降階解析度 的英文怎麼說

中文拼音 [jiàngjiējiě]
降階解析度 英文
degrading resolution
  • : 降動詞1. (投降) surrender; capitulate 2. (降伏) subdue; vanquish; tame
  • : 名詞1. (臺階) steps; stairs 2. (等級) rank 3. [醫學] (耳蝸的三個螺旋管的任一個) scala 4. [數學] order 5. [地質學] stage
  • : 解動詞(解送) send under guard
  • : Ⅰ動詞1. (分開; 散開) divide; separate 2. (分析) analyse; dissect; resolve Ⅱ名詞(姓氏) a surname
  • : 度動詞[書面語] (推測; 估計) surmise; estimate
  • 解析度 : degree of resolution
  • 解析 : analysis; resolution; analyzing; resolving解析幾何 [數學] analytic geometry; cartesian geometry; ...
  1. Based on the multi - scale representation theory, we present a reduced order model for the solving of the inverse problem. also the relative error covariance matrix is used to analyze the performance of models with different orders ; 4

    基於小波多尺表示理論給出逆問題求的多尺模型,同時用相對誤差協方差矩陣對數不同的模型的估計精進行分; 4
  2. But in the process of lessening the decoupling degree, the ranks of equivalent controlled channels will be augmented. thus, the reduced model is exploited in decoupling process in order to resume the plant prosperity which are distorded. it has greatly lessen the difficulty in group decoupling

    本文結合生產實踐,在分系統耦合的基礎上,利用分組耦來弱化系統的耦合,並利用模型方法簡化耦網路模型,較好地決在逐次弱化過程中使耦后的等效控制通道的次增大的問題。
  3. In this article, the author study the short - term optimization dispatching of cascaded hydropower in order to get a practicable mathematical model and arithmetic. basing on deep analysis and generalization of yilihe cascaded reservoir, the author set up a short - term dispatching mathematical model and an inner - plant economical operation model to simulate the real operation process. dynamic programming method ( dp ) is effective to solve the several problem and discrete differential dp ( dddp ) is a reduce dimension tool

    本文緊密結合雲南省境內的以禮河梯級水庫的工程實際,在對其進行深入分和概化的基礎上,建立了反映實際問題特點的梯級電站短期調模型和廠內經濟運行模型,動態規劃方法以其擅長求段決策過程問題而被本文選為優化工具,由於dddp的維效果顯著,從而使動態規劃在本研究模型中得以運用。
  4. Power bond graph is used to established the bond graph model of the lifting and dropping of hydraulic pile hammer and state space equation in the paper for hydraulic pile hammer is perplexing nonlinear system. in order to attain the graph that pressure, position, velocity, acceleration vary with time in the course of driving pile simulation procedure solving state space equation is designed on the basis of combining four - order runge - kutta method with predicator - corrector method, dynamic simulation of the hydraulic system is studied in matlab 6. 5. it is convenient to analyse dynamic characteristics of the hydraulic syste m, beneficial to the design and parameter optimization of the hydraulic system. in the final part of the paper, under detailed analysis of the control characteristics for double - acting hydraulic pile hammer with double cylinders, control system based on the programmable logic controllers founded on technology of modern compute is designed

    由於液壓打樁錘液壓系統是一個復雜的非線性系統,本文採用功率鍵合圖法建立液壓打樁錘上行、下的鍵合圖模型和狀態空間方程,通過四龍格?庫塔法和預估?校正法相結合編制了模擬程序對狀態空間方程求,在matlab6 . 5中進行液壓系統的動態模擬,獲得液壓打樁錘運動過程中壓力、位移、速、加速等隨時間變化的曲線圖。此曲線圖方便了對液壓系統動態特性分,為液壓系統的設計和參數優化提供了有益的借鑒。最後,在深入分雙缸雙作用液壓打樁錘控制系統的功能要求后,採用了以現代計算機技術為基礎的新型工業控制裝置? plc可編程式控制制器,設計出了雙缸雙作用液壓打樁錘的電器控制系統。
  5. Because of lack of abstraction at the stage of requirement analysis, the traditional management information systems of engineering designing project are not suitable to dynamic recomposition of business management process. this paper will combine workflow technologies with management workflow system of engineering designing project ( edwfms ). by decomposing work into good - definitioned tasks and roles and executing and monitoring them according to rules and processes, we can boost efficiency, reduce cost, enhance level of business management of engineering design department

    傳統的工程設計項目管理信息系統在需求分段缺乏高的抽象性,使得最終的需求模型無法適應管理業務流程的動態重組,本文將結合正在研發的工程設計項目管理信息系統集成工作流技術,將業務處理工作分成定義良好的任務和角色,並按照一定的規則和過程予以執行和監控,達到提高辦事效率,低生產成本,改善工程設計單位生產經營管理水平和競爭力的目標。
  6. The construction process includes pre - construction preparation, designing management, construction bidding management, project investment management, contract management, quality and process control, files management, completed project transfer, etc. through the analysis of the whole construction process, it finds out the key problems that affect construction and the way to solve it. furthermore, the thesis proposes to optimize the design of the construction organization that insures the quality and reduces costs

    通過對燃氣工程的建設前期準備、設計段管理、施工招標管理、項目投資控制、合同管理、質量和進控制、檔案管理、竣工工程的移交等全過程的分和論述,找出影響燃氣工程建設的關鍵問題、應注意的問題,並在建設過程中有準備、有目的地去著重決,特別提出優化施工組織設計來保證工程質量、控制和低建設成本。
  7. In view of load transferring capability of rock - socketed piles, this paper compares rock - socketed piles with non - rock - socketed piles, analyzes influencing factors ( pilelengtru pile diameter pilemodulusx character of bearing stratuiru mud hull sediment of pile bottom and roughness ) on force character. with different load transferring functions, a set of analytical equation for single pile settlement calculation of rock - socketed piles are established : three stages of p - s curve from analytical equation are gained which are straight linex curve x straight line ; and relationship curves in different pile modulus and in different rock - socketed length

    根據所選用的不同的荷載傳遞函數,導出了嵌巖樁單樁沉計算的一種演算法,分得出嵌巖樁p ? s曲線按荷載變化分為直線?曲線?直線段三個段,不同樁身模量下承載力的變化曲線,樁身模量、樁端巖石強是影響單樁承載力的重要因素,不同嵌巖深下端阻比的變化曲線。
分享友人