集總加載 的英文怎麼說

中文拼音 [zǒngjiāzǎi]
集總加載 英文
lumped loading
  • : gatherassemblecollect
  • : Ⅰ動詞(總括; 匯集) assemble; gather; put together; sum up Ⅱ形容詞1 (全部的; 全面的) general; o...
  • : 載Ⅰ名詞(年) year : 一年半載 six to twelve months; six months to a year; 三年五載 three to five ...
  1. We propose in this paper an evaluation method for the transient performance of das, through the period signal, by utilizing the much smaller difference than sampling period between the multi - periods of signal and the multi - sampling periods, getting shorter equivalent sampling period ( i. e. higher equivalent sampling rate ), which is derived from input signal period and sampling period, and then, the problem that how to get the transient performance of das has been solved. the transfer function of das is then evaluated and identified, and practical test results are also presented

    本文介紹一種方法,通過對其特定的周期性輸入信號,使用采樣周期的整數倍和信號周期整數倍間的微小偏差,獲得比實際采樣周期小得多的等效采樣周期,從而解決了數據採系統瞬態響應特性的獲取問題;並進而獲得了數據採系統傳遞函數的辨識和評價結果,實現了數據採系統瞬態特性的體評價。
  2. In this paper, the three level fortification criterion, two stage design method and the elastic response spectrum theory are adopted, and the program of nba ( the program of nonlinear - aseismic analysis for beam bridge ) is used to calculate. through gathering, analyzing and calculating a lot of bridge design materials, this paper induces a simple way to calculate the relative displacement of the beam and the pier, and then according to the current design method, it concludes a better design principle of the supporting length of the beams. at the same time the dynamics is adopted to put forward the design method of the carrying capacity and the lengthen of prestress wire ( steel bar ) falling - off prevention structures of highway bridges

    本論文採用三水準設防、兩階段設計方法、彈性反應譜計算理論,運用橋梁結構非線性地震響應分析程序nba ( theprogramofnonlinear ? aseismicanalysisforbeambridge )進行計算;通過收大量的實橋設計資料,經分析計算,歸納結出計算上下部結構相對位移的簡便計算方法;並綜合國內外的經驗值,提出梁的支承長度se的設計原則;同時運用動力學突的原理,推導分析了預應力鋼絞線式(鋼棒連接式)落梁防止裝置設計承力的計算方法和設計伸長量s _ f的取值;最後本文通過實橋計算,說明了落梁防止系統設計的方法。
  3. The authour investigate the dosing conditions and effect of the pac to the huanghe water - source, which includes the following four parts : the selection of the pac ; the confirmation of dosing scheme and effect of the pac ; the research of application of potassium permanganate in combination with pac ; the research of the pac ' s modification and the modified effectiveness. the experiment is mainly carried out on the pilot system in the jieyuan water plan of tianjin. the results of the reseach include the following : l ) the pac from zunhua plant is selected as the better carbon for the source water of tianjin through the experiment ; 2 ) through the pilot experiment we conclude that the pac ' s best adding point is the mixing tank and the better dose is 10mg / l, on which the codmn of filtered water can be decreased to 40 % and the effluent have no problem of odour and color ; 3the adsorbing experiment show that pac mainly adsorb the organic matters which molecular wt., distribution between 500 and 3000, and can adsorb organic matters whose molecular wt., distribution are bigger than 6000 if the dose of it is adequent ; 4 ) pac together with potassium permanganate can remove the organic matter more effectively than each of them alone, and reduce the rising trend of turbidity of the flotation ' s effluent due to adding pac ; 5 ) the thesis made a research on the surface properties and the adsorbing capability of the modified carbon by oxidizer : the modified carbon with 20 % h2o2 can remove more organic pollutants than the untreated one by 12 % when we add a higher dose of coagulant ; 6 ) the modification of reduction and loading metal ions are also sttldied, and drow the following conclusions : the modified carbon with 5 % ammonia can enhance the organic matter ' s removal effectiveness by 10 % to the tianjin source water than the untreated one, and the modified one with loading metal ion remove the organic matters from the tianjin source water better ( 8 % ) than the untreated one due to the strong affinity betwween the humic acid and copper ion

    本文的實驗主要是在天津芥園水廠的中試系統上完成的,論文的成果和結論主要包括: 1 )通過靜態實驗選定河北遵化活性炭廠生產的煤質炭為適合天津原水的炭種; 2 )中試實驗確定粉末活性炭的較佳投點為混合池投,較佳投量為10mg l ,此時可使濾后水的cod _ ( mn )降低40 ,且可較好地控制濾后水的嗅味和色度; 3 )初步確定粉末活性炭對原水中有機物的吸附主要中在分子量在500 - 3000范圍內,投量增大時可吸附部分分子量大於6000的有機物4 )中試實驗表明:粉末活性炭與高錳酸鉀聯用可取得較兩者單獨應用時對有機物更好的去除效果,且對因投粉末活性炭而造成的氣浮出水濁度升高有一定的改善作用; 5 )研究並初步確定氧化改性對粉末活性炭表面性質和有機物的去除效果的影響:粉末活性炭的氧化改性會使其表面的酸性官能團大量增強,表面極性增;經20的過氧化氫改性的活性炭在增大混凝劑投量( fecl _ 3投量為15mg l )時對有機物的體去除效果較原活性炭提高12 , 1次氯酸鈉改性活性炭對有機物的去除效果較原活性炭提高6 ; 6 )研究並初步確定還原改性、負金屬離子對原水中有機物的去除效果的影響:經5氨水改性的活性炭可提高天津源水中有機物的去除率達到10 ;負銅離子后的活性炭可提高對腐殖酸類物質的去除能力,一般可提高8左右。
  4. If this. dll file is not present on the device, all exceptions contain the message " cannot load resource assembly. " during development, however, it is useful to add a reference to system. sr. dll to your microsoft visual studio 2005 project so you will see meaningful exceptions

    Dll文件,則所有異常都包含消息「無法資源程序」 。不過,在開發期間將system . sr . dll引用添到microsoft visual studio 2005項目中是有用的,因為這樣您將看到有意義的異常。
  5. For normal applications, assemblies are usually unloaded in the reverse order that they are loaded, but this is not guaranteed

    對于普通的應用程序,通常情況下程序的卸順序與其順序相反,但不是這樣。
  6. An index in which the logical order of the index key values is different than the physical order of the corresponding rows in a table. the index contains row locators that point to the storage location of the table data

    1 .多維數據中的一組操作,用於重新生成多維數據的結構,將數據到多維結構中,計算匯信息,並保存預先計算的聚合。
分享友人