰ動詞(防鷥) provide against; defend against; guard against Ⅱ名詞1 (防守; 防禦) defence 2 (堤...
  • : 動詞(液體慢慢地透過或漏出) ooze; seep
  1. Scheme study of vertical cutoff wallused for dike on alluvial foundation

    沖積垂直方案研究
  2. The first power station of jinping mountain lies in the west section of the yanglongjiang river from santan to shoupagou gully, with a double - curved arch dam of 305 - meter height and a normal water storage of 1880metres. the exposed strata of the damsite are marbles and arenaceous rocks of triassic and solution fissures have been developed in the marbles of the left - bank ' s dam abutment, and they have become a stratum of strong leakage. as a result, it has been an important problem for the dam foundation to stop leakage

    錦屏一級電站位於西雅礱江的三灘至手爬溝河段,壩型為305米高雙曲拱壩,正常蓄水位標高1880米。壩址區出露的層為三疊系雜谷腦組二段大理巖和三疊系雜谷腦組三段的砂板巖。在勘探過程中,發現左岸壩肩大理巖體中的構造裂隙和溶蝕裂隙發育,且成為強層,為此壩成為重要問題。
  3. Construction ministry " housing project quality guarantees method " made lowest guarantee to housing project the regulation of deadline : among them 1, foundation foundation project and project of main body construction, to design the reasonable use fixed number of year of this project that the file sets ; 2, the waterproof project, toilet that has waterproof demand, room mixes the building outside of metope prevent leakage, for 5 years ; 3, heat addition and supply cold system, for 2 heating period, offer cold period ; 4, electric cop, to catchment conduit, equipment installation is 2 years ; 5, decorate a project to be 2 years

    建設部《房屋建築工程質量保修辦法》對房屋建築工程作了最低保修期限的規定:其中1 、礎工程和主體結構工程,為設計文件規定的該工程的合理使用年限; 2 、房屋水工程、有水要求的衛生間、房間和外墻面的漏,為5年; 3 、供熱與供冷系統,為2個採暖期、供冷期; 4 、電氣管線、給排水管道、設備安裝為2年; 5 、裝修工程為2年。
  4. The characteristic of chemical grouting material should combind with construstion method directed by the theories, it is necessity guarantee for the good result in some special cases. by cw series material, various complicated engineerings have been successfully handled, such as the treatment of concrete fine cracks in three gorges project ( tgp ), foundation reinforcement to the fault in in three gorges project ( tgp ), and the seepage control and reinforcement for the dam base of jiangya hydropower - station. these illustrations are provided to proof the advantages of modified epoxy resin and its technique

    化灌材料特性與理論指導下的灌漿工藝的全面結合是化灌處理,特別是特殊條件下灌漿效果的必要保證, cw系改性環氧化灌漿材及技術對多種復雜工況工程處理對象成功處理,解決了三峽混凝土微細水裂縫補強、三峽工程質斷層泥化夾層加固以及江埡電站壩溶蝕帶等一系列工程技術難題,印證了該材料及技術的先進性。
  5. The finite element analysis of 3d seepage field for surrounding rock mass of cavern groups of underground powerhouses was performed based on the nodal virtual flux method for solving the non - pressure seepage field and the improved drainage substructure technique for accurately simulating the complex seepage behaviors of densely distributed drainage holes, with emphasis placed on the seepage properties of the anti - seepage concrete curtain and drainage curtain in the anti - seepage and drainage system

    摘要在求解無壓流場結點虛流量法的礎上,結合可精細模擬密集排水孔復雜流水力行為的改進排水子結構技術,付某下廠房廠區洞室群圍巖區三維流場進行了有限元求解分析,著重研究了排水系統中的帷幕和排水幕的流特性。
  6. The test obsvervation include air temperature, ground temperature, foundation moisture, freeze depth, freeze capicity, freeze residual capicity, groundwater table and shape transform of canal lining, etc. throught systemic observation, analysis of impact about each factor on fundation freeze capicity, evaluate effect on anti freeze of various canal lining, comparison on technology and ecnomic of different method, a kind of main canal lining format is been recommended to engineering practice with siutable to ningxia local feature, fufilling the need of main canal safey i application, economic and practical, that is using polystyrene plate laying under concrete slate and grit taking replace of filling layer and optimizing design

    試驗觀測內容包括氣溫、溫、土含水量、凍深、凍脹量、凍脹剩餘量、下水位和砌體外觀變化等項目。通過系統的觀測,分析各因素對土凍脹量的影響,評價各種襯砌型式的凍西安理工大學工程碩士專業學位論文脹效果,並進行技術和經濟綜合分析比較,推薦出了適合我區特點、滿足乾渠安全運行、經濟實用、凍脹效果好的乾渠襯砌型式,即混凝土板下鋪設聚苯乙烯板和砂礫石換填層結構型式,加以優化設計,用於工程實踐。
  7. Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying, design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no. 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying, design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength, stability and thermal control problem for xi - luo - du project

