電力線路工 的英文怎麼說

中文拼音 [diànxiàngōng]
電力線路工 英文
electric power lineman
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • : 1 (道路) road; way; path 2 (路程) journey; distance 3 (途徑; 門路) way; means 4 (條理) se...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • 電力 : [電學] power; electric power電力變阻器 power rheostat; 電力捕魚 electrofishing; 電力潮流 directio...
  • 線路 : 1. [電學] circuit; line 2. [交通運輸] line; route
  1. Aiming at the problem that existence in the monitoring of simulate disk in local power grid, to enhance the level and efficiency of the electricity dispatch, to improve operation procedures, to change the troublesome work about 6kv line simulation disk, 35kv transformer substation and 6kv substation host cording diagram revision and maintenance from man - power, manual promotion to direct - viewing, real - time and work flow high automation level

    針對地方網「模擬盤」監視中存在的問題,為提高調度作水平和效率,完善操作規程,把煩瑣的6kv模擬盤、 35kv變所和6kv配所主結圖的修改和維護作從人、手動提升到直觀、實時和作流程高度自動化水平,實現調度日報、月報及日常管理實現規范化、自動化。
  2. In the brief introduction to geographical information system ( gis ), this dissertation proves that by combining reliable management with gis technology, presents a method which built the power structure model and math calculation model by using spatial data in a good interface between computer and user. this dissertation makes a number of target for calculating the distribution system, mainly aimed at circumstances which have an effect on power station repair, switch breaker, type of t connection, and double lines supply via the usage of system reliability calculation. at the same time, it provides the projected estimatio n when power station or transmission line will be added into the power system, and furnishes the theoretical information that the professional needs for power structure programming, design and equipment management

    通過建立輸變設施管理信息系統( mis ) ,真實地反映出油田網輸變設施的運行管理現狀,為網可靠性計算提供可靠的計算依據;在簡述地理信息系統( gis )技術的基礎上,論證了可靠性管理與gis技術結合的可能性,創立了在簡潔的人機圖形界面下利用空間數據建立網結構模型及可靠性計算模型的方法;通過建立網可靠性計算系統,進行了計及變所檢修影響、切換開關、 t接點及雙回情況下的可靠性指標計算分析,對油田網及變所()的改(擴)建方案、增強性措施及接入系統的可靠性給予了程評估,為網規劃、設計及日常的設備管理提供分析決策依據。
  3. Operation code of cross power transmission line in installing the conductor

    跨越規程
  4. Benefit from the rapid growth of domestic power line communications network, we are committing to manufacture, sales and research of cable anchoring and control hardware and systems for opgw and adss optical fiber. in order to satisfy the growing demand from domestic and overseas customers, we succeed in designing patented series products of anchoring system for both optical fiber and communication power line by absorbing international advanced technology and procedure

    公司著眼于行業的高速發展,長期致於opgw和adss特種光纜及纜的預絞絲配套安裝金具產品的開發生產和銷售,並結合國內外用戶的實際需求,引進和吸收國內外先進的技術藝,成功研發出自主知識產權的全系列光纜配套金具和用螺旋預絞絲導金具。
  5. The company has products of all specifications and its major products are overhead insulating fittings, cold - heat shrinkable cable accessories, power line fittings, cold - pressed wiring terminal, cable branch cases, box - type transformer substations and tools, including more than 10 categories and 2000 kinds of product specifications

    公司產品規格全,主導產品為架空絕緣金具,冷熱縮纜附件,金具,出口冷壓接端頭,纜分接箱,箱式變站,施具等10多個類別, 2000多個品種規格。
  6. The old two dimensional gis has been used widely in the power systems and become more functional. but its traditional means of using symbols to express buildings and geographic environment does n ' t simulate the true terrain near the power lines and electric facilities, and does n ' t give the maintenance men the true information of their working surroundings

    傳統的二維的企業地理信息系統已由技術研究階段進入大規模使用階段,功能日益完善,但是其簡單的幾何圖形加註記的形式不能真實的反映、設備設施周遭的地形地貌,不能為、設備的巡視、檢修人員提供真實的作環境信息。
  7. In carrying out electrical maintenance work for window type air - conditioners, registered electrical workers should follow the requirements specified in the code of practice for the electricity ( wiring ) regulations

    作為注冊程人員,在進行窗口式冷氣機的氣維修時須依從《)規例作守則》的規定。
  8. It can undertake the construction of building for civil use ( below 6 story ) and industry workshop ( within 18m span ), and deal with other business, such as decoration, elecinstallment, equipment installment, paint anticorrosion, and boiler clean

    能承接六層以下民用和18米跨度以內的業廠房建築程,同時還可承攬與建築相配套的內外裝修,纜、安裝,機設備安裝,金屬結構製作安裝,油漆防腐,鍋爐清洗維修等程。
  9. Code for construction and acceptance of 110 kv over - head electrical power transmission

    架空及驗收規范
  10. Verification of extraneous conductive parts in response to trade enquiries, we take this opportunity to explain one of the determination methods for extraneous conductive parts and their bonding requirements as specified in the code of practice for the electricity ( wiring ) regulations ( cop ). the provision of equipotential bonding can effectively reduce the risk of electric shock arising from faulty electrical installations

