集水工程 的英文怎麼說
中文拼音 [jíshuǐgōngchéng]
集水工程
英文
collecting work-
Lee, j. j. ( 1969 ), wave induced oscillations in harbors of arbitrary shape, u. s. army corps of engineers
尹彰、周宗仁、林?圭、黃偉柏( 1998 ) ,平面造波水池之特性探討,第二十屆海洋工程研討會議論文集, 95 - 102頁。Products as submersible mixers and submerisible blowoff pumps to the production of the complete - plant special water treament equipment, the company has tried its best to rank among 100 largest enterprises in chian2 s industry of environmental protection. braving the wind and rain for more the 40 years, now the company has formed the capability of batch production of the production of the pump category and special water treatment equipment
南京藍深環境工程設備有限公司是藍深集團水處理設備的專業研發、生產、營銷機構,藍深不僅為工業的發展提供產品,而且也參與水污染治理,為污水處理提供高效產品和經濟解決方案。On the basis of collecting and arranging a large amount of projects experience, conbined with construction diversion flood passing measures design and hydraulic model test of lihua hydraulic pawer station in 1995 and 1996, the dissertation studies the issues related with characteristics of concrete face rockfill dam including the selection of construction diversion flood passing standard and measures, flood passing during construction period and embankment stage, coffer dam design, construction scheme and general schedule etc. and present preference for project construction
本文在搜集整理大量工程經驗的基礎上,結合蓮花水電站在1995年及1996年導流渡汛工程措施設計及水工模型試驗,對混凝土面板堆石壩的導流渡汛標準、導流方式及其選擇、施工期渡汛及壩體填築分期、圍堰設計以及施工方案及總進度等與混凝土面板堆石壩特點有關的問題進行研究,為工程建設提供一定的參考。The following are the large projects undertaking by haifeng company : crude oil electricity plant project of north china oil field hydroelectricity factory, apartment ( 22 stories ) of yuanda real estate company of dalian shipping group, helios hotel of helios group in dalian development zone, tilt aqueduct bridge of shanxi hongqi reservoir ( total span : 267m ), supply and sale building and city construction building ( both are antique architectures ) of shanxi heyang city, sea drainage pipe of hainan fudao fertilizer factory ( 1520 ), 8 oilgas docks of hainan haiyan oilgas company, basha condensable gas transfer station of haiyan company, 10, 000m3 oilgas storage tank of arco company ( usa ) in hainan nanshan, gas pipe and fuel gas installation project of hainan nanshan electricity co., ltd, base and accessory project of hainan gas company, bei da huang cereal and oil market in harerbin, hainan cross island pipe, changhuajiang river pipe crossing project, taihangshan mountain earthwork project ( the 19th section of west - to - east gas transmission project )
海南海峰公司承建大的工程項目:華北油田水電廠原油發電站工程;大連船泊集團遠達地產公司的遠達公寓( 22層) ;大連開發區香港太陽神集團的太陽神大酒店;陜西紅旗水庫斜拉渡槽工程(全跨267m ) ;陜西合陽供銷大樓及城建大樓(均為仿古) ;海南富島化肥廠排海管線( 1520 ) ;海南海燕油氣公司八所油氣碼頭;海燕公司白沙液化氣中轉站;海南南山美國阿科公司儲油氣萬立米大罐工程;海南南山電力股份有限公司天然氣管線及燃氣安裝工程;海南南海天然氣有限公司基地及配套工程;哈爾濱北大荒糧油批發市場;海南環島管線;昌化江穿越工程;西氣東輸十九標段,太行山土石方工程。This is portable pump with strong suction and medium head doss, equiped with extraordinary hair collector ; the body is made of themal plastic of strength ening fiberglass with good corrosive and impact resistance ; and with the advan tages of high flow, quiet
這是一款輕便、自吸式、中等揚程的水泵、配有特大的毛發收集器;泵體由玻纖增強的工程塑料注塑而成;有良好的抗沖性和耐腐蝕性;此水泵具有高流量、運行安靜之優點。Sewerage means mainly the pipes or drains which carry sewage but can include all sewage collection, treatment and removal.
