難度大的洞 的英文怎麼說

中文拼音 [nándedòng]
難度大的洞 英文
tricky hole
  • : 難Ⅰ形容詞1 (做起來費事的) difficult; hard; troublesome 2 (不容易; 不大可能) hardly possible 3...
  • : 度動詞[書面語] (推測; 估計) surmise; estimate
  • : 4次方是 The fourth power of 2 is direction
  • : Ⅰ名詞(物體上穿通的或凹入較深的部分; 窟窿; 洞穴) hole; cavity Ⅱ形容詞(深遠; 透徹) profound; thorough; clear
  • 難度 : degree of difficulty; difficulty
  1. While dissertating the functions of ngos, the author attempts to discard traditional approaches discussing in general functions of ngos ’, but tries to make further expansion, clarify the functions of ngos different fields during the transformation period, and discuss mainly it ’ s two major functions in accelerating social development and the reform of the government ; meanwhile, this article also points out the main problems of ngos in the transformation period : the indeterminate circumscription between ngos and government organizations, misplaced the organization goals, undivided functions of community and politics ; the lapsus in management and difficulties in operation caused by double management system ; the low level of ngos ’ internal management, weak survival ability, and the limited ability in mobilizing resources ; deficient management evaluation mechanism in ngos ’ ; low level of legalized management of ngos ’

    在論述非政府組織作用時,試圖拋開過去泛泛而談其作用做法,做了進一步拓展,釐清轉型期非政府組織在不同領域作用,將其主要定位在對促進政府改革作用和在社會發展中作用兩方面。同時,本文也指出了轉型期非政府組織存在主要問題:非政府組織與政府組織界限不明確,組織目標錯位,政社不分;雙重管理體製造成管理體制和運作上;非政府組織內部管理水平低,生存能力較弱,資源動員能力有限;非政府組織內部管理評估機制匱乏;非政府組織管理法制化程低等。
  2. To pass its threshold was to return to stagnation ; to cross the silent hall, to ascend the darksome staircase, to seek my own lonely little room, and then to meet tranquil mrs. fairfax, and spend the long winter evening with her, and her only, was to quell wholly the faint excitement wakened by my walk, - to slip again over my faculties the viewless fetters of an uniform and too still existence ; of an existence whose very privileges of security and ease i was becoming incapable of appreciating

    踏進門檻就意味著回到了一潭死水之中,穿過寂靜廳,登上暗樓梯,尋找我那孤寂小房間,然後去見心如古井費爾法克斯太太,同她,只同她過漫長冬夜,這一切將徹底澆滅我這回步行所激起興奮,重又用一成不變靜止生活無形鐐銬,鎖住我自己感官。這種生活穩定安逸長處,我已以欣賞。
  3. Tunnel construction is very difficult hi region with high geotectonic stress and high subsurface water pressure. few deep - lying tunnels are constructed in civil conveyance and hydropower engineering up to now

    特別是對在高地應力、高地下水位區域建設,其施工,在國內水利水電工程建設中並不多見。
  4. The geological conditions are very complicated in hejiazhai tunnel which is located in guizhou shuibo railway, this tunnel is named " mashed tunnel " with the most difficult geological conditions such as the high dense gas and developed karst and gushing water assembled together, the geological hazards like the gushing water and sand, the collapse of tunnel, surface subsidence and slide, cracking of tunnel lining were often happened during construction period

    摘要貴州水柏鐵路何家寨隧道,工程地質條件極其復雜,集「高瓦斯、強巖溶、涌水」為一體,施工期間曾發生多次涌水涌砂、內坍方、地表塌陷與滑坡、支護襯砌開裂變形等地質災害,堪稱水柏鐵路施工「爛子」 。
  5. For example, when the design flow of upward of the peace bridge of upward of the east - one main canal is 45m3 / s, the actual flow quantity is 23. 8m3 / s on the 30th of september in 1989, the water level of the transition region terminal of the mouth of hao wan flume of the east - one main canal had gained the design level of 4. 3m, and the level between downstream and shang tian yuan tunnel was generally higher. it says that the actual discharge capacity now is only about 24m3 / s which is half of the design value. this not only make the benefit of the irrigation district abnormal, but also greatly hinder the economic development of the irrigation district, and lead to the canal run frequently at small flow, high water level, lengthen the discharge duration

