防滲工藝 的英文怎麼說

中文拼音 [fángshèngōng]
防滲工藝 英文
barrier technology
  • : Ⅰ動詞(防鷥) provide against; defend against; guard against Ⅱ名詞1 (防守; 防禦) defence 2 (堤...
  • : 動詞(液體慢慢地透過或漏出) ooze; seep
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : Ⅰ名詞1 (技能; 技術) skill 2 (藝術) art 3 [書面語] (準則) norm; standard; criterion4 [書面語...
  1. By improving foundry method, controlling composition, choosing appropriate inoculant and using te - coating, the shrinkage defect could be reduce effectively

    通過改進鑄造、控制鐵液成分、選擇合適的孕育劑、使用碲塗料等綜合控制手段,能有效降低縮松缺陷率,止缸蓋的漏現象。
  2. Technical features, main requirements and process flow of sleeve valve barrel grouting method are described with the field cases of the method in grouting injection reinforcement, permeability proof and leakage treatment in china

    介紹了袖閥管注漿法的特點、主要技術要求和施流程,以及該方法在國內注漿加固、、堵漏施中的應用實例。
  3. Abstract : technical features, main requirements and process flow of sleeve valve barrel grouting method are described with the field cases of the method in grouting injection reinforcement, permeability proof and leakage treatment in china

    文摘:介紹了袖閥管注漿法的特點、主要技術要求和施流程,以及該方法在國內注漿加固、、堵漏施中的應用實例。
  4. The characteristic of chemical grouting material should combind with construstion method directed by the theories, it is necessity guarantee for the good result in some special cases. by cw series material, various complicated engineerings have been successfully handled, such as the treatment of concrete fine cracks in three gorges project ( tgp ), foundation reinforcement to the fault in in three gorges project ( tgp ), and the seepage control and reinforcement for the dam base of jiangya hydropower - station. these illustrations are provided to proof the advantages of modified epoxy resin and its technique

    化灌材料特性與理論指導下的灌漿的全面結合是化灌處理,特別是特殊條件下灌漿效果的必要保證, cw系改性環氧化灌漿材及技術對多種復雜程處理對象成功處理,解決了三峽混凝土微細水裂縫補強、三峽程地質斷層泥化夾層加固以及江埡電站壩基溶蝕帶等一系列程技術難題,印證了該材料及技術的先進性。
  5. In this paper, the effects of process parameter of brush copperplating on the copper film for prevention of carburization were studied ; the relation between the time of carburization and the minimun thickness of copper film for prevention of carburization was established

    研究了用刷鍍鍍銅碳時的參數對鍍層碳效果的影響,及碳時間與碳所需的最小鍍層厚度之間的關系。
  6. The process and equipment for the production of pvc calendering products were introduced as well as the applicaiton of pvc calendering products in food storage film, fogging - resistance greenhouse film, spraying advertising cloth, water bed film, leakage - proof geomembrane, packaging film, floor leather, artificial leather, kang covering leather and antibacterial plastic products

    介紹了pvc壓延製品生產及設備及其在糧食儲藏膜、無滴大棚膜、噴繪廣告布、水床膜、膜、包裝膜、地板革、人造革、炕布革、塑料抗菌製品等方面的應用。
  7. In this paper, for the bonding between the sling screw - thread - based and composite hull based on the underwater weapon composite, the bonding structure design, process design and leakproof technology between the load - bearing metal parts and composite hull are studied. with the further investigation on tensile test of the sling screw - thread - based the common technology of bonding between load - bearing metal parts and composite hull is obtained, which establishes the experiment and theory base for the technology of underwater and deepwater weapon in china

    本文以水下兵器為背景,以某型號雷體吊耳螺紋座與復合材料殼體的膠接為研究對象,著重進行了金屬承力件與復合材料殼體的膠接結構設計、設計、膠接技術的研究,並進行吊耳螺紋座拉力試驗研究,最終獲取了水下兵器用金屬承力件與復合材料殼體連接形式的共性技術。
  8. In charge of one of major subjects of the national eighth five - year plan, i. e. " study on shotcreting techniques of polyacrylate emulsion cement mortar for impermeability coating of pu ding rcc dam ", the achievement of which has been appraised by the ministry of electric power and evaluated as reaching national leading level. 2. in charge of the major subject aided by the committee of national natural science funds, " study on durability of high bolumes of fly ash concrete ", the first phase achievement of which has been commended by the committee. 3. in charge of one of major subjects of the national ninth five - year plan, i. e. " study on high performance concrete in marine engineering, design and construction ". 4. acting as one of editors - in - chief of " technical specification for abrasion and cavities resistance of concrete in hydraulic structures ", which is issued by the ministry of water resources. 5. by providing the repairing and strengthening schemes on seepage and cracks of the basement of nanjing lukou international airport, the air traffic opening of the airport was ensured as scheduled. 6. consulting services on techniques of high performance and abrasion - erosion resistance concrete for three - gorges project, anti - corrosion of reinforced concrete strutures for the ore port of shanghai baoshan iron and steel works, mass fly ash concrete for jiangyin yangtze river bridge and pumping concrete for nanjing yangtze river second bridge

