除水系統 的英文怎麼說
中文拼音 [chúshuǐxìtǒng]
除水系統
英文
other control systems- 除 : Ⅰ動詞1 (去掉) get rid of; eliminate; remove 2 [數學] (用一個數把另一個數分成若干等份) divide:...
- 水 : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
- 系 : 系動詞(打結; 扣) tie; fasten; do up; button up
- 統 : Ⅰ名詞1 (事物間連續的關系) interconnected system 2 (衣服等的筒狀部分) any tube shaped part of ...
- 系統 : 1. (按一定關系組成的同類事物) system 2. (有條理的;有系統的) systematic
-
Evaporative recovery can be used on almost all process rinse water systems, with the exception of those which deteriorate with use.
蒸氣回收法可用於幾乎所有生產過程的漂洗水系統,那些因使用而變質的除外。On december 1, in addition to the us 10, 000 assistance given to the " zulu children dancers, " master also rendered a contribution of us 52, 000 for the xhosa people to rebuild single family houses and enhance the toilet and water systems in their community appendix b. a very touching story lies behind this event
在十二月一日除了給祖魯兒童舞團美金一萬元的財務捐助之外,師父也捐了52 , 000元美金給高薩族人民蓋房子及加強衛浴及供水系統附件b ,這其中還有一段感人的故事。Through this new system, the plant can produce more high quality ashes. the detailed works are involved hi following aspects : i ) the decision of building a new gas - ash - removing system is made, though a broad investigation and a systemic analysis of the original hydro - ash - removing system. ii ) the project of building the improved dry ash handling system is designed
本文主要對某電廠的干除灰系統進行改造,在保留原有水力除灰系統的基礎上,再增加一套氣力除灰系統和分選設施,使得電廠生產出更多的一級粉煤灰以及其它等級的粉煤灰,達到粉煤灰綜合利用的目的。Cdq series coal gas producer outlet spawning, lined set help water, stove inner every arrangement of ideas saturated temperature, upper material, get rid of grey system equal device voluntarily move round process middle, hooverize clouded or frosted imitation glass, safe reliable, operation convenient
Cdq系列煤氣發生爐出口放散夾套補水爐內各層次飽和溫度上料除灰系統均可裝置自動運轉過程中,可節約燒料,安全可靠,操作方便。Operational experience of boiler make - up water treatment by using reverse osmosis - mixed bed demin - eralizing system has been described
介紹了反滲透-混床除鹽系統處理鍋爐補給水時的運行經驗。The works mainly comprise the demolition of an existing stepped ramp of a footbridge nf85 ; construction of a lift shaft and link slab to connect to the existing footbridge ; improvement works to an existing bus lay - by adjacent to the footbridge ; and associated road, drainage and landscape works
工程主要包括在橫跨青山公路近水邊圍的現有行人天橋nf85拆除現有臺階斜道興建升降機槽及連接臺以連接該現有行人天橋改善近該行人天橋的巴士站及相關的道路排水系統和環境美化工程。Article 14 local people ' s governments concerned in areas liable to waterlogging such as plains, depressions, river networks and embankment areas, valleys and basins should formulate planning for elimination and control of waterlogging, organize relevant departments and units to take corresponding control measures, improve drainage systems, develop types and varieties of waterlogging - enduring crops and take integrated measures for controlling flood and water logging, drought, saline and alkaline land
第十四條平原、窪地、水網圩區、山谷、盆地等易澇地區的有關地方人民政府,應當制定除澇治澇規劃,組織有關部門、單位採取相應的治理措施,完善排水系統,發展耐澇農作物種類和品種,開展洪澇、乾旱、鹽堿綜合治理。Automatic control technology for hydraulic decoking system in delayed coker
延遲焦化裝置水力除焦系統自動控制技術Therefore, the descend of so2 removal efficiency should be considered when we rebuild a marble scrubbing dust collector to a equipment of wet calcium fgd & dusting
因此,在將麻石水膜除塵器改造成旋流板塔脫硫除塵系統的過程中,增大葉片仰角的同時一定要考慮脫硫率的下降問題。The pavement subdrainage system removes excessive subsurface water to the edge of highway in time, so it can improve pavement performance and extend service life. asphalt treated permeable base ( atpb ) material has been widely used due to its high drainability and construction convenience
如果在路面內部設置排水系統,將路面結構中的內部滯水及時排除到路面和路基結構外,可以改善路面的使用性能,提高其使用壽命。The whole project comprised the building of the dam, a 2, 428 - yard tunnel driven through the wong nai chung gap valley and a 5, 500 - yard brick and stone aqueduct to connect the reservoir with the storage tank and filter beds at albany road. each day the volume of water being conveyed reached 7 million gallons. the 6 filter beds of the project were situated on the eastern side of the albany nullah ; measuring 3, 245 sq
除水壩外,其他配套的工程包括: (一)一條長達2 , 428碼、貫穿黃泥涌峽谷的隧道; (二)一條長5 , 500碼的引水道,可連接水塘隧道的亞賓尼濾水池及配水庫,該引水道用石及磚砌成,每天可輸水700萬加侖; (三)位於亞賓尼水渠東部的六個過濾池,該濾水系統面積廣達3 , 245平方碼,深30尺,每天可過濾570萬加侖水,原水過濾后,經一條直徑18寸鐵水管,流入花園道與寶雲道交界的配水庫。The system includes two main functions : 1 ) monitoring the running status of high - pressure spray descaling system
