陰澳灣 的英文怎麼說

中文拼音 [yīnàowān]
陰澳灣 英文
yam o
  • : Ⅰ名詞1 (中國古代哲學認為宇宙中通貫物質和人事的兩大對立面之一) (in chinese philosophy medicine ...
  • : 1 (海邊彎曲可以停船的地方 多用於地名) an inlet of the sea; bay (often used in place names) 2 ...
  • : Ⅰ名詞1. (水流彎曲處) bend 2. (海灣) bay; gulf; cove; inlet Ⅱ動詞(使船停住) anchor; moor; tie up
  1. The penny s bay rail link is a 3. 5 - kilometre single - track system connecting a new yam o station on the existing tung chung line to penny s bay where the hong kong disneyland is to be built

    5公里,連接現有東涌線上新建的站與香港迪士尼樂園的選址竹篙,預計在二零零五年通車。
  2. The 3. 5 - kilometre penny s bay rail link that connects a new yam o station on the existing mtr tung chung line to penny s bay where the hong kong disneyland is being built. construction started in july 2002 for completion in 2005

    竹篙鐵路線全長3 . 5公里,連接現有東涌線上新建的站與竹篙(該處現正動工興建香港迪士尼樂園) 。
  3. The completion of sunny bay fresh water service reservoir at yam o tuk, lantau, marks the successful achievement of one major infrastructure projects for penny s bay development and provides assurance of permanent fresh water supply to the hong kong disneyland ( hkd )

    位於大嶼山篤的欣食水配水庫落成啟用,標志政府順利完成竹篙發展的其中一項主要基建工程,亦為香港迪士尼樂園提供穩定可靠的供水。
  4. Pwsc endorsed the upgrading of part of 660cl, entitled " infrastructure for penny s bay development, package 1 - yam o tuk fresh water service reservoir and associated works ", to category a at an estimated cost of $ 165 million in mod prices

    工務小組委員會通過把660cl號工程計劃的一部分提升為甲級工程,稱為"竹篙發展的第1組基礎設施-篤食水配水庫及相關工程" ;按付款當日價格計算,估計費用為1億6 , 500萬元。
  5. The pbrl scheme, which provided for an approximately 3. 5 km long, single - track system, connecting the tung chung line at yam o and a station at hong kong disneyland ( hkd ), was one of the project under the master project agreement entered into by the government, the walt disney company and hongkong international theme parks limited in 1999 on the development of hkd

    竹篙鐵路線方案提共一條約3 . 5公里長的單軌鐵路系統,在連接東涌線及另一端連接香港迪士尼樂園的車站,是政府、和路迪士尼公司及香港國際主題公園有限公司在1999年就發展香港迪士尼樂園而訂立的工程項目總協議之一。
分享友人