    本署收到多宗業界關于確定非氣裝置金屬部分及其等位接駁的查詢,我們希望藉著今次通訊,向大家講解測定非氣裝置金屬部分的一種方法及其在《)規例作守則》 (下稱作守則)中的等位接駁要求。
  11. Then, it analyzed can and canopen application layer, including : real - time characteristics of can, the core of canopen - od, all kinds of communication objects, the allocation of cob - id and some device profiles. and xcanopen was brought forward for implementing of canopen in power line communication. then, on the reference design platform of freescale - agilent, xcanopen ’ s two standard software interfaces, bottom driver and function of communication and network management based on canopen were implemented

    本文詳細分析了低壓通信數據機的結構與作原理;分析了can協議及其可以保證數據實時可靠傳輸的實質,剖析了應用層協議canopen ,著重解釋了canopen的核心?對象字典od 、各類通訊對象、標識符的分配,以及一些設備子協議( deviceprofiles ) ,並提出了在通信上實現canopen的解決方案? xcanopen框架;在基於freescale - agilent通信的參考設計平臺上實現了xcanopen的兩個標準軟體介面,通信底層驅動軟體的設計以及基於canopen協議棧的節點通信和網管理功能,達到了使用canopen協議來實現通信的標準化模塊的目的;最後,在canopen數據通信的實時調度上做了進一步的改進探索研究。
  12. Hunan electric power line equipment & materials factory was found at 1958, meanwhile belong to hunan electric power bureau, and now is a company of hunan electric power company. the staple are iron tower used under 500kv electric power transmission line and microwave communication, cement pole and electric fitting

    湖南器材廠成立於1958年,當時隸屬于湖南省機業局,幾經變遷現為湖南省公司全資子公司,主要產品為500kv及以下輸和微波通訊鐵塔、水泥桿、金具。
  13. Code for construction quality checkout and evaluation of 110kv 500kv overhead transmission lines

    110kv 500kv架空電力線路工程施質量及評定規程
  14. But affected buy plan economy way, hunan electric power line equipment & materials factory haven ’ t research on iron tower product marketing : research on electric power build environment and policy ; forecast of iron tower product market capacity and market prospect in coming 5 - 10 years or far. thereby is lack of integration think about iron tower product marketing strategy. in this thesis, the author coalition strategy, management, marketing and finance knowledge, on the base of economy, policy, technology macro … environment and produce, technology, manpower, finance ability, corporation culture, marketing manage way micro environment assay, exert swot way, discovery the strengths 、 weaknesses 、 opportunities and threats on hunan electric power line equipment & materials factory iron tower product

    在本文中,作者結合所學習的戰略管理、營銷和財務知識,在湖南器材廠鐵塔產品市場競爭的經濟、政策、技術和行業等外部和生產規模、技術能、人資源、財務能、企業文化、營銷管理模式等內部環境進行粗略分析基礎上,運用swot方法歸納了湖南器材廠鐵塔產品營銷的政策、歷史悠久、品牌知名度和美譽度高、技術積累、文化等方面的優勢和體制約束、生產規模和生產能偏小、資金周轉困難、鐵塔加成本過高、營銷管理模式等方面的劣勢,以及經濟發展和技術革新帶來的機會和體制改革和新的加藝帶來的威脅,根據企業的營銷戰略目標,進而提出了相關的鐵塔產品組合、產品包裝和服務策略、價格策略、渠道策略和顧客關系、供應商關系和同行關系等關系營銷策略和具體實施,並制定其營銷實施方案。
  15. To conduct engineering by putting any part of lifting machinery into the overhead power line protection zones

    (二)起重機械的任何部位進入架空保護區進行施
  16. To meet the needs of teledata transit, the digital transmitting techniques are applied to the system, the power line carrier wave tele - circuit with a bus transfer interface is supplied, and what ' s more, a detailed introduction is given to illustrate the operation

    為了滿足遠距離數據傳輸的需要,將載波數據傳輸技術應用於冷庫溫度檢測系統中,並設計了帶有總轉換介面的載波通信,闡述了其作原理。
  17. A more detailed description of the above two requirements is given in annex 1 together. 5. 2 you shall also note that under section 19 to 22 of the electricity ( wiring ) regulations, the work completion certificate ( form wr1 ) and the periodic test certificate ( form wr2 ) issued by you shall be supported with the relevant test records, plan and other documents

    2茲請留意在《)規例》第19至22條下,閣下所簽發的完證明書(即表格wr2 )及定期測試證明書(即表格wr2 ( a ) )必須存備有關的測試記錄、圖則及其他文件作為證明。
  18. It sets out the legal framework encompassing all the areas within which the concerned legislation shall apply, including the registration of electrical workers and contractors, the safety standards and requirements for electricity supply, electricity supply lines, electrical wiring and products

    該條例訂立法律架構,涵蓋有關法例適用的范圍,包括程人員及業承辦商的注冊,以及供應、供纜、氣產品的安全標準和規格。
  19. Measurement of power frequency electric and magnetic fields from ac power lines

    交流電力線路工業頻率場和磁場的測量方法
  20. Failure to ensure that safety precautions were taken to prevent danger arising from electrical wiring work done by him or under his supervision, in contravention of regulation 4 ( 7 ) of the electricity ( wiring ) regulations

    未能確保採取安全預防措施,以防止所從事或在督導下從事的安裝作發生危險,違反了《)規例》第4 ( 7 )條的規定;
分享友人