防滲設施 的英文怎麼說

中文拼音 [fángshènshèshī]
防滲設施 英文
seepage control facility
  • : Ⅰ動詞(防鷥) provide against; defend against; guard against Ⅱ名詞1 (防守; 防禦) defence 2 (堤...
  • : 動詞(液體慢慢地透過或漏出) ooze; seep
  • : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • 設施 : installation; facilities
  1. Abstract : this paper introduces the scheme, deep cut of foundation pit to bury pipe, which is adopted for wenjiayan seawall in qiantang rever. compared with the scheme of withstanding pipe, this scheme has the advantage of saving investment, simple construction and time + - saving. it is convenient to check the anti - seep installation between water pipe and seawall

    文摘:本文通過錢塘江聞家堰海塘深基坑開挖埋管,替代原計頂管方案,具有工程投資省、工簡單、工期短,且便於檢查取水管與海塘之間
  2. A brief introduction is given to the treatment of the zeya dam foundation, principles of seepage control and design of the concrete face rockfill dam of the zeya reservoir. as for the excavation of the sand - gravel zones, except the toe slab and its 1 / 9 bottom width down stream, the alluvial layers are excavated to the micro - weathered rocks, while the other sections remain unexcavated. regarding to the treatment of the fracture zones, concrete filling is used for the toe slabs and semi - permeable materials are used for other section. according to the construction characteristics, a filter is placed in the down stream embankment foot. to improve the integrity of the dam foundation and anti - seepage capability consolidation grouting and curtain grouting are adopted. as a result safety, economic benefit, convenience in construction and good performace are achieved

    簡要論述澤雅水庫面板堆石壩壩基處理和的原則及計要點.趾板基礎和堆石體各區砂礫石基礎開挖,除趾板與其下游1 / 9底寬范圍以及壩腳挖除沖積層至弱風化(局部微風化)基巖外,其餘部分均予以保留.斷層破碎帶處理,趾板部位採用混凝土塞,其它部位採用半透水料置換,並根據本工程特點在下游壩腳加了反濾層.為提高壩基的整體性和性能,對趾板進行了固結和帷幕灌漿.達到了安全、經濟、便於工的目的,運行情況良好,可為面板堆石壩的計和研究提供參考與借鑒
  3. Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying, design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no. 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying, design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength, stability and thermal control problem for xi - luo - du project

    溪洛渡水電站超大型地下洞室群圍巖穩定的安全可靠性分析:被成都勘測計研究院應用於比選報告及可行性論證中; ( 2 )小關子水電站攔河閘壩及地基的應力應變分析:被成都勘測計研究院應用於地基加固處理方案; ( 3 )三峽廠房7 # - 14 #壩段溫控並縫措研究:為廠房壩段並縫方案的可行性提供了依據; ( 4 )堤工程體系的長期監控預報預警決策系統開發:為監控、預測預報堤漏管涌破壞提供分析軟體; ( 5 )向家壩地下洞室群圍巖穩定的安全可靠性分析:被中南勘測計研究院應用於初步計方案中; ( 6 )靠船墩的疲勞可靠度研究:為廣東航運規劃計院的靠船墩優化計和加固提供依據; ( 7 )溪洛渡高拱壩壩體壩基(壩肩)強度和穩定的三維靜動力隨機有限元分析及可靠度計算:為溪洛渡重大工程壩體的靜動力安全穩定性及溫控方案提供依據。
  4. Design and construction of dam foundation impervious curtain grouting for dachaoshan hydropower station

    大朝山水電站大壩基礎帷幕灌漿計與
  5. The government is making plans to upgrade the sewerage network and the treatment works in silver mine bay. in addition, the epd has been continuing its role of monitoring and controlling the effectiveness of septic tanks and soakaway pits, making sure that residents know their responsibilities when it comes to maintaining efficient working sewage systems and repairing leakages

    政府現已手計劃提升銀礦灣的污水收集網路及污水處理,環保署則一直緊密監控化糞池和水井的運作情況,並促使居民履行自身的責任,維持污水處理系統有效地運作,止泳灘污染。
  6. During the construction of the dam foundation cut - off for dalong water control project, the construction techniques adaptable to the construction under the condition with high interference, short construction period and strict quality standard are selected through the related productive experiment, with which the problems such as the prevention and treatment of hole collapse and lowering steel reinforcement cage and pre - embedded grouting pipe into place are solved, and then the successful construction of the cut - off is guaranteed as well