污水工程主要是指輸送污水的管道或排水管,但它可以包括所有污水的收集、處理和清除。Various sewerage works were outlined in the east kowloon and north south kowloon sewerage master plans drawn up for the area, and these began to be carried out in the 1990s. they included construction of a number of dry weather flow interceptors along the nullah to intercept polluted storm flow, along with the replacement of worn - out and often overloaded sewerage facilities
東九和九北部及南部污水收集整體計劃為該區規劃了多項污水工程,這些工程在九十年代陸續動工,當中包括沿啟德明渠建造旱季截流設備以截止污染雨水,以及更換負荷過重又殘舊的污水設施。Proceeding with the analysis of water resource peculiarity of jilin province, the authors bring forward that effective gathering and using of rainwater can supplement the gross amount of rainwater in valley, probe into rainwater resources use in jilin province : first is to make rainwater resources use plan in valley program, secondly is to construct gully dam system according to water and soil conservation project, to strengthen sloping field collection rain ' s project and forest - grass construction, to increase storage space, thirdly is to fully utilize field project and water conservancy project to gather rain water, intercept rainfall on the spot so as to restore water environment
摘要從吉林省水資源特點分析入手,提出了雨水資源的有效集蓄利用是補充流域水資源總量不足的重要因素,探討了在吉林省雨水資源主要利用途徑是首先在小流域規劃中作好雨水資源利用規劃;其次是建設以水土保持治溝骨幹工程為主的溝道壩系,強化坡面集雨工程和林草植被建設,增大貯水空間;第三是充分利用田間工程和水利工程集雨蓄水,使降雨就地就近被攔蓄,最終使水環境得以修復。Covering an area of 30, 000 square meters, we have an annual production capacity of 120, 000 pieces of solar water heaters and have the ability to carry on the guesthouse, factory, school large - scale collective solar projects in designing, producing and constructing
公司佔地面積30 , 000多平方米,具有年產家用太陽能熱水器12萬臺和承接賓館工廠學校太陽能大型集熱工程設計生產施工能力,成為全國太陽能行業中的佼佼者。Which is situated in the western of he nan and is drought year in year out and it is a multiple - purpose water supply development with agricultural irrigation, municipal water supply and rural water of men and domestic animals. the irrigation district was designed by he nan water survey designing institute in 1967, and began to be built in 1970. the aggregate main canal and the east - two main canal were built up and began to irrigate partially in 1974. up of the dong song part of the main canal had been built in 1980, and the first periodical project was completed in 1991. one part of the west main canal was built afterward
河南省陸渾灌區是河南省百萬畝以上大型灌區之一,地處十年九旱的河南省西部,是一集農業灌溉,城市供水,農村人蓄吃水為一體的多目標供水工程,灌區於1967年由河南省水利勘測設計院開始勘測規劃設計, 1970年開工建設, 1974年建成總乾渠、東二乾渠,並通水局部施灌, 1980年完成東一乾渠東宋以上渠段, 1991年第一期工程竣工驗收,以後又修建了西乾渠部分工程。Photo of schedule for implementing village sewerage projects under the port shelter sewerage master plan and its review
牛尾海污水收集整體計劃及檢討計劃鄉村污水工程的實施時間表圖片Sewerage projects under the port shelter sewerage master plan are being implemented in phases, and as these are completed there should be further gradual improvements in water quality
目前政府正分階段展開牛尾海污水收集整體計劃的污水工程,工程完成後水質將會進一步改善。Photo of schedule for implementing village sewerage projects under the north district sewerage master plan and its review
北區污水收集整體計劃及檢討計劃的鄉村污水工程實施時間表圖片Photo of schedule for implementing village sewerage projects under the tolo harbour sewerage master plan and its review
吐露港污水收集整體計劃及檢討計劃鄉村污水工程的實施時間表圖片Photo of schedule for implementing village sewerage projects under the yuen long kam tin sewerage master plan and its review
元朗及錦田污水收集整體計劃及檢討計劃的鄉村污水工程實施時間表圖片Beijing tsinghua unisplendour solar energy technology research center is an integrated corporation with perfect manufacturing, marketing and follow - up services system. it is attended to the technological development of new sources of energy, such as solar water heater, solar energy collecting project, solar pv ( photovoltaic ), etc. into a famous and fund as the sup - porting points to develop green and economical product, especially over solar water heater and applied techniques of laige scale heat collecting projects
北京清華紫光太陽能技術研究所是致力於太陽能熱水器、太陽能集熱工程、太陽能光伏等新能源的技術開發,產品生產、市場營銷及完善的售後服務為一體的綜合型企業,公司集清華大學的特殊優勢和17年的市場積累,以品牌、資源及資金為發展支點,開發綠色節能產品,特別是太陽能熱水器和太陽能大型集熱工程的應用技術,憑借對科技成果產業化的管理能力和經驗,逐步發展成為較具規模和引導行業技術發展的企業。Based on the construction practice of the water conveyance project of dahuofang resrevoir, the feature, collection, management of the electronic archives for the project under construction and its protection and utilization are described herein, so as to find out and set up a set of convenient and feasible management modes for it, and then to enhance the levels of both the utilization and the management of the engineering archives of the project under construction as well
摘要以大夥房水庫輸水工程為例,通過闡述在建工程電子檔案的特性、收集、管理及利用、保護等方面的特點,力求探索和建立一套方便快捷、行之有效的在建工程電子檔案管理模式,以提高在建工程檔案的利用率和管理水平。High quality water supply and direct drinking project ; high quality direct drinking for residential area, unit and group, etc
分質供水和直飲水工程;小區、單位、集團等優質直接飲用。The subsidiary company, cbtgc tian jian building engineering co., ltd. possesses 1st class qualification of contracting on lighting engineering and 2nd class qualification of contracting on glass curtain wall, waterproofing work, pre - stressed engineering and special engineering contracting qualification ( limited to structure reinforcing )
集團公司全資子公司北京中技天建建築工程有限公司還具有城市及道路照明工程專業承包壹級、建築幕墻工程專業承包貳級、建築防水工程專業承包貳級、預應力工程專業承包貳級資質和特種專業工程專業承包資質(限結構補強) 。There are some characters on china ' s collecting rain of hilly regions. such as low jumping - off point, weak foundation, lack of management and low efficiency, so building the highly efficient hrh engineering is gradually becoming an important matter of hilly water saving irrigation engineering
由於我國丘陵山地雨水集蓄工程起點低、基礎較差,較普遍地存在管理不善以及效率低等問題。於是建設高效的雨水集蓄工程逐漸成為丘陵山地節水灌溉的重要內容。分享友人