    溪洛渡水電站超大型下洞室群圍巖穩定的安全可靠性分析:被成都勘測設計研究院應用於比選報告及可行性論證中; ( 2 )小關子水電站攔河閘壩及的應力應變分析:被成都勘測設計研究院應用於加固處理方案; ( 3 )三峽廠房7 # - 14 #壩段溫控並縫措施研究:為廠房壩段並縫方案的可行性提供了依據; ( 4 )堤工程體系的長期監控預報預警決策系統開發:為監控、預測預報堤漏管涌破壞提供分析軟體; ( 5 )向家壩下洞室群圍巖穩定的安全可靠性分析:被中南勘測設計研究院應用於初步設計方案中; ( 6 )靠船墩的疲勞可靠度研究:為廣東航運規劃設計院的靠船墩優化設計和加固提供依據; ( 7 )溪洛渡高拱壩壩體壩(壩肩)強度和穩定的三維靜動力隨機有限元分析及可靠度計算:為溪洛渡重大工程壩體的靜動力安全穩定性及溫控方案提供依據。
  8. This paper introduces foundation pit slope shoring method of soft foundation, control steps of settlement of surrounding structures, leakage - preventing technology of the adjacent lake and handle means of remain backwater

    摘要本文根據工程實例介紹了軟弱層的坑邊坡支護方法、止周邊建築物沉降變形的控制措施、鄰湖技術及殘留滯水的處理方法。
  9. In charge of one of major subjects of the national eighth five - year plan, i. e. " study on shotcreting techniques of polyacrylate emulsion cement mortar for impermeability coating of pu ding rcc dam ", the achievement of which has been appraised by the ministry of electric power and evaluated as reaching national leading level. 2. in charge of the major subject aided by the committee of national natural science funds, " study on durability of high bolumes of fly ash concrete ", the first phase achievement of which has been commended by the committee. 3. in charge of one of major subjects of the national ninth five - year plan, i. e. " study on high performance concrete in marine engineering, design and construction ". 4. acting as one of editors - in - chief of " technical specification for abrasion and cavities resistance of concrete in hydraulic structures ", which is issued by the ministry of water resources. 5. by providing the repairing and strengthening schemes on seepage and cracks of the basement of nanjing lukou international airport, the air traffic opening of the airport was ensured as scheduled. 6. consulting services on techniques of high performance and abrasion - erosion resistance concrete for three - gorges project, anti - corrosion of reinforced concrete strutures for the ore port of shanghai baoshan iron and steel works, mass fly ash concrete for jiangyin yangtze river bridge and pumping concrete for nanjing yangtze river second bridge

    主持國家「八五」攻關項目「普定碾壓混凝土壩上游面丙乳砂漿層大面積施工工藝研究」 ,成果通過部級鑒定,評價屬國內領先水平; 2 .主持國家自然科學金重大項目「高摻量粉煤灰混凝土的長期性能研究「 ,階段成果獲國家自然科學金委通報表彰與獎勵; 3 .主持國家「九五」攻關項目「海工高性能混凝土成套技術研究」 ; 4 .水利部「水工混凝土抗沖磨空蝕技術規范」的主編之一; 5 .為南京祿口國際機場下室修漏與裂縫補提出技術方案被采納並實施,為機場如期通航作出貢獻; 6 .為三峽工程抗沖磨高性能混凝土技術、上海寶鋼礦石碼頭鋼筋混凝土腐蝕技術、江陰長江大橋大體積粉煤灰混凝土技術、南京長江二橋泵送混凝土技術等提供咨詢建議。
  10. The stress - strain characteristic of two typical cfrd built on deep alluvium foundation is analyzed by using numerical method

    摘要對于深覆蓋層上的面板堆石壩,採用將趾板直接置於覆蓋層上的垂直方式是一種較為合適的設計方案。
  11. Combining achievements in past scientific research, this thesis summarizes some problems in the process of decreasing water, the problems contains : important parameters such as percolation coefficient, interfering radius etc ; designers get parameters from their experience and make their choice of limited prospecting materials too simply, because of the limits, designer ca n ' t make quantitative analysis on groundwater ; differences on breakwater effect of setting water - tight screen is still existed, although research evolvement in this field is done ; they ca n ' t grasp the hydrogeology parameters accurately in that it influences rightness of designing in deep excavation water - decreasing