    主持國家「八五」攻關項目「普定碾壓混凝土壩上游面丙乳砂漿層大面積施研究」 ,成果通過部級鑒定,評價屬國內領先水平; 2 .主持國家自然科學基金重大項目「高摻量粉煤灰混凝土的長期性能研究「 ,階段成果獲國家自然科學基金委通報表彰與獎勵; 3 .主持國家「九五」攻關項目「海高性能混凝土成套技術研究」 ; 4 .水利部「水混凝土抗沖磨空蝕技術規范」的主編之一; 5 .為南京祿口國際機場地下室修漏與裂縫補提出技術方案被采納並實施,為機場如期通航作出貢獻; 6 .為三峽程抗沖磨高性能混凝土技術、上海寶鋼礦石碼頭鋼筋混凝土腐蝕技術、江陰長江大橋大體積粉煤灰混凝土技術、南京長江二橋泵送混凝土技術等提供咨詢建議。
  9. The construction techniques and mechanics are approaching or even reaching the international advanced level in the asphalt concrete impervious deck of the recent completed tianhuangping pumped - storage hydroplant and the counter dam in the yangtze river which is being built with the height of 104 m, the volume of asphalt concrete core of 5x104m3

    最近建成的天荒坪抽水蓄能電站上庫瀝青混凝土面板和正在建設的壩高104m 、瀝青混凝土心墻方量達5萬多m ~ 3的長江三峽水利樞紐茅坪溪護壩程,施和施機械化程度已達到或接近國際先進水平。
  10. Abstract : the construction process and construction scheme and quality of impermeable concrete wall of jiepai pivotal engineering is briefly introduced. the specific steps are put forward for the construction questions

    文摘:簡要介紹了界牌樞紐砼墻施、方案和質量情況,並針對程施中遇到的問題,提出了具體措施
  11. Attentions have to be paid to coating ingredient, smearing, sand filling and compaction for metal seeping defect prevention

    闡明了為金屬缺陷,在塗料配製、塗掛、加砂緊實中應注意的問題和具體
  12. During the construction of concrete cut - off wall of the auxiliary dam in huangbizhuang reservoir, in the section with complex geographical condition, especially the closure section of concrete cut - off wall ( about 120m ), the deterioration of the underground water ' s flow state and the existence of the overseep channel in the stratum result in the several collapses in the dam crest. through the analysis of ever } 1 collapse ' s reason, the proposal of handling measure and its effect, the paper expounds and proves that the cut - off wall can be safely constructed and devoted into normal usage after dealing with collapse. the psper improves the construction technique and method of concrete cut - off wall especially under complex geological condition and in the overseep stratum

    本文通過對歷次塌坑的原因分析及歷次塌坑處理措施的提出和對歷次塌坑處理效果的分析,論證了塌坑處理後墻能安全施和投入正常運用;完善了在復雜地質條件及強漏地層混凝土墻的施和施方法;提出了對病險水庫加固及在地質條件復雜地層中修建混凝土墻的施要點;同時提出了在強漏地層修建墻的關鍵是在墻施前通過預注漿封閉強漏通道的重要論點;對塌坑一些處理措施中的不足之處亦進行了分析研究,供國內類似程借鑒。
  13. Brief introduction of double layer seepage control technology in new type for refuse landfill site

    垃圾填埋場新型雙層簡介
  14. Abstract : the paper describes red clay seepage prevention technique in karst zone, focusing on physical and mechanical properties of red clay, principle of seepage prevention, construction technology, quality control and result of application

    文摘:介紹在喀斯特地區紅粘土人技術,主要介紹紅粘土物理力學性能、原理、施、質量控制及應用效果。
  15. As the waterproof technology with high work efficiency, threefold high - pressure jet grouting plays a vital role in the water - proof and seepage - proof project of deep foundation pits

    摘要三重管高壓噴射注漿作為一種效很高的隔水,在深基坑隔水程中發揮著重要作用。
  16. The leakage - proof ringy cement wall and its function and woring mechanism are introduced. and its technological characteristics and economy are analyzed

    摘要系統地介紹了環式水泥土墻及其作用機理,著重介紹了環式水泥土墻的特點,並對其特點、經濟性進行了闡述和分析。
  17. Pile foundation and continuous wall foundation are widely used in coastal regions, where the character of local soil is always very weak. with the development of design method and the advancement of constructing technology, many new types of pile and continuous wall are applied, like the thin - wall hollow pile and the multi - function continuous wall, which can be used not only as temporary fencing structure, but also as permanent loading structures

    軟土地區常見的地下基礎型式有樁基礎和地下連續墻,近年來隨著設計理論和施設備的發展,樁基礎及地下連續墻基礎的型式都有了很大的發展,如薄壁筒樁、集擋土、及承重多功能於一體的地下連續墻等。
分享友人