  1. The distance from the impermeable base to the free surface is a function of space and time.

    隔水底板至自由面的距離是空間和時間的函數。
  2. In the design, the construction measures such as application of shrinkage - compensating concrete, arrangement of spacing layer between the foundation rock and the bottom slab, adding outside waterproof layer, flexible connection between outlet pipe with side - wall, integerated concrete placement of pump seat with bottom slab and design of reinforcement with application of advanced calculation theory are used according to the characteristics of lager span, larger volume and complex loading conditions of the understructure

    針對下部結構跨度大、體積大、受力復雜的特點,在設計中採取多種措施,包括採用補償收縮混凝土、基巖與間設離層、增設外防層、出管與邊墻採用柔性連接、機座與整體澆注、採用先進計算理論指導配筋。
  3. The relations of in - situ rock stress and water - resisting ability for floor aquifuge

    原巖應力與煤層層阻能力的關系
  4. Catastrophic analysis on the thickness of consolidation for the water retarding formation at the bottom of shaft above the loaded water body

    承壓上井筒層加固厚度的突變分析
  5. Discussion about grouting to solve leakage problem of waterproof floor of deep foundation ditch

    灌漿處理深基坑隔水底板的探討
  6. Therefore, the barrier distribution should be taken into consideration for the perforation of reservoir with bottom water and gas cap

    因此,氣頂油藏油井射孔時,應考慮的分佈。
  7. In 1993, a formula for critical production rate of oil well in bottom water reservoir with partition board was proposed by dr

    摘要1993年李傳亮提出的帶油藏油井臨界產量的計算公式中不含油井打開程度的參數,即沒有考慮油井打開厚度的影響。