限定成分 的英文怎麼說

中文拼音 [xiàndìngchéngfēn]
限定成分 英文
finite
  • : Ⅰ名詞(指定的范圍; 限度) limit; bounds Ⅱ動詞(指定范圍, 不許超過) set a limit; limit; restrict
  • : Ⅰ形容詞1 (平靜; 穩定) calm; stable 2 (已經確定的; 不改變的) fixed; settled; established Ⅱ動詞...
  • : Ⅰ動詞1 (完成; 成功) accomplish; succeed 2 (成為; 變為) become; turn into 3 (成全) help comp...
  • : 分Ⅰ名詞1. (成分) component 2. (職責和權利的限度) what is within one's duty or rights Ⅱ同 「份」Ⅲ動詞[書面語] (料想) judge
  • 限定 : prescribe [set] a limit to; limit; restrict; determine; define; qualify
  1. Fist of all, on the basis of the research of agone boffins, this author investigates the interaction mechanism of bolts and rock, and introduces the elastic ? lastic analytical resolution which is consist of the liner structure, the equivalent reinforced wall rock and the original wall rock in the simple loading from the equivalent well - proportioned view ; this solution is very important meaning for the engineering design. on the basis of coulomb friction model, the author introduces the finite element equation of the contact problem in order to provide the academic foundation for the application of msc. marc. finally, combining the engineering practice of the non - linear analysis of shield tunnel through yellow river of the south - north water transfer and using the model of friction, the author researched the evolution law of stress and displacement field in the structure of grouted rock bolts, and analyzed the effect to the stress and deformation of surrounding rock mass due to anchor supports

    首先,在前人研究果的基礎上,對錨桿與圍巖的相互作用機理進行研究,利用全長錨固錨桿的中性點理論,從等效均化的角度來考慮錨桿對圍巖的加固作用,並推導了在簡單荷載作用下,含有襯砌、等效加固后的圍巖、原始圍巖三者的彈塑性解析解,對工程設計有著重要的參考意義;在數值模擬方面,以考慮錨固圍巖滿足規則化庫侖摩擦模型為基礎,利用虛功原理推導了接觸問題的有元方程的計算格式,為開發運用大型商用有元軟體msc . marc提供了理論根據,也形了本文的理論基礎:最後,論文以南水北調東線穿黃隧洞穩析項目為工程實例,利用本文所述的接觸問題的摩擦模型理論,對錨桿支護結構的應力場、位移場的變化規律進行了研究,析了加錨支護對隧洞圍巖應力、變形的影響。
  2. Normally a sentence consists of at least a subject and its predicate which contains a finite verb or a verb phrase

    句子通常由主語和謂語兩大部。謂語通常由動詞或動詞詞組構
  3. The software ansys6. 0 is used to analysis the stability of the state after construction of tongwamen bridge, linear method is used in analyzing the finite element model of the bridge, the coeffient of stability of different state after construction is given. on the basis, the effect of different factors such as the arrangement of lateral brace, the sloping angle of arch ribs, the stiffness of bridge deck system, the effect of non - orientedly conservative loadings of the hanger and tie bar etc is discussed. the different coefficients of stability of changing these factors are given, so the factors that are vital to the lateral stability of x - type arches are found, and the rationality of the methods taken to enhance the lateral stability of tongwamen bridge is evaluated

    本文應用有析商業軟體ansys6 . 0 ,採用線彈性方法,通過對該橋的空間有元模型進行穩析,得出其橋運營階段各種工況下的穩安全系數。在此基礎上,本文還通過有元模型析,就拱的矢跨比、吊桿(立柱)的非保向力效應、橋面系的剛度、橫撐布置形式、拱肋側傾角等因素對該橋整體穩性的影響展開探討與研究。文中給出了各因素變化情況下的穩安全系數,指出了對鋼管混凝土提籃拱橫向穩性有顯著影響的因素及其合理變化范圍,並對銅瓦門大橋提高橫向穩性的措施的經濟合理性進行了析。
  4. The editing system interface of media asset management system integrates the user authority identification, the module of downloading and uploading, the selection of programs and advertisements, the configuration of transferring data information, the display of downloading stuff information, the restriction of system requirement, audio formats ’ selectivity conversion and other functions

    媒體資產管理系統的編輯系統介面里,集了用戶權識別、導入導出模塊、節目廣告選、上傳素材信息設置、下載素材信息顯示、系統要求、音頻格式可選擇性轉換等功能。
  5. In the integrated scheduling service, hard periodic tasks are scheduled off - line to meet their real - time requirements, and each soft aperiodic task request is assigned a suitable deadline to enhance the aperiodic responsiveness. scheduling guarantees of hard periodic tasks are preserved through the on - line schedulability analysis. the sharing of critical section resources between the tasks is also considered in the integrated scheduling service ' s schedulability analysis, and bounded blocking for accessing the critical section resource is achieved by introducing the priority ceiling protocol