該監測診斷系統具有兩大主要功能: 1 、除鱗高壓水系統運行狀態進行監測。At last develops the high - pressure spray descaling system ' s monitor and diagnosis system based on dmds according to the structure and running characteristics of the high - pressure spray descaling system
在此基礎上針對除鱗高壓水系統的具體結構形式和運行特徵開發出一套基於分散式的除鱗高壓水系統監測診斷系統。By adding scale inhibitors, scaling decreases markedly in the return water system and the dust collector of the ende pulverized coal gasifier, and the safe and stable operation cycle is prolonged in the gasifer and the ash water system
通過使用阻垢劑,回水系統及恩德粉煤氣化除塵裝置結垢明顯減輕,延長了氣化裝置及灰水系統安全穩定運行周期。Abstract : the causes for low efficiency of the heater in no. 2 crude unit of jpc refinery are described and analyzed including water leaking of steam soot blower, dew point corrosion caused by steam, soot deposits in convection chamber owning to poor soot blowing, high flue gas temperature, no heat recovery of flue gas, and poor performance of insulation lining, etc. by using sonic soot removing system, flue gas recovery system, spray coating of fiber and rock wool, as well as adjustment of flow scheme accordingly in the technical revamping. the dew point corrosion is completely eliminated, the insulation performance is improved, the heat loss is reduced by 1. 25 %, the flue gas temperature is reduced to about 170, and the heater efficiency is increased from 83 % to more than 90 %
文摘:分析了金陵石油化工公司煉油廠二套常減壓裝置加熱爐存在的因蒸汽吹灰器漏水,蒸汽引起露點腐蝕及吹灰效果差造成對流室積灰,排煙溫度高,煙氣熱量未回收利用以及爐子保溫襯里效果差等問題,提出採用聲波除灰系統、煙氣回收系統、纖維噴塗和巖棉噴塗及相應的流程調整等改造措施.測定結果表明,本次技術改造解決了因蒸汽吹灰器漏水所造成的露點腐蝕問題,提高了保溫效果,減少散熱損失1 . 25 % ,排煙溫度降至170左右,裝置的爐效率由83 %左右提高到90 %以上The causes for low efficiency of the heater in no. 2 crude unit of jpc refinery are described and analyzed including water leaking of steam soot blower, dew point corrosion caused by steam, soot deposits in convection chamber owning to poor soot blowing, high flue gas temperature, no heat recovery of flue gas, and poor performance of insulation lining, etc. by using sonic soot removing system, flue gas recovery system, spray coating of fiber and rock wool, as well as adjustment of flow scheme accordingly in the technical revamping. the dew point corrosion is completely eliminated, the insulation performance is improved, the heat loss is reduced by 1. 25 %, the flue gas temperature is reduced to about 170, and the heater efficiency is increased from 83 % to more than 90 %
分析了金陵石油化工公司煉油廠二套常減壓裝置加熱爐存在的因蒸汽吹灰器漏水,蒸汽引起露點腐蝕及吹灰效果差造成對流室積灰,排煙溫度高,煙氣熱量未回收利用以及爐子保溫襯里效果差等問題,提出採用聲波除灰系統、煙氣回收系統、纖維噴塗和巖棉噴塗及相應的流程調整等改造措施.測定結果表明,本次技術改造解決了因蒸汽吹灰器漏水所造成的露點腐蝕問題,提高了保溫效果,減少散熱損失1 . 25 % ,排煙溫度降至170左右,裝置的爐效率由83 %左右提高到90 %以上According to the groundwater regulation rules, the authority has to control the amount of wells kaohsiung city for mitigating the degree of land - subsidence
依據地下水管制辦法,高雄市全區均為地下水管制區域,除自來水系統不能供應家用及公共給水地區者外,依法不得申請增設地下水井,以避免地層下陷之疑慮。5. 2 the proposed list of inspection items covers different building elements, including external elements, structural elements, drainage, fire safety but excluding those fire service installations currently regulated by the fire services department, and unauthorised building works those constituting obvious or imminent danger to life and property will need to be rectified under the proposed scheme
5 . 2擬議的檢驗項目涵蓋樓宇的不同部分,包括外墻附建構件結構性構件排水系統樓宇消防安全構件目前由消防處規管的消防設備裝置除外及僭建物對生命財產有明顯或迫切危險的僭建物須根據擬議驗樓計劃而清拆。The rebuild method for boiler body, burning system, oil burning system, chemic water treatment system, circular water system, electricity generated and transported system, coal transported system, dust eliminated system and electric system have been given out. the solid waste, smoke, waste water and the dust prevented method are studied. the benefits for economy, society and environment after rebuilding are analyzed
本文從國際能源發展趨勢及龍鳳熱電廠的目前現狀出發,論述了油改煤工程的必要性和可行性;對油改煤的四種鍋爐轉型方案進行了科學的分析和論證,確定了立式旋風爐改造方案;給出了鍋爐本體、燃燒系統、燃油系統、化學水處理系統、循環水系統、發送電系統、輸煤系統、除灰系統、電氣系統的具體改造方案;研究了固體廢物、煙氣、廢水及煤塵的污染防止措施;分析了改造后經濟效益、社會效益及環境效益。With the implementation of a closed low flow drainage system for the collection of runoff from the proposed third golf course, and lower fertilizer and pesticides requirements for seashore paspalum, no operational water quality impact is expected
透過實行密封低流量排水系統以收集擬建球場的徑流對海岸雀稗的低肥料和除蟲劑使用量,運作階段將不會出現水質影響。分享友人