電廠裝機容量 的英文怎麼說

中文拼音 [diànchǎngzhuāngróngliáng]
電廠裝機容量 英文
power plant unit capacity
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : 廠同「庵」 (多用於人名)
  • : Ⅰ名詞1 (服裝) dress; outfit; attire; clothing 2 (演員的化裝品) stage makeup and costume Ⅱ動詞...
  • : machineengine
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • 電廠 : [機械工程] electric power plant; electricity generating station; generating station; power plant;...
  • 裝機 : airloading
  1. The annual productive capacity of the major products are : 13. 8 thousand tons of melamine, 400 thousand tons of urea, 100 thousand tons of calcium carbide, 4000 tons of dicyanamide, 11 thousand tons of white carbon black, 10 thousand tons of edible liquid co2, 20 thousand tons of calcium cyanamide, 30 thousand tons of methanol, 10 thousand tons of formaldehyde, 50 thousand tons of n. p. k. compound fertilizer, 200 tons of guanidine nitrate and 500 tons dissolved acetylene. the calcium carbide is the fine quality product awarded by the state

    主要產品生產置能力為:年產總氨28萬噸,實物尿素45萬噸三聚氰胺1 . 35萬噸精甲醇3萬噸食品二氧化碳1萬噸石10萬噸石灰氮2萬噸雙氰胺4000噸溶解乙炔500噸甲醛5萬噸白炭黑1 . 2萬噸熱電廠裝機容量3 . 6萬千瓦,年發3億千瓦時,供熱450萬吉焦耳加工2000噸綜合復混肥5萬噸。
  2. The lfg collection and utilization is company know how that is demonstrated at a site in meizhou, guangdong province that currently collects 2000 m3 hr of gas and treats all the leachate from the site, 2 mw electrical power plant will be installed on the site to utilize the collected gas soon

    該技術在中國梅州市進行了試點,現回收沼氣能力為2000立方米小時,同時循環處理該填埋場的全部滲濾液,並計劃近期在該填埋場建設2兆瓦的發,使用回收的沼氣發
  3. The taizhou power plant with an installed gross capacity of four million kilowatts is a key project

    泰州是國家「十一五」重點建設項目,規劃400萬千瓦。
  4. The background of this dissertation is based on a project of researching and developing a high voltage series h - bridge multilevel converter, which drives an induction motor of 6300v, 2240kw for driving a water flooding pump in taigang. the research work on high voltage high power series h - bridge multilevel converter has been carried out by theory analysis, computer simulation and experiments

    本文以太鋼某額定功率2240kw ,額定壓6300v注水泵變頻調速科研工程為背景,從理論分析、計算模擬和置實驗幾方面入手,對高壓大串聯h橋多平變頻器的理論和工程應用技術進行較深入研究。
  5. There is abundant power supply in yangquan area with low power price. there are also 3 power plants in ycg with total installed capacity of 106 mw. there is also reliable water and steam supply

    本地區力充足,我集團公司擁3座自備,總10 . 6萬kw ,且價較低供水供汽均有可靠的保障。
  6. In this article, a 74500dwt bulk carrier being built in our shipyard is taken for example. based on the calculations for the capacity required, two generator sets and a shaft generator are arranged for the power station on this ships. analyses are made on different units of each generator set, and some reliability tests have been carried out at the same time

    本文通過對工建造的74500t散貨輪的計算,配置了兩臺柴油發組,並在主的後部中間軸上安了一臺軸帶發,並對各發組的各個環節進行分析,進行必要的可靠性試驗,並確定運行過程中的維修方案,從而確保船舶站的正常可靠運行,而簡單的操作方法、簡便的維修、運行的低消耗,體現了該船舶站的實用性。
  7. Nuozadu hydro - electrical power station, which is 261. 5 m dam height and 5, 850 mw installed capacity, is planned to build on the middle - lower reaches of lancang river near shimao city, yunnan province. it is planned to adopt rockfill dam and underground powerhouses in the left bank. the underground cavities mainly include three large cavities

    瀾滄江糯扎渡水站擬建壩高261 . 5m ,5850mw ,採用左岸地下發系統,由主房、主變室、尾水調壓室以及尾水洞等構成龐大而復雜的地下洞室群。
  8. It has a raw coal productive capacity of 450, 000 t / a, a gangue power plant with an installed capacity of 7000kw, a 300, 000 t / a coal washing plant ( to reach 900, 000 t / a till 2006 after alteration and expansion completed ), a screen mesh plant with an annual productive capacity of 1000 m2 etc

    原煤生產能力為45萬噸/年,擁有7000千瓦的煤矸石、年入洗能力30萬噸/年的洗煤( 2006年改擴建工程完成後將達90萬噸/年) 、7000千瓦的煤矸石和年生產篩網1000平方米的篩網等生產單位。
  9. This machine adopts a whole stainless steel packing, the temperature is a number to show automatically control, heat or reduce the heat to all have a signal beacon manifestation, the electric current electric voltage size switches on to all have a manifestation, automatically feeding powder can adjust soon, spread to move part is the bean that the my plant produce product machine appropriation decelerate machine, electrical engineering is the steel plate adjustable type, the machine bottom use of upscale run a round, easy to ambulation, cool off part is automatically circulating water device, the bottom establishes keep of big capacity water tank and heat part is heat preservation economy energy type, normal production can economy in electricity quantity of 30 %, in fact use electricity charges and burn coal basic hold even

    採用全不銹鋼包,溫度是數顯自動控溫,加溫或降溫均有信號燈顯示,壓大小開均有顯示,自動喂粉可以調速,傳動部分是本生產的豆製品械專用減速架是鋼板可調型,器底部用的高檔跑輪,便於移動,冷卻部分是自動循環水置,底部設有大的儲水箱,加溫部分是保溫節能型,正常生產可節約用的30 % ,其實用費和燒煤基本持平。
  10. Hebi power plant 2 x 600, 000 kwh of power plant construction started construction phase, 2 x 13. 5 kwh cogeneration project is to be completed, and at that time the generating capacity will reach 260 million kilowatts

    鶴壁2 60萬千瓦時的三期工程已開工建設, 2 13 . 5千瓦時熱聯產項目即將完工,屆時全市發將達到260萬千瓦。
  11. Key siemens projects in zhejiang includes ultra supercritical steam turbine power plant in yuhuan, container capacity upgrade for beilun container terminal phase iv of ningbo port, advanced imaging system for zhejiang people ' s hospital and turn - key project for the hangzhou qige waste water plant, to just name a few

    西門子在浙江的主要項目包括:玉環超超臨界汽輪組,寧波港北侖四期集箱碼頭集升級,浙江省人民醫院先進的影像系統以及杭州市七格污水處理的整體承包工程等。
  12. Thermal power plant of tianfu co. ltd. which is established in 1985 has a electricity capacity of 51mw and a 485t / h steam capacity through three stage constructions

    天富熱股份有限公司熱始建於一九八五年,歷經三期建設形成51mw的發,鍋爐總計485t h的蒸發
  13. So far, the thermal power capacity occupies 75 % of the nation total power supply. by predicting that the thermal power with coal will still be the main part of our country ’ s electric power supply during a quite long period

    目前我國發中,火力發約占我國總的75 % ,並且在相當長的時間內,這種以煤為主的力能源結構不會發生根本的變化。
分享友人