    本文結合以往的研究成果,總結了降水過程中存在的一些問題,主要包括:重要設計參數,如透性、坑降水影響半徑等,設計中僅從個人經驗出發取值,對有限的勘探資料進行取捨和過分簡化。這些局限使設計者不能對下水進行科學的定量分析,盲目性較大;深坑降低承壓水引起的周邊面沉降的研究雖已取得很大的進展,但是一些主要問題仍未解決,對帷幕的實際擋水效果存在不同看法;對於弱透水層的水文質參數一直難以準確把握,影響了深坑降水設計的正確性。
  12. It has been proved that the design and construction organization presented in this thesis for the strata consolidation by means of high pressure shot grouting method be a success, and the design procedure and construction scheme can provide a guide for soft foundation treatment and waterproof in underground engineering

    實踐證明,高壓噴射注漿法層加固的設計和施工組織是成功的。本文提出的設計思路和施工組織方案對下工程軟處理和水止具有指導意義。
  13. Adopt raduce shock structure low noise, washingand dewatering pass stable. need not base, adope import seal washer. good to sealing up. it had feeding equipment. modelling beautiful, strong and durable

    設備採用力學震結構,噪音低,洗滌高脫過渡平穩,無需打。採用進口密封圈,無漏,有加料裝置,造型美觀。洗滌織物潔凈度高,去污徹底,不損衣物。
  14. Grouting technology, as one of common and important engineering measures, has been widely used in the reinforcement treatment and anti - seepage of the dam foundation

    摘要灌漿技術作為水工建築物處理中常用和重要的工程措施,在大壩壩和加固處理中得到廣泛的應用。
  15. According to the documentation collected from domestic and abroad wang wei dong who works in huadong architect and structure institute utilizes the similar work property between the underground continuous wall and pile subjected the vertical loads, and introduces poulos method of elasticity and plastic which applies to pile foundation into the calculation for subsidence of underground continuous wall. pujialiu and yu yuzhou from water and electronic engineering of qinghua university, according to the result of three axes, define the concrete parameter utilize the model of non - linear e - b combined with the design cross section of dam in xiaolangdi, yellow river accept the total stress programme of thepd dam, and we analyze the stress and displacement of plastic concrete diaphragm wall by finite element method in comparison with the result of common concrete one. at same time, we consider the effect of the character of plastic concrete diaphragm wall which is composed of different gradients and adopting the level of stress and pulling stress infers whether the plastic concrete diaphragm wall is safe or not

    下連續墻是一種歷史較短的施工方法,目前,砼墻的設計還是以傳統的設計方法為主,根據查找國內外文獻資料,華東建築設計院王衛東利用下連續墻與樁在豎向荷載作用下的工作性能有相似性,將適用於樁的poulos彈性理論引入對下連續墻的沉降計算中;清華大學水利水電工程系濮家騮、于玉貞根據三軸試驗結果確定混凝土的參數,利用非線性e - b模型,結合黃河小浪底土石壩設計剖面,採用thepd土石壩總應力程序,對深覆蓋層塑性混凝土墻的應力、位移進行有限元分析,並與普通混凝土墻計算結果加以對比,同時分析了不同配比塑性混凝土特性的影響,並採用應力水平和拉應力數值來判斷塑性混凝土墻的安全程度。
  16. In this project, the maximum height of the dam is 81m, but the deep overburden in the riverbed has the depth of 147. 95m which is about two times of the maximum height of the dam body, so the seepage and liquefaction prevention of the dam foundation becomes the key and important problem in the design of the dam project. the static stress and deformation under three different projects - horizontal blanket project, clay core project and asphalt core project - for the dam is analyzed comprehensively. the damage that may be induced by variable factors on the dam body in time of engineering completion and water impounding operation period is seriously studied

