隧洞開挖 的英文怎麼說

中文拼音 [suìdòngkāi]
隧洞開挖 英文
tunneling operation
  • : Ⅰ名詞1. (隧道; 地道) tunnel; underground pass2. [書面語] (道路) road3. (郊外的地方) suburbsⅡ動詞[書面語] (旋轉) turn
  • : Ⅰ名詞(物體上穿通的或凹入較深的部分; 窟窿; 洞穴) hole; cavity Ⅱ形容詞(深遠; 透徹) profound; thorough; clear
  • : 動詞(用工具或手從物體的表面向里掘取) dig; excavate; scoop
  1. This thesis tries to solve the problems in the design and construction of jinping cascade 2 hydropower station. a typical section is selected to analysis seepage, seepage control and fem numerical simulation. the influence of different plans of excavation and support on seepage field of subsurface water and stability of adjoining rock are studied. the homologous support pattern is suggested according to the research results

    本文就錦屏二級水電站(一期)深埋長的設計和施工中面臨的一些問題,選取的一個典型斷面進行滲流、滲控分析和及支護的有限元數值模擬,從而就深埋不同的及支護方式對地下水滲流場及圍巖穩定性的影響和所應採取的支護措施等方面進行了探索、研究。
  2. Excavation of tunnel will lead to local geotectonic stress release and redistribution around tunnel ; the appearance of new outlet boundary will lead to outlet seepage of subsurface water and the change of mountain seepage field

    隧洞開挖將引起局部地應力的釋放及周附近的地應力的重新分佈;隧洞開挖后新的出水邊界的出現將導致地下水的大量出滲及山體滲流場的改變。
  3. In the process of construction, some special geological hazards will be met because of the great depth and long distance, such as high external waterpressure, watergushing, high geostress, rockburst, high geotemperature and nocuous gas and so on. these geological hazards become the main restricted factors of tunnel construction

    大埋深將使隧洞開挖施工時遭遇到如高外水壓及高壓涌水、高地應力及巖爆、高地溫、高瓦斯有害氣體等一系列地質災害問題,這成為制約深埋建設快速發展的主要因素。
  4. The key technique of this project is the design and construction of four deep - lying long runnels. their length, diameter and maximum bury - depth are 18 km, llm, 2500 m

    這一工程的關鍵技術是四條長達18公里、徑11米、最大埋深2500米左右深埋長的設計和施工。
  5. Finally we set up three - dimensional space model to simulate the space effect during tunnel construction, analyze the transaction between the left runnel and the right tunnel, and also analyze the deformation and stability of mid - partition

    最後建立了三維空間模型,對連拱時的空間效應、左右的相互影響,以及中隔墻的變形和穩定性進行了模擬分析。
  6. So far as the water conveyance project of dahuofang reservoir is concerned, a summary is made herein on the topography, geomorphy, regional structureal stability, stratigraphic lithology, geological formation, hydrogeological condition and the main engineering geological problems based on the geological investigation achievements got from the design phase of the project in combination of the actual geological condition revealed during the excavation concerned

    摘要主要針對大夥房水庫輸水工程,根據其設計階段的地質勘察成果,同時結合施工中已揭露的實際地質情況,對地形地貌、區域構造穩定性、地層巖性、地質構造、水文地質條件、主要工程地質問題等進行了綜合評述,以期關心本工程的人士能對的工程地質條件有初步了解和認識。
  7. Analysis of excavation progress control in leading block of fenggang tunnel

    鳳崗前段進度控制分析
  8. The tunneling method for the landslide section at the entrance of heishuigou tunnel ( for the internal circle construction road in the construction site of guandi hydropower station ) is presented herein ; in which the tunneling method and the effects of both the pilot and the system supportings on the entrance tunneling into the landslide body are described as well

