隧道開挖車 的英文怎麼說

中文拼音 [suìdàokāi]
隧道開挖車 英文
tunnel carriage
  • : Ⅰ名詞1. (隧道; 地道) tunnel; underground pass2. [書面語] (道路) road3. (郊外的地方) suburbsⅡ動詞[書面語] (旋轉) turn
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • : 動詞(用工具或手從物體的表面向里掘取) dig; excavate; scoop
  • : 車名詞1. (中國象棋棋子的一種) chariot, one of the pieces in chinese chess2. (國際象棋棋子的一種) castle; rook
  • 隧道 : tunnel; tunneling; tunnelling; chunnel; drive
  1. Through analyzing all kinds of construction methods of building metro station under shield driven method in many countries, this paper studies the construction technique ( method ) of building metro station under shield driven method, taking in guangzhou no. 3 metro line, and linhe xilu station as the actual object. according to station class, function and topography and geology, the station schemes of twin - bore tunnel ( island ), firstly, three parallel tunnels ( island ), tri - bore tunnel ( island or side ) and four parallel tunnels ( island or side ) are proposed. secondly, the shape and main parameters of station structure on two schemes are analyzed with load - structure mode, for different overburden depth of tunnel and lining thickness, etc. thirdly, the construction process is simulated in 2d fem.,

    根據建站的規模、使用功能及站位地形地質條件,提出了兩連拱結構島式站臺站、三條平行島式站臺站、三連拱結構島式和側式站臺站以及四條平行島式和側式站臺站方案;採用荷載?結構模式,對四種方案的主體結構的形式和重要參數進行分析研究,分不同的埋深、襯砌結構厚度和拱形結構的拱跨比進行了多組數值計算;採用平面有限元方法對四種站結構的施作過程進行了模擬分析。
  2. To minimize worsening of traffic congestion and taking environmental and visual concerns into consideration, most mrt system routes in metropolitan areas are underground. except for those stations and crossovers where wide ranging areas are involved, the tunnel boring machine is usually applied. conventional tunnel boring was first adopted in 1818 in london, but at that time was only used on a one - line circular tunnel basis

    為減少對交通之沖擊及環境之影響,一般于都會區大眾捷運系統之路線劃皆以地下化為主,而整條路線除大面積之地下站及轉轍段外,其餘皆以潛盾工法作為設計之主要考量。
  3. For the construction of single - arch tunnel within cracked surrounding rocks, 8 tunnel models are set up to study the effect of the earth pressure distribution of the various surrounding rocks due to excavation. the relationships between the loosen zone of tunnel radial earth pressure and the tunnel diameter, the characteristics of surrounding rocks and the exposed time are revealed. it is showed that the pressure loosen radius is 1. 2 ~ 2. 0 tunnel diameters and the strongly loosen radius drops to 0. 5 ~ 1. 0 one for double lane tunnel

    對于單拱破碎圍巖的構築問題,作者設置了8個模型,研究對不同圍巖壓力分佈的影響,揭示了洞周徑向壓力的鬆弛范圍與洞徑、圍巖特性、裸露時間的關系,得到雙壓力鬆弛半徑為1 . 2 2 . 0倍洞徑,強烈鬆弛區半徑為0 . 5 1 . 0倍洞徑。
  4. For a recommended design of some subway station, the centrifugal model is often tested to analyze the settlement of the ground caused by the digging of the tunnel

    摘要通過對某地鐵站設計推薦方案進行離心模型試驗,分析對地面的沈降影響。
  5. The railway tunnels along canton road and underneath the former marine police headquarters will be constructed by the bored tunnelling method to minimize impacts on the adjacent environment. other than the excavation works that need to be carried out within the works site near the canton road government offices for the new station and introducing the tunnel boring machine, the works that need to be carried out at the street level along canton road will be small in scale so as to minimize the impact on the environment in the neighbourhood

    在廣東沿路和前水警總部地底的鐵路,會以鉆方式建造,除了在廣東政府合署現址附近的工地內地面以便興建新站及引進機外,需要在廣東路面進行的工程規模會很少,以便盡量減少對毗鄰環境的影響。
分享友人