    如東一乾渠上段太平橋以上設計流量45m ~ 3 s , 1989年9月30日實測通水流量23 . 8m ~ 3 s時,東一乾渠郝灣渡槽出口漸變段末端水位已達到設計水位4 . 3m ,其下游至上天院隧水位也普遍偏高,即東一乾渠上段目前僅能通過流量24m ~ 3 s左右,只有設計值50左右,不僅使灌區效益得不到正常發揮,嚴重阻礙了灌區范圍內經濟發展,而且使渠道經常處于小流量、高水位運行,延長了次通水時間,增加了渠道工程安全管理
  6. Not only does slump loss influence the effect, it constrains the transportation distance and pumping height and distance but also, and these will make the construction harder. and if slump loss is too much, it will be difficult to cast, and these will be such defects as honeycombs and pothotes, and they will reduce the quality of construction

    坍落損失不僅直接影響到外加劑使用效果,還制約了攪拌站服務半徑以及泵送和距離,給施工生產帶來很多不便,另外,坍落損失過還會造成澆築困,導致混凝土中產生蜂窩、孔等缺陷,嚴重影響工程質量。
  7. During the construction of a deep - embedded tunnel with long distance and large cross - section, only one tunneling method is hard to meet the construction requirement as the tunnel line is too long with varied embed depths, and furthermore, different classes of surrounding rocks with various strengths, breaking degrees are to be met therein

    在長深埋隧施工中,由於線長,涉及圍巖種類繁多,巖石強及破碎程不同,且埋深不一,採用單一施工方法可能很滿足施工需要。
  8. The ordovician carbonate reservoir in tahe oilfield is characterized by deep buried depth, multiple storage spaces, complex reservoir type, which lead to difficult reservoir simulation and performance prediction for the existing simulators are hard to simulate the dual porosity reservoirs

    摘要塔河油田奧陶系碳酸鹽巖油藏埋藏深,儲集空間多樣,儲集類型復雜,油藏模擬和動態預測,其原因主要是現有油藏數值模擬器很模擬裂縫溶型雙重介質系統。
  9. I am convinced that as long as we keep pace with the times, observe global trends from a historical height, plan for the future with the wisdom of statesman, are committed to development for the benefit of all and promote regional cooperation in a pragmatic and open manner, we can surely overcome difficulties and roadblocks on the way and make new progress as we work for peace, development and prosperity in east asia

    我堅信,只要我們站在時代前沿,以歷史眼光察世界勢,以戰略家智慧謀劃未來,以互利共贏精神致力於發展,以務實開放推進區域合作,我們就能克服前進道路上險阻,不斷譜寫出本地區和平、發展與繁榮新篇章。
  10. Which often produces some unexpected problems, such as prolonging time limit of project, increasing engineering quantities and cost, etc. through test on the site, dynamic value analysis, finite element unit method, the paper researchs construction technology of in - situ pile, transfer theory, thickness of supporting layer of head slab and depth of pile in karst area, provides some important conclusions, directs effectively the design and construction of this kind of projects

    但因溶分佈規律性差,現有勘探手段於事先查明它準確位置及小,因而常常給施工帶來意想不到問題:工期延長、工程量增加及工程費用增加等。本文通過現場試驗、理論計算和有限單元分析,對巖溶地區鉆孔灌注樁施工工藝、荷載傳遞機理、持力層頂板厚及嵌巖深等方面進行了較為系統研究,得出了一些重要結論,有效地指導了該類工程設計和施工。
  11. Contradictions of reserve resources in shengli oil field stuck out increasingly in recent years. it is difficult to keep the constant production in this area. exploration and exploit step into the stage of finding concealed detrital or fracture and hole pools, exploiting complex pools

    近年來,勝利油區后備資源接替不足矛盾日益突出,穩產也越來越,勘探開發研究已進入尋找隱蔽油氣藏、碳酸鹽巖縫型油氣藏、開發復雜油氣田階段。
  12. Fengdu yangtze suspension bridge is characterized with out - spread overhead curved cable, tunnel - type anchorage and steel - truss stiffening girder. it is well - known for its new structure, complex technology, accurate workmanship, and difficult construction. it is valuable to review its construction method and new technique developed during construction

    豐都長江橋懸索橋具有外張式空間曲線主纜、隧式錨碇和鋼桁架加勁梁設計特點,結構新穎、技術復雜、工藝精高,施工,其施工方法和施工中開發新技術具有重要應用價值。
分享友人