    摘要介紹了官地水電站場內環線道路黑水河溝道進口滑坡體的施工方法,包括的施工方法以及超前與系統支護對在滑坡體上進所發揮的作用。
  9. Associated with a project of the planned xuefengshan tunnel with 7. 6 km long during the construction of shaoyang to huaihua expressway in hunan province of shanghai to ruili national trunk highway, this paper firstly makes an introduction of the frequently - used analysis & computation methods for tunnel supporting structure. then, based on the analysis of the basic theory about the interaction mechanism of surrounding rock and support structure, a spatial computation model is made, a coupling numerical computation method with 3 - d elastic - plastic finite element and infinite element is proposed, and a comprehensive analysis has been made to the effects of the overall stability and safety of the surrounding rocks of different characteristics, different classes and under different construction methods. and thus the problem of 3 - d infinite region to which applying the general finite ca n ' t do has been resolved

    6公里的雪峰山道工程,首先介紹了道支護結構的常用分析計算方法;然後通過對道施工過程中,室穩定性與支護結構相互作用機理的深入分析,建立了道施工過程的空間計算模型,提出了採用三維彈塑性有限元-無限元耦合的數值計算方法,綜合分析了道在不同圍巖特性和圍巖類別條件下,以及不同施工方案等對道圍巖整體穩定和安全性的影響,從而解決了通用有限元方法難以解決的道三維無限域問題;其可充分發揮有限元法在分析非線性方面的有效性和成熟性,以及無限元法在分析處理無限域和半無限域方面的精確性和簡便性,為道施工過程中圍巖的穩定性分析辟了一條新的途徑。
  10. For the construction of single - arch tunnel within cracked surrounding rocks, 8 tunnel models are set up to study the effect of the earth pressure distribution of the various surrounding rocks due to excavation. the relationships between the loosen zone of tunnel radial earth pressure and the tunnel diameter, the characteristics of surrounding rocks and the exposed time are revealed. it is showed that the pressure loosen radius is 1. 2 ~ 2. 0 tunnel diameters and the strongly loosen radius drops to 0. 5 ~ 1. 0 one for double lane tunnel

    對于單拱破碎圍巖道的構築問題,作者設置了8個道模型,研究對不同道圍巖壓力分佈的影響,揭示了周徑向壓力的鬆弛范圍與徑、圍巖特性、裸露時間的關系,得到雙車道道壓力鬆弛半徑為1 . 2 2 . 0倍徑,強烈鬆弛區半徑為0 . 5 1 . 0倍徑。
  11. Abstract : in order to provide the reasonable parameters in the reliability analysis of tunnel structure and the criterion in the quality control of tunnel engineering, in this paper, the over - under - excavated values of the real - state outline of tunnel excavation are obtained by the near - field photographic method. by using mathematical statistic method, the figure features and probability distributions of the over - under - excavated values of the surrounding rock, including deferent positions of same cross section, are analyzed

    文摘:採用近景攝影的方法,從中獲取圍巖超欠數據,通過數理統計的方法,分析各類圍巖超欠的數字特徵及概率分佈,同時得出各類圍巖超欠道斷面不同部位的分佈規律,為道結構的可靠度研究提供可靠參數,也為道工程質量控制提供基準
  12. On the basis of repeated analyses and verifications, the construction techniques of shed - pipe grouting etc. are adopted therein, with which the tunneling in low - cemented sandy soil is successfully carried out under the condition of higher ground water level, and then both the design and construction are demonstrated to be reasonable and reliable through the actual water delivery operation

    在反復分析論證的基礎上通過採用注漿管棚等施工技術,成功地在高地下水位低膠結度的砂性土中,實際過水應用表明設計施工是合理可靠的。
  13. As to the tunnels of jinping hydroelectric power station in sicuan province, the thesis discusses how to reasonably consider the initial stress field when designing a large - scale tunnel with high initial stress and deep buried. first, by analyzing of the rock lab tests and discusses the feature of regional geomorphology. explains the production of initial stress field, analyze the initial stress of jinping hydroelectric power station ; second, using the fem, the paper creates the real model of region. according to the results of stress measurement point, by combining of ann and fem to decide the boundary condition, the paper calculates the initial stress field ; at last, the paper analyzes the influence of the initial stress field formed from different condition on the deformation and stress of the surrounding rock, and the main factor to influence the initial stress. on the basis of the former work, the author proposes some proposals, which will be helpful for studying and designing of the similar undergroun d engineering