    在該模型中,對硬實時周期性任務集進行離線調度以滿足其可調度性保證:給動態到達的軟實時非周期性任務配一個截止期,提高其響應性能,同時通過在線可調度性析保證周期性任務的可調度性不受影響;集調度服務模型在可調度性析中還考慮了任務之間共享臨界區資源的情況,採用優先級上協議對訪問臨界區引起的阻塞進行了析。
  6. The rule of balancing out increase and decrease, being available in both abstract and concrete damages for breach of contract, is applied when the following are satisfied, ( 1 ) there stands a debt of damage for breach of contract, ( 2 ) the aggrieved party gains some profits, and ( 3 ) there is cause and effect relationship between breach of contract and the profits

    損益相抵規則、過失相抵規則、減損規則,是違約方損害賠償的重要的規則,對這三種規則,這一部主要論述了其內涵、適用條件。損益相抵規則的適用條件有三,一是違約損害賠償之債已經立,二是受害方受有利益,三是違約行為和利益之間具有因果關系;損益相抵專屬于損害賠償問題,在抽象損害賠償和具體損害賠償中都有其適用。
  7. Therefore, the main subject of this research is to discuss the application of all - around cost management through the full process control, which consists of three parts : feed - forward control, which seeks to anticipate the cost movement ; process control which sets down cost standards and cost planning in order to limit the cost payout

    因此本文主要是通過本的全過程式控制制來論述全面本管理的實際應用,其主要內容包括三個部:前饋控制旨在預測本變動的方向;過程式控制制通過制本標準和本計劃,本的支出;反饋控制通過析實際本與本計劃的差異,析和調查原因,以找到降低本的方法。
  8. This thesis regard internal property reorganization in the group of pangang as the research object, from chengdu seamless steel pipe limited liability company with chengdu iron and steel works inside exterior environment reorganizing in front and back commences, making use of to exceed the makel - bot with of five factors competition models and the method of factors analysis, after analyzing the reorganization of the business enterprise a profession for facing competes the situation. develop the development the business enterprise with the profession industry from the international local profession rival circumstance after analyzing the reorganization should the market position of the establishment with develop the strategy target. make use of the swot the analysis the method, to after the reorganization the development strategy of the business enterprise, from manage the angle proceeded the fixed position analyzes, for after the reorganization business enterprise development provided four kinds of developments strategy that eligibility choose : the brave development strategy, request the resources advantage, funds advantage, human resource advantage, technique advantage that new company make the most of new business enterprise in empress in reorganization, is an essential condition to increases to manage the level, quickly technique reforms, develop the high and additional worth product with new product production line, as soon as quikly change to strong and large business enterprise, realizes soon steel aircraft carrier dream ; dispersion strategy, the technology market quota with deal with produce high additional worth product, completely promote business enterprise brand image, extend high carry product of the exaltation product, is a necessary means to increases business enterprise performance, realizes business enterprise target ; defense strategy, adjusting the business enterprise organizes construction, reducing the intensive type in labor and the low additional worth product line, lower bad the property saves the deal, alleviating the business enterprise burden, attaining the casual wear go to battle, benefitting to the challenge that make frontal attack the rival ; withdraw strategy, compress the production of the high depletion and high cost product, simplify the production craft, controlling the cost of the end product in the lower level, is a valid path to increases business enterprise competition ability

    本論文以攀鋼集團內部的資產重組為研究對象,從都無縫鋼管有責任公司與都鋼鐵廠重組前後的內外部環境入手,運用邁克爾?波特的五力競爭模型及因素析法,析了重組后的企業所面臨的行業競爭態勢。從國際國內行業競爭對手情況和本行業發展動態析了重組后企業應確立的市場地位和發展戰略目標。運用swot析法,對重組后企業的發展戰略,從管理角度進行了析,為重組后企業發展提供了可選擇的四種發展戰略:即大膽發展戰略,要求新公司充運用重組后新企業的資源優勢,資金優勢,人力資源優勢,技術優勢,是提高管理水平,加快技術改造,開發高附加值產品和新產品生產線,盡快立於強勢企業之林,早日實現「鋼鐵航母」夢的必要條件;散性戰略,提高產品的科技含量和生產高附加值的產品,全面提升企業品牌形象,擴大高端產品的市場份額,是提高企業效益,實現企業目標的必要手段;防禦性戰略,調整企業組織結構,削減勞動密集型和低附加值產品生產線,降低不良資產存量,減輕企業包袱,做到輕裝上陣,有利於迎擊競爭對手的挑戰;退出性戰略,壓縮高消耗、高本產品的生產,降低低端產品的比例,精簡生產工藝,將最終產品的本控制在較低水平,是提高企業競爭力的有效途徑。
  9. Combining achievements in past scientific research, this thesis summarizes some problems in the process of decreasing water, the problems contains : important parameters such as percolation coefficient, interfering radius etc ; designers get parameters from their experience and make their choice of limited prospecting materials too simply, because of the limits, designer ca n ' t make quantitative analysis on groundwater ; differences on breakwater effect of setting water - tight screen is still existed, although research evolvement in this field is done ; they ca n ' t grasp the hydrogeology parameters accurately in that it influences rightness of designing in deep excavation water - decreasing

