電力分站 的英文怎麼說

中文拼音 [diànfēnzhàn]
電力分站 英文
substation
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • : 分Ⅰ名詞1. (成分) component 2. (職責和權利的限度) what is within one's duty or rights Ⅱ同 「份」Ⅲ動詞[書面語] (料想) judge
  • : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
  • 電力 : [電學] power; electric power電力變阻器 power rheostat; 電力捕魚 electrofishing; 電力潮流 directio...
  1. Based on the demand of power department, a full distributed multifuncitional monitoring device is studied. this instrument not only can measure the data of hydroelectric plant, but also integrate the funcition of control the dynamotor, by cooperate with the program of epigynous system, it can realization the auto generate electricity on the hydroelectric plant and ordinal startup - stop of the dynamotor. 2 furthermore, performance of integrated dft arithmetic enhances the acturacy and reliability of measure. by communication several devices can run online to be controlled dispersedly and managed centrally

    本文析了國內外水自動控制裝置的研究和發展狀況,尤其是國內小型水的自動化現狀,針對現有部門的需求,設計並實現了一種單元式的微機自動監控裝置,該裝置不僅實現了對水內各種模擬參數和數字信號的實時監測功能,還對水輪發機組進行了調控,通過與上位機處理程序的配合,可以實現水的自動發控制、機組順序啟停;在測量發機組機端壓和流參數的時候,採用32點離散傅立葉演算法( dft ) ,增加了測量的準確性和可靠性;通過通訊可以實現裝置的聯網運行,做到「散控制、集中管理」 。
  2. Along with the implementation of experiment of straight power supply to big consumer step by step, as the largest rundle hydropower station in our country, we must consider straight power supply to big consumer ( a new electric power marketing ) with the electric power of gezhouba - three gorges as an important composed part of electric power marketing, let it become to one of the important means of gaining the more benefits to our company

    直供作為一種新的營銷模式,隨著大用戶直供試點工作的逐步展開,作為我國最大的梯級,必須把三峽?葛洲壩的直供作為營銷的有機組成部,作為實現公司效益最大化的重要手段之一。論文在析了三峽區域潛在的直供對象后,提出了三峽過網直供和專線直供的思路。
  3. Through the analyze of dividing the sub - systems, interaction with environment, interaction with man and machine, a coarse - grained virtual prototype of space station has been assembled by the user model and the common model of vpm, it include environment system, dynamic system, time system, gnc system and power system. ( 3 ) the space environment model design

    通過對空間虛擬樣機系統的子系統劃、與環境的交互、人機的交互的析,採用用戶模塊和vpm系統提供的通用模塊初步組裝出一個空間的粗粒度虛擬樣機系統,包括空間環境、動學系統、時間系統、 gnc系統、系統; ( 3 )空間環境模塊設計。
  4. A ship ' s power station is a plant which generators and continuously supplies electric power to various auxiliary machinery on board and meets the electric power demands of the whole ship. normally, a ship ' s power station consists of a prime mover, generators and their ancillary equipment ( to form generators sets ) and distribution boards, being an essential part of the power system on board a ship

    船舶是產生並連續供給輔助機械及全船所需能的設備,它由原動機、發機和附屬設備(組合成發機組)及配板組成,是船舶系統的核心部
  5. Considering special form of the boiler frame, the reconstruction and enforcement method, in addition dynamic analysis are given by particular steps : establishment of the model of boiler steel frame, determination of earthquake loads and distribution form, and anti - side force system for the frame to model and analyze, involving loads on the frame and above it, earthquake loads, damping, sway control installation, hanging bar and plate beam

    考慮鍋爐構架鋼結構的特殊形式,研究並提出了鍋爐鋼結構改造加固研究方法,及動析的具體步驟:建立了鍋爐鋼結構動析模型、地震荷載析方法、建立了鍋爐鋼結構布置型式、及整個鍋爐鋼構架抗側體系模擬析方法。具體包括:鋼構架本體及構架上荷載、地震載荷與阻尼系數確定、制晃裝置確定、吊桿與大板梁簡化。
  6. Ln power system full dynandc simulation, the electric - mechanical transient processes of dynamic elements of power system should be simulated in detail, and the detailed dynandc models of mid - term and long - term processes are necessary based on the research and analysis for the ndd - term and long - term models, the dynandc models, such as thermal power plant, hydraulic power plant, nuclear power plant and the automatic generation control ( agc ), which are necessary to power syst

    系統全過程動態模擬除了需要詳細模擬系統動態元件的機暫態過程外,還要有詳細的中長期過程的模型。本文在綜合調查和析的基礎上,研究了系統全過程動態模擬所需要的火廠動系統的數學模型、水廠動態模型、壓水堆核模型以及自動發控制( agc )模型及其演算法,並在系統全過程動態模擬軟體中得到了實現。
  7. Mainly, the type of pump in the large - scale irrigation and drainage pumping station in our country is adjustable - blade propeller pump. we can regulate the pump ' s blade mounting angle following the variation of water level at the inlet and outlet of the station in order to control the discharge of pump, we also determine the number of running machines with machine ' s optimal combination. so we can reduce its energy consumption, and make it optimally and economically run

    我國大部大型排灌所安裝的泵都為可調節葉片的軸流泵,這一有利條件使我們可以根據排灌進、出口水位的變化來調節水泵的葉片角度,控制水泵的流量,併合理的確定開機臺數,通過機組間的優化組合,使整個泵的能耗最少,達到整體最優、經濟運行的目的。
  8. Firstly, the thesis briefly reviews the history of voltage and reactive power control technology, focusing on the defects of the equipment in use. then, with the theoretical analysis and the discussion on voltage and the characteristic of power system as well as the basic principle of voltage and reactive power control, the thesis makes a research on the character of voltage and reactive power control and interprets the controlling regularity of substation. in addition, with the consideration of the changes of transformer tips and the combined influence of capacity groups and reactive power and voltage, the thesis makes adjustment suggestion to the different operating - zones of voltage and reactive power