    首先從巖體的應力?變形的特性入手,並結合工程區域的地形地貌特徵,對巖體初始地應力場的形成做出解釋,結合錦屏水電站初始地應力的現狀提出了將地應力場進行分帶;然後建立整個工程區的實體模型,在地質分析的基礎上,以工程區右半部分為代表,參照實測點的初始地應力值,採用了神經網路與有限元相結合的方法反演了該區域的初始地應力場;最後模擬,通過計算比較分析了初始地應力場對處于不同應力帶內的圍巖穩定性的影響,在此基礎上提出了作者的建議,力圖為該類工程的研究設計工作提供有益的幫助。
  14. During tunnel construction, both the excavation and lining are on the critic path of the line - period of the construction

    摘要在工程施工中,與襯砌均處在關鍵線路上,佔用直線工期。
  15. Application of soil nailing in tunnel portal excavation

    土釘支護在中的應用
  16. Secondly, grounded on the study of the distribution of the high external waterpressure and high geostress and the characteristic of the rock in engineering area, the paper built the elastoplastic fem numerical simulation model, and think over the procedure in tunnels excavation and the history of work of water load, and then get the relations between the different tunnels diameter, different permeability coefficient and depth of the grouting rock and the deformation, stress distribution and plastic range of the surrounding rock and support structure. finally, according to the modern design theory of tunnels construction, the particular design of country rock reinforcement and support structure are researched and presented for diversion tunnels

    接著,本文在深入研究工程區高外水壓力及高地應力分佈規律及巖體特性的基礎上,建立起高地應力、高外水壓力作用下圍巖結構非線性有限元模擬計算模型,然後考慮過程、水荷載的作用歷史,通過計算分析得出了不同徑、不同的灌漿圈滲透系數和不同的灌漿圈深度以及不同過程與圍巖及支護結構的應力、位移和塑性區的關系。
  17. All water conveyance and water discharge structures are designed to locate at right bank strip ridge, due to special topography and land form. large excavation area and steep slope raising from close plan locations of adjacent structure lead to slope stability. in general, slope stability analysis and treatment are concerns of zipingpu project

    由於其特殊的地形、地貌,工程的各輸、泄水建築物共7條均布置在右岸條形山脊內,各相鄰建築物進出口的平面位置距離較近,范圍大、坡度高且陡,存在著大量因而形成的高邊坡穩定問題。
  18. Numerical analysis of coupled hydro - mechanical processes in deformed fractured porous media during tunnel excavation

    隧洞開挖過程中的裂隙多孔介質水力耦合分析
  19. The application of the new austrian tunneling method to the tunneling of the diversion tunnel for dalong water control project is described herein

    摘要主要介紹新奧法施工在三亞大隆水利樞紐工程導流隧洞開挖中的應用。
  20. The construction of the multiple - arch tunnel is deeply related to the form of center partition, the tunnel ' s section and excavation method etc. the change regularities of stress field caused by excavation are studied by 4 multiple - arch unlined tunnel model tests. the difference in lining for various multiple - arch sections is analyzed and the mechanics characteristics of center partition is discussed. then, a reasonable construction method for multiple - arch tunnel and a better section are put forward

    通過4個連拱模型試驗,研究了連拱毛引起的應力場變化規律,對不同的連拱斷面的襯砌受力差異進行了深入的分析,同時對中隔墻的受力特點也作了探討,提出了合理的連拱道構築方法及優化斷面圖。
分享友人