隧道施工 的英文怎麼說

中文拼音 [suìdàoshīgōng]
隧道施工 英文
tunnel construction
  • : Ⅰ名詞1. (隧道; 地道) tunnel; underground pass2. [書面語] (道路) road3. (郊外的地方) suburbsⅡ動詞[書面語] (旋轉) turn
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • 隧道 : tunnel; tunneling; tunnelling; chunnel; drive
  • 施工 : be in the process of construction; be under construction; build; construction
  1. The constructional technology in tunnel of great section wind drift sand

    公路大斷面風積砂隧道施工技術
  2. The controlling parameters for smooth blasting in qin - ling zhongnanshan tunnel project are optimized according to the fundamental principle of smooth blasting, considering the minimal resistance, coefficient of embrasure density, coefficient of non - coupling, density of dynamite and rate of exploding. the efficiency of this method has been analyzed and justified by the high speed and good quality of the project

    根據光面爆破的基本原理,從最小抵抗線、爆眼密集系數、不耦合系數、線裝藥密度、爆破進尺等幾個方面確定秦嶺終南山光面爆破主要參數的選取,分析了該鉆爆設計在隧道施工中的運用取得的成效,提高了進度,同時也保證了質量。
  3. Effect of temperature control on tunnel construction in permafrost

    溫度場控制在多年凍土隧道施工中的作用
  4. The monitoring and analysis of superhighway multiple arch tunnel construction

    高速公路連拱隧道施工監測及分析
  5. Quality control of the operation of tbm full - size tunnelling machine

    全斷面掘進機在隧道施工中的質量控制
  6. The application of value engineering in trnnel work organization design

    價值程在隧道施工組織設計中的應用探討
  7. Based on newmark ' s step - by - step implicit integration method, the response analyses of a tunnel are performed by using viscous - spring artificial boundary under various earthquake accelerations and multiform conditions of surround rock. the seismic responses of the tunnel are calculated by changing parameters of surround rock within the tunnel some ranges. two kinds of shock absorption measures, which are setting shock layer and reinforcing surround rock are studied and shock absorption effects, applicable to cases and shock mechanism are analyze

    4計算了不同地震動作用下不同的圍巖材料對地震反應的影響,並通過改變襯砌一定范圍內圍巖材料的參數,計算了的地震反應,分析了在隧道施工中設置減震層和注漿加固一定范圍內圍巖這兩種方法的減震效果、適用條件及其減震機理。
  8. Construction technique for the shallowly buried and darkly excavated tunnel on the cobble water - rich stratum

    砂卵石富水地層淺埋暗挖隧道施工技術
  9. Smooth blasting technology for a tunnel in frozen soil

    高原凍土隧道施工機械適應性技術
  10. Analysis of the factors affecting the construction organization of shield tunnels of subway

    地鐵盾構隧道施工組織影響因素分析
  11. Construction technology of baiyinshan tunnel in china

    中國白銀山隧道施工技術
  12. Construction management in daqing tunnel

    大箐隧道施工中的建設管理總結
  13. Abstract : by using early - strength frost - resistant agent in consolidatinganchor bolt, extra early - strength frost - resistant thickener and special technology in shotcreting, the difficulty arising from freezing weather with an ambient temperature of - 10 - 18 was solved

    文摘:介紹在環境氣溫- 10 - 18條件下,採用早強抗凍錨固劑固結錨桿、超早強抗凍粘稠劑和特殊藝噴射混凝土,使隧道施工支護及時,解決了冬期噴錨難的老大難問題。
  14. Since the shallow depth excavation is the main factor to cause ground settlement in shenzhen subway tunnel, this paper discusses some corresponding countermeasures including the improvement of ground property, appropriate draining of groundwater, scheduled excavation depth and width, etc, to control strata distortion and surface settlement, and argues that these measures are expected to effectively control surface settlement while constructing city subway in soft ground excavation

    摘要針對深圳地鐵淺埋暗挖隧道施工中影響地表下降及地層變形的因素,提出了遵循「十八字」原則、改善土體特性、適度排放地下水、根據地層條件選擇方法、增大左右線開挖面的距離、合理確定開挖進尺、提高效率、加強初期支護、及時作二次襯砌等對策。
  15. A study on construction technology of double - arch tunnel in loess

    黃土連拱隧道施工技術研究
  16. The construction technique of double arches tunnel in expressway

    高速公路雙連拱隧道施工技術
  17. Construction technology of expressway double - span multiple - arch tunnel

    高速公路雙跨連拱隧道施工
  18. Discussion on the construction option of liujianshan double arch tunnel

    六尖山雙連拱隧道施工方案探討
  19. Construction technique for guanshang 1 m - type curved - wall twin - arch tunnel

    型曲墻式雙連拱隧道施工技術
  20. Code for construction on tunnel of railway

    鐵路隧道施工規范
分享友人