    摘要在大隆水利樞紐壩基工過程中,通過生產性試驗選擇出了適合該墻工程工干擾大、工期緊、質量標準高的要求的工技術,解決好了孔口塌孔的預、處理及鋼筋籠和預理灌漿管下等技術難題,保證了該墻工程的成功建
  7. In view of its characteristic, uses inspires crushing sand, erosion control seepage control continuous wall, erosion - resisting flexibility geotechnical engineering ge - bin - shi - long and so on synthesis processing measures to carry on the design

    針對其特點,採用振沖擠密砂石樁、沖連續墻、抗沖柔性土工布金屬網路石籠等結合處理措進行計。
  8. The construction techniques and mechanics are approaching or even reaching the international advanced level in the asphalt concrete impervious deck of the recent completed tianhuangping pumped - storage hydroplant and the counter dam in the yangtze river which is being built with the height of 104 m, the volume of asphalt concrete core of 5x104m3

    最近建成的天荒坪抽水蓄能電站上庫瀝青混凝土面板和正在建的壩高104m 、瀝青混凝土心墻方量達5萬多m ~ 3的長江三峽水利樞紐茅坪溪護壩工程,工工藝和工機械化程度已達到或接近國際先進水平。
  9. According to the documentation collected from domestic and abroad wang wei dong who works in huadong architect and structure institute utilizes the similar work property between the underground continuous wall and pile subjected the vertical loads, and introduces poulos method of elasticity and plastic which applies to pile foundation into the calculation for subsidence of underground continuous wall. pujialiu and yu yuzhou from water and electronic engineering of qinghua university, according to the result of three axes, define the concrete parameter utilize the model of non - linear e - b combined with the design cross section of dam in xiaolangdi, yellow river accept the total stress programme of thepd dam, and we analyze the stress and displacement of plastic concrete diaphragm wall by finite element method in comparison with the result of common concrete one. at same time, we consider the effect of the character of plastic concrete diaphragm wall which is composed of different gradients and adopting the level of stress and pulling stress infers whether the plastic concrete diaphragm wall is safe or not

    地下連續墻是一種歷史較短的工方法,目前,砼墻的計還是以傳統的計方法為主,根據查找國內外文獻資料,華東建築計院王衛東利用地下連續墻與樁在豎向荷載作用下的工作性能有相似性,將適用於樁基的poulos彈性理論引入對地下連續墻的沉降計算中;清華大學水利水電工程系濮家騮、于玉貞根據三軸試驗結果確定混凝土的參數,利用非線性e - b模型,結合黃河小浪底土石壩計剖面,採用thepd土石壩總應力程序,對深覆蓋層塑性混凝土墻的應力、位移進行有限元分析,並與普通混凝土墻計算結果加以對比,同時分析了不同配比塑性混凝土特性的影響,並採用應力水平和拉應力數值來判斷塑性混凝土墻的安全程度。
  10. During the course of stress calculation, the concrete watertight wall and the soil around are supposed to be linear elastic material, the onsolidation of dam is supposed to be completed before the watertight wall is constructed, the contact element is adopted to simulate the interface between the dam and watertight wall, and the completed before the watertight wall is constructed, the contact element is adopted to simulate the interface between the dam and watertight wall, and the influence towards the stress of watertight wall when water elevation changes is calculated by fem

    應力計算時將砼墻及周圍土體假成線彈性材料,假工時壩體固結已經完成,用接觸單元模擬壩體和墻之間的接觸面,利用有限元計算出水位變化對墻應力的影響。
  11. Thirdly, because the depth of the seepage prevention wall of xia ban di dam project has the value of 85m which is the maximum depth in the dam projects in our country, the stress state of the seepage prevention wall is very complicated, the influence of nine modulus for nine kinds of seepage prevention wall material on the stress and displacement of the seepage prevention wall is studied and the rule of the change of stress and displacement with the change of characteristic parameters for seepage prevention wall under time of engineering completion and water impounding operation period is given in this paper