    本文從降低網損和提高變自動化水平著眼,對變壓無功控制應用方面的問題進行了研究,本文首先簡要回顧壓無功控制的發展概況,著重指出了現有壓無功控制裝置的缺陷;通過理論析,在討論系統壓、無功調節特點以及壓無功總體控制原則的基礎上討論了變壓、無功控制特性以及控制原理,給出了變壓無功的控制規律;考慮了變壓器接頭的變化及容器組的投切對無功和壓的綜合影響,針對壓、無功的各種運行控制區域給出了相應調節策略。
  9. In chapter 4, the model - building principle and calculating method of finite element dynamic analysis for large - sized assembled structure are discussed. the substructure model for hydropower house vibration analysis is established to obtain precise modal of generator floor. the harmonic vibration assumption is adopted to calculate house structure ' s dynamic response from hydraulic excitation force of hydraulic turbine generator unit

    第四章討論了大型組合結構有限元動析的建模原則和計算方法,建立水廠房振動析的下部結構模型,對巖灘廠房進行整體模態析,較準確地得出發機層樓板自振特性;同時引進簡諧振動假定,迸行了機組水振動作用下的廠房結構的動響應析。
  10. The second chapter simply introduces the development of alternate asynchronous inverter technology and retrospects some types of energy - saving systems for hydraulic elevators. then the working principles of the project are discussed and analyzed at four different working status, i. e. light load upwards, heavy load upwards, light load downwards and heavy load downwards. and the chapter focus on the introduction of structure design of pump station, calculation and type selection of pump / motor reversible units, research on oil leakage principles of accumulator circuit, design of accumulator - pump / motor pressure - energy transformer and integrated valve blocks, etc. the last but not the least, the electrical wiring of vector inverter control cabin and design of computer control and data acquisition system are introduced

    論文第二章首先簡單介紹了交流異步動機變頻調速技術的發展概況,在回顧梯液壓控制系統節能技術的基礎上,介紹了本課題研製的「採用蓄能器的液壓梯變頻節能控制系統研究」的基本原理,析了動系統在梯轎廂輕載上下行、重載上下行等四種典型工況下的基本工作狀態和工作方式;詳細地介紹了本課題節能系統液壓動的結構設計和參數設計,重點研究了液壓動的結構設計、液壓泵馬達可逆性問題及其選型設計計算、蓄能器迴路泄漏油損失機理的研究及其補償裝置的設計、蓄能器-泵馬達壓能量轉換裝置的設計、多功能集成控制閥組的設計等內容;最後簡單介紹了本課題矢量控制變頻控制櫃的外部附件氣接線、計算機控制及數據採集系統的硬體設計等內容。
  11. According to this requirement, the railway mobile digital communication system based on the gsm system for mobile communication is put forward in this paper to accomplish the data transfer between the control center and the locomotive. in this paper, the design of the ms ( the mobile station ) and the erected bs ( the base station ) out of the gsm cover is carried out. last we discuss the key techniques of the railway mobile digital communication system, the handoff and the error _ correct coding

    本文針對這種要求,在gsm移動通信系統的基礎上提出了建立機車移動數字通信網以實現機車與控制中心之間的數據傳輸的方案,設計了系統中車載移動臺、 gsm覆蓋區外自建基的基本構造,析了系統中越區切換、糾錯編碼等關鍵技術,並詳細的闡述了其實現方法。
  12. The engineer of the electric power science academy tested the harmonic occurred in 220kv transformer substation in baishiyan 、 110kv transformer substation in nantupo 、 110kv transformer substation and converting station in 821 factory. this article analyzed these data particularly. the three - phase commuted device of 821factory is one of the main harmonic in the power supply & transmit electricity system in guangyuan

    四川公司諧波監測對廣元業局所屬的袁家壩220kv變、白石巖220kv變,新廣興220kv變,懶土坡110kv變,廣興鋁廠110kv變,八二一廠110kv變及整流進行了諧波測試,本文對其測試結果作了較為詳盡的析。
  13. Environmental and testing requirements for communications networking devices in electric power substations

    電力分站中通信網路設備的環境及測試要求
  14. The southern kerbside lane of westbound po kong village road opposite to china light power sub - station

    (二)蒲崗村道西行的南面路旁中華電力分站對面;
  15. The southern kerbside lane of westbound po kong village road opposite to china and light power sub - station

    (二)蒲崗村道西行的南面路旁中華電力分站對面;
  16. Example of such installations are high voltage switchrooms and substations of a large commercial complex

    這類裝置的例子:大型商場內的高壓開關房及電力分站
  17. The access road between the diamond hill funeral parlour and the china light power electric sub - station ; and

    (二)介乎鉆石山墳場與中華電力分站之間的通道;及
  18. The metered parking spaces between the diamond hill funeral parlour and the china light and power electric sub - station will be temporarily suspended on the above dates

    介乎鉆石山墳場與中華電力分站之間的所有咪表泊車位將暫時封閉。
  19. The metered parking spaces between the diamond hill funeral parlour and the china light power electric sub - station will be temporarily suspended on the specified dates

    介乎鉆石山墳場與中華電力分站之間的所有咪表泊車位將暫時封閉。
  20. The metered parking spaces between the diamond hill funeral parlour and the china light and power sub - station will be closed to all vehicles, except for those belonging to the two venues

    (二)除了鉆石山殯儀館和中華公司的車輛外,其他車輛不準進入介乎鉆石山殯儀館和中華電力分站的一段停車場;
分享友人