    本文結合以往的研究果,總結了降水過程中存在的一些問題,主要包括:重要設計參數,如地層滲透性、基坑降水影響半徑等,設計中僅從個人經驗出發取值,對有的勘探資料進行取捨和過地簡化。這些局使設計者不能對地下水進行科學的析,盲目性較大;深基坑降低承壓水引起的周邊地面沉降的研究雖已取得很大的進展,但是一些主要問題仍未解決,對防滲帷幕的實際擋水效果存在不同看法;對於弱透水層的水文地質參數一直難以準確把握,影響了深基坑降水設計的正確性。
  10. Associated with a project of the planned xuefengshan tunnel with 7. 6 km long during the construction of shaoyang to huaihua expressway in hunan province of shanghai to ruili national trunk highway, this paper firstly makes an introduction of the frequently - used analysis & computation methods for tunnel supporting structure. then, based on the analysis of the basic theory about the interaction mechanism of surrounding rock and support structure, a spatial computation model is made, a coupling numerical computation method with 3 - d elastic - plastic finite element and infinite element is proposed, and a comprehensive analysis has been made to the effects of the overall stability and safety of the surrounding rocks of different characteristics, different classes and under different construction methods. and thus the problem of 3 - d infinite region to which applying the general finite ca n ' t do has been resolved

    6公里的雪峰山隧道工程,首先介紹了隧道支護結構的常用析計算方法;然後通過對隧道施工過程中,洞室穩性與支護結構相互作用機理的深入析,建立了隧道施工過程的空間計算模型,提出了採用三維彈塑性有元-無元耦合的數值計算方法,綜合析了隧道在不同圍巖特性和圍巖類別條件下,以及不同施工開挖方案等對隧道圍巖整體穩和安全性的影響,從而解決了通用有元方法難以解決的隧道三維無域問題;其可充發揮有元法在析非線性方面的有效性和熟性,以及無元法在析處理無域和半無域方面的精確性和簡便性,為隧道施工過程中圍巖的穩析開辟了一條新的途徑。
  11. Ups to the fullest extent permitted by law specifically disclaims any implied warranties, including but not limited to any warranty of accuracy, completeness, currency, reliability, merchantability or fitness for a particular purpose, any implied warranty arising from course of dealing or course of performance, or any warranty that these pages, or the server that makes them available, are free of viruses or other harmful elements

    在法律許可的最大范圍內, ups不承擔任何默示的擔保,包括但不於有關準確性、完整性、現行有效、可靠性、適銷性或適合特目的的擔保,在交易或作業過程中引發的任何默示擔保,或關於此等網頁或其服務器不具病毒或其它有害的任何擔保。
  12. After filtering out the part of low frequency from the data coming from condition monitor and calculating the comprehensive magnitude of spectrum around the clap - frequency, the alarm limit of clap - frequency vibration mal - functions are determined by using statistical method

    從信號中濾除高頻,求得樣本拍頻附近譜線的綜合幅值,用數理統計的方法確了拍振故障報警
  13. After the reservoir sluices, the national highway 213 in this area will be submerged. so the national highway 213will increase its elevation to about 920 meters. in order to estimate the influence of the slope - sliding and bank - collapsing which caused by the reservoir sluices to the elevated highway, and to estimate possible emigration problem, stability analysis of landslide body no. l, 2, and 3 in i, ii area which located in bank accumulation body of zipingpu reservoir in national highway 213 is made by transfer coefficient method and 2 - d 3 - d fem in this paper

    紫坪鋪水庫正常蓄水位高程877m ,水庫蓄水后將淹沒該段現國道213線,因此國道213線將改線抬高至920m高程附近,為正確評價因水庫蓄水造的滑坡、塌岸對改線公路的影響,以及可能產生的移民問題,本文用傳遞系數法和二維、三維有元方法對有可能失穩的213國道紫坪鋪庫區庫岸堆積體、區的1號、 2號、 3號滑坡體進行了穩析。
  14. Methods the data of 31 cases were analyzed based on essential items in identification of limited capacity for duties in schizophrenia in order to obtain the contribution rate of major variableds