    第三,鑒于大壩基礎混凝土墻深度達85m ,厚度僅為1 . 0m ,規模和工程難度為國內之最,墻體應力比較復雜,本文研究了大壩工填築竣工期、水庫蓄水運行期墻的應力和變形隨墻體參數的變化而變化的規律,為大壩安全計及墻墻體材料的選擇提供了理論依據。
  12. As the underground drainage facilities are ageing gradually, whether the government has plans to replace or renovate the drains to prevent accidents caused by pipe leakage or burst, which endanger the safety of the public ; and

    鑒于本港地下排水管道日漸老化,政府有沒有計劃更換或翻新該等管道,以預因管道漏或爆裂而造成意外,危害市民安全及
  13. ( 4 ) one row seepage wall, which is formed by sprinkling grouting method, is used to the xiacouba reservoir project for cutting off the way of seepage on the basis of the project condition and grouting test. the results testified that a sound effectiveness of preventing seepage could be attained by the application of the high - pressure sprinkling grouting technology if design paramenter is proper and the construction quality is controlled strictly

    根據工程要求、 _仁質條件及灌漿試驗,本工程選用單排旋噴套接的方式形成墻,實踐證明,只要計參數合理,工過程嚴格控制,利用高壓噴射灌漿技術可達到、堵漏的目的。
  14. Development and applications of impervious asphalt concrete for embankment dams

    梁輝水庫壩基混凝土墻的
  15. During the construction of the dam for dalong water control project, the anti - seepage earth materials for the main dam filling are from three borrow areas in the original design

    摘要在大隆水利樞紐大壩工中,原計主壩土來源為卡巴、壩上、叢毛三大料場。
  16. However, the thickness of the sealing coat is hard to be controlled, as the result, slumping of the asphalt mastic will occur under high temperature

    結合南谷洞水庫大壩瀝青混凝土面板的工,提出並實了冷鋪的瀝青封閉層,效果良好。
  17. Hydraulic structures, velometers, weirs, and flumes are used to gauge water in many irrigation districts. the fundamental principles and suitable conditions of these water metering methods are introduced in this paper. the main problems in the development of water metering instruments and facilities as well as main causes of difficulty in popularization of the methods in irrigation districts are analysed. it is suggested that selection and construction of water metering facilities should be combined with canal lining in irrigation districts. it is also pointed out that for realization of automation of water metering it is necessary to develop and popularize portable and stationary water metering instruments step by step based on economic development levels in irrigation districts

    介紹利用水工建築物、流速儀、堰、槽進行量水的基本原理及各自適用條件.從量水儀器、的性能、價格及灌區經濟發展水平等方面,分析目前在灌區量水儀器、的開發研製方面存在的主要問題,以及灌區量水難以普及的主要原因.提出應結合灌區渠道工程建,合理選擇和建量水,並根據灌區經濟發展水平,分步驟研製和推廣便攜式或固定式量水儀器,最終實現灌區量水自動化的灌區量水實方案
  18. The difficulties of this problem are as follows : there is a grate discrepancy of geology condition of dike in middle - lower reaches of yangtze river, the facts which affect groundwater power field and water chemistry field not only include geologic structure of dike, topography and river network, precipitation infiltration and evaporation condition, but also are closely related to the design scheme of impermeable wall, construction method and construction quality

    本課題研究的難點在於長江中下游堤基工程地質條件差異較大,影響地下水動力場、水化學場的因素不僅與堤基地質結構、地形與河網分佈、降水入及蒸發條件,而且與墻的計方案、工工法及工質量等密切相關。
  19. Pile foundation and continuous wall foundation are widely used in coastal regions, where the character of local soil is always very weak. with the development of design method and the advancement of constructing technology, many new types of pile and continuous wall are applied, like the thin - wall hollow pile and the multi - function continuous wall, which can be used not only as temporary fencing structure, but also as permanent loading structures

    軟土地區常見的地下基礎型式有樁基礎和地下連續墻,近年來隨著計理論和工工藝備的發展,樁基礎及地下連續墻基礎的型式都有了很大的發展,如薄壁筒樁、集擋土、及承重多功能於一體的地下連續墻等。
  20. Fire resistance tests for service installations - penetration seals

    服務火試驗.透密封件
分享友人