    其次,將這一模型用於分析下坂水利樞紐工程,由於該工程河床覆蓋層深度最深達147 . 95m ,是壩體高度的近兩倍左右,壩流和液化成為壩體安全主要問題,本文對該壩的三種設計方案即水平鋪層方案、粘土心墻方案及瀝青心墻方案的靜態應力位移及壩體在竣工期、蓄水期等各個階段可能產生的破壞進行了認真研究。
  17. The choice dam type is especial importance, during the designed research of the rock - fill dam, particular under the rock - fill dam with very deeply cover layer, the stress and strain of the middle wall and cutting interpenetration wall of the dam foundation is mostly sensitive, whether the. design of dam is scientific and reasonable, it is very important for cutting interpenetration and stability of the dam, the article offer the reference for the design of cutting interpenetration in the foundation with deep cover with earth the water conservancy in xiaban zone, based on the study and analysis the design of cutting seep in the foundation with deep cover with earth, cutting interpenetration concrete wall and the joining model of cutting interpenetration material in body of dam and the applying effect in the practical worko based on the foundation which absorbed and summarize the achievement of design and research in the inter and outer country, for the project of the clay vertical middle wall and vertical cutting interpenetration, the asphalt concrete vertical middle wall and vertical cutting interpenetration the clay inclined middle wall and the lever carpet layer cutting interpenetration, respectively in terms of the different stage of complete period sluice period and working condition, adopting nonlinear calculate and analysis with the finite element method ; carrying the analysis and study with the 3d finite element method as to the different joining model of the left bank high slope cutting interpenetration body and the foundation concert cutting interpenetration wall ; carrying the analysis and study with the 3d finite element method as to the effect of the wall stress and strain because of the different elasticity modulus of the concert cutting interpenetration wall through the analysis and study with the different project. have comparatively all - around comprehended the various model dam, particular the distribute rule of stress and strain of the cutting interpenetration system, provide for the important evidence of the plastic area size the join model of the foundation cutting interpenetrate wall and dam body cutting interpenetrate system the choice of the dam model and the design of the structure of the dam body, the result of research and advice have very importance value in design and building for the similarity project

    工程設計中,壩型的選取顯得尤為重要,特別對于壩有深厚覆蓋層的堆石壩,心墻和壩墻的應力和變形是壩體、壩最敏感的部位,設計方案是否安全、科學和合理,對大壩和穩定起到至觀重要的作用。本文研究分析了國內外深厚覆蓋層設計、壩混凝土墻與壩體體銜接形式及工程實際應用效果,為下坂水利樞紐工程深厚覆蓋層設計的方案選擇提供了參考;在吸收和歸納了國內外堆石壩的設計研究成果的礎上,對粘土心墻和壩垂直方案、瀝青混凝土心墻和壩垂直方案以及粘土斜心墻和壩水平鋪蓋方案,分別按竣工期和蓄水運行期的不同工作情況進行了有限元非線性計算分析;對左岸高陡邊坡的大壩體與礎混凝土墻的不同結合型式進行了三維有限元靜力計算分析和研究;對混凝土墻不同彈性模量對墻體應力和變位的影響進行了三維有限元靜力計算分析和研究。通過對不同方案的計算分析和研究,比較全面的了解了各方案壩體,尤其是體的應力和變形分佈規律,為壩型選擇、壩體結構設計、墻與壩體體的結合型式以及塑性區大小的確定提供了重要依據。
  18. On the basis of analyzing the features of commonly - occurred leak problem in exterior walls in coast area, seepage force of rainwater in exterior walls and comparison test results of permeability in exterior walls, the article proposes a basic principle of seepage prevention of exterior wall and introduces its use in newly - built residence and treatment for tough leak problem in exterior walls

    在分析沿海區建築外墻常見漏的特徵、外墻雨水透的動力以及外墻抗性能對比試驗結果的礎上,提出了外墻本原理,介紹了其在新建住宅外墻漏工程和外墻疑難漏問題治理工程中的應用。
  19. A solid - waste containment system can be simplified as a slope which contains a layer of geomembrane ( which is simplified as interlayer slope in the rest part ). shaking table model test and numerical analysis have been done to study the seismic stability of interlayer slope based on the two - part wedge theory in this paper. many factors which affect the slope stability ratio, including horizontal seismic coefficient, slope angle, soil - geomembrane interaction coefficient, slope length, layer thickness and soil character, have been took into consideration

    填埋場坑的邊坡可以簡化成含土工膜夾層的土坡(以下簡稱夾層土坡) ,本文根據「雙滑楔體」理論思想,對夾層土坡的震穩定性問題進行了較為系統的模型試驗和數值分析,著重考慮了水平震系數、夾層土坡坡角、土工膜與覆蓋層土體摩擦系數、夾層邊坡長度和厚度、夾層土坡覆蓋層土體性質等因素對土坡安全系數的影響,並對震作用下夾層土坡的永久變形進行了初步的研究,給出了對實際工程設計有參考價值的結論。
  20. For example, after the collapse of ditong dam in idaho, may 5, 1976, it was found that it was not impervious very well, the impervious curtain was built poorly. when the seepage went through the impervious curtain, the exit water from the pervious material of the downstream or the right side of dam through the foundation or certain line between the foundation and the dam caused contact scour and piping

    如美國愛得華州提堂壩於1976年5月5日潰決,事後調查分析,因壩透水性大,帷幕施工質量差,流穿透帷幕,經與壩的接觸面從壩體下游側透水料區逸出或從右壩肩繞經下游壩體逸出,出逸的水流引起了接觸沖刷和管涌,導致潰壩。
分享友人