    方法挑選必要的析條目,對31例鑒責任能力的精神裂癥患者的司法鑒次料逐例進行評析對變量進行主析,得出其貢獻率大小。
  15. The characteristics of compaction curves, the evolution of organic matter, the direction of migration and assignment, conduit system, fluid potential are studied it is concluded that the low maturity of the source of the eogene age is the main factor to control the entrapment. it controls the direction of the primary migration, confines the location of mature source rock and the special carrier rock, controls the time of expulsion and the amount of petroleum, therefore ; the effective traps should be near to oil kitchen and on the pathways of migration

    認為下第三系油灶的低熟是影響其運聚藏的關鍵因素,生油巖低熟決油氣初次排烴的方向指向沙三下段;生油巖低熟決熟生油巖佈的局性和輸導體的特殊性;生油巖低熟決起排烴時間晚、生烴量不足,從而決有效的圈閉應是近源的、在運移主路線上。
  16. We hereby certify that the material covered by this report has been inspected in accordance with, and has been found to meet, the applicable requirements described herein, including any specifications forming a part of the description and that the samples representative of the material met the composition limits and had the mechanical properties shown on the face of this sheet

    我們特此證明:本報告所涵蓋的材料已經按照這里描述的適用要求(包括構該描述一部的任何詳細說明)進行了檢查,也發現它們符合該適用要求;同時,材料的樣品代表符合、且具備本頁紙表面所展示的機械特性。
  17. Secondly, in view of the limitation and shortage of traditional simulation of finite element approaches for bolt, a new composite grouted bolt element including nonlinear contacting relation will be built based on the above study of the mechanics mechanism of fully grouted bolt. then, an elastic - plastic finite element program will be developed for the analyses of tunnel stability, in which the composite grouted bolt element and nonlinear finite element analysis method will be used ; the patterns and the affect of main design parameters on the support effect of bolt will be analysed using the program, and conclusions of guidance importance for tunnel support design will be drawn. finally, simulation compution for the excavation and support of a highway tunnel will be made out using the above production, and the method of application of the program will be discussed ; analysis of the deformation, stress and distribution of plastic range will be done, and rational support plan will be worked out, which is of guidance importance for tunnel support design and the thery and technique of fully grouted bolt used in tunneling will be perfected further

    首先,本文在綜合析隧道穩性影響因素及失穩破壞模式的基礎上,對全長粘結式砂漿錨桿作用力學機理進行了深入研究,為全長粘結式砂漿錨桿的有元模擬析奠了基礎;其次,針對傳統錨桿有元模擬方法的局性與不足,在上述全長粘結式砂漿錨桿作用力學機理研究基礎上,建立出能反映界面非線性粘結的新型復合砂漿錨桿有單元模型;然後,運用上述復合砂漿錨桿單元模型,引進非線性有析手段,開發了隧道支護穩析的有元程序,並就全長粘結式砂漿錨桿的型式與設計參數對支護效果的影響進行了深入探討,得到了對隧道支護設計具有指導意義的結論;最後,運用本文研究果對某公路隧道工程實例進行了開挖與支護的模擬計算,探討了其應用方法,並就隧道變形與應力及塑性區佈規律進行了析,從而提出了合理的支護方案,為隧道支護設計提供了參考依據,完善了隧道全長粘結式砂漿錨桿支護的理論與方法。
  18. In response to the limitation of conventional index for stability and optimal design of underground rockmass engineering with high geostress and the drawbacks of conventional energy release rate ( err ) rockburst index based on linear elastic theory without brittle failure phenomenon, local energy release rate ( lerr ), a new rockburst index is proposed

    摘要針對地下工程穩析與優化的常規指標在高地應力條件下的局性及傳統的能量釋放率巖爆指標把巖體看不發生脆性破壞線彈性體的不足,提出局部能量釋放率新指標。
  19. The formulation of laws and regulations on primary and middle school teachers is becoming scientific, clear and sound in following aspects : the install of legislative body, the division of legislative powers, and the operation of legislative procedure

    中小學教師法規的制,在立法主體的設置、立法權的劃和立法程序的運行上,日臻科學、明晰和健全,為整個教育法制鏈條中發展較快較好的一個環節。
  20. Yet you have to mark stacks of hastily scrawled scripts in a limited amount of time

    他們不得不在的時間內,給一大堆匆忙塗寫而的筆試答卷批
分享友人