  1. Combined with practical data of shannxi lin hekou hydropower plant, the temperature filed of m and n schemes during construction and operation are simulated and analyzed. the isoline map of stable temperature field of the arch crest girder section and the vertical section in the center of arch dam, the isoline map of unstable temperature field of the arch crest girder section and the vertical section in the center of arch darn during construction and operation and the maximal and minimal temperature value during construction and operation are provided. the distribution law of temperature in the dam and the form reason of high - temperature zone are analyzed and the effect and feasibility of cooling and the zone of cooling are discussed

    結合西藺河口水電站工程實際資料,對m方案和n方案溫度場進行了施工期和運行期全過程模擬計算分析,給出了拱冠梁剖面和體中心縱剖面準穩定溫度場等值線圖以及施工期、運行期拱冠梁剖面和體中心縱剖面非穩定溫度場等值線圖,提供了施工期逐月和運行期每年最高、最低溫度等成果,分析了體溫度分佈規律以及高溫區形成的原因,並探討了預埋冷卻水管的效果和可行性以及預埋冷卻水管的區域。
  2. Based on research on management modes of deposited mud and sand in cohorts of storerooms and dams in the loess plateau of shannxi province, the authors point out a way how to resolve mud and sand deposit in cohorts of storerooms and dams in terms of landform features and the causes of soil and water loss

    摘要在對北黃土高原庫群泥沙淤積治理模式研究的基礎上,從該區地貌特徵、水土流失成因出發,提出了解決庫群泥沙淤積的途徑。
  3. After the investigation and study of this extruded concrete curb solution overseas, shaanxi provincial bureau of water & electric engineering ( group ) co., ltd. ( spb ) devoted to the research of this new construction method, invented bjy - 40 extrusion curb placing machine, made comprehensive experiments on heihe dam site, and got valuable results, adopted this method in gongboxia hpp main dam construction

    在對國外邊墻施工法進行細致調研后,從2001年開始,工局率先對這一技術進行研究,研製了bjy - 40型邊墻擠壓機,在黑河工地進行了現場擠壓混凝土邊墻和墊層料鋪填碾壓的綜合試驗,取得了具有參考價值的第一手資料,並在公伯峽水電站面板工程中創新採用了這一技術。
  4. Based on the productive experiment on heihe dam site, during april to august 2002, site experiment was made on gongboxia hpp dam site, bjy - 40 extrusion curb placing machine was determined to be applied into gongboxia project, the batch ratio is : cement 80kg / m3, sand 651kg / m3, small stone 1449kg / m3, and sand ratio 31 %, w / c ratio 1. 31, admixture 3 %

    在生產性試驗的基礎上, 2002年4 8月,在公伯峽面板現場進行了擠壓邊墻施工各個環節的試驗,通過試驗,確定公伯峽面板使用工局西安理工大學工程項士學位論文水利機械廠研製的bjy 40型混凝土邊墻擠壓機進行固坡施工,其混凝土配合比為:水泥80kgb 』 ,砂651kgb3 ,小石1449kgb 』 ,砂率31 ,水灰比1
  5. Analyses on effect of sediment - storage dam construction on water resource of north shannxi and the yellow river

    北地區淤地建設對項目區及黃河水資源的影響分析