電樞運行 的英文怎麼說

中文拼音 [diànshūyùnháng]
電樞運行 英文
armature travel
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : 名詞1 (門上的轉軸)door hinge:流水不腐 戶樞不蠹。 running water is never stale and a door hinge ...
  • : Ⅰ動詞1 (物體位置不斷變化) move; revolve 2 (搬運; 運輸) carry; transport 3 (運用) use; wield...
  • : 行Ⅰ名詞1 (行列) line; row 2 (排行) seniority among brothers and sisters:你行幾? 我行三。where...
  • 運行 : move; be in motion; run; working; machine run; operation; corotation; propulsion (影片)
  1. In this paper, the deposition evolution process in qtx reservoir are studied, the incoming water and sediment, the operation data, and the time and space distribution of longitudinal and lateral sedimentation in reservoir are analyzed in detail, and the longitudinal scouring and sedimentation and lateral deformation law in reservoir tidal flat and mainstream under different operation way are summarized in every operation period

    本文以黃河青銅峽水利水紐工程水庫淤積演變過程為研究對象,對青銅峽水庫來水來沙組成、水庫資料、水庫縱橫向泥沙淤積時空分佈等進了較詳細的分析,總結了青銅峽水庫各個時期不同方式下水庫灘槽縱向沖淤和橫向變形規律。
  2. Tangyin substation is an important substation which has two transformer of 120mva, eight 220kv lines and three 110kv lines. tangqian line is a 110kv line specially for traction transformer substation. because traction load is high - power nonlinear and asymmetry. it will produce much harmonic and negatvie sequence current, which have done harm to compensation capacitors of tangyin substation. in recent years, the tang6c capacitor often interrupted and in 2001 july the tang7c capacitor ' s discharge pt exploded

    湯陰變站是豫北一座紐變站,有2臺120mva的主變, 8條220kv線路和3條110kv線路,其中的湯牽線是專為牽引變站供的110kv線路。由於力機車屬于大功率的非線性負荷,且三相不對稱,在其過程中必然會產生較大的高次諧波和負序流。
  3. According to the experience of electromechanical equipment management of dayuandu navigation - power junction on xiangjiang river of hunan province, this paper probes into the significance and methods of whole - process management of hydropower & navigation and power generation junctions from design, manufacture and installation to operation and maintenance

    摘要基於湖南省湘江大源渡航紐機設備管理的經驗,探討水、航紐工程設備從設計、製造、安裝到、維護實施全過程管理的意義及方法。
  4. With the development of power system, on one hand, the capacity of the power system is increasing very rapidly and the system current becomes larger and larger. on the other hand, with the optimization of the administration and allocation of the power energy, the traditional ct can ’ t meet the demand. our company ’ new product ( vsm ) is very urgent to develop a new type of ct to meet such requirement

    現代力系統的容量在不斷加大,系統流值不斷增加;並且對力系統的輸配自動化要求也越來越高,需對力系統的在線監測、實時控制、故障預測、保護、通訊等,傳統的流互感器越來越難以滿足力系統的發展,因此,在力控制保護和監測中起紐作用的流傳感器提出了小型化、高可靠性、智能化的要求。
  5. According to recording data of higher level monitor and control system when main motor drive system for four - high medium plate mill is operated, and relation between armature voltage of dc electromotor and ac input voltage of inverter, trip cause of dc fast automatic switch was analyzed in detail, and specific countermeasure and measures are given

    根據中板四輥軋機主機傳動系統時的上級監控系統記錄數據,以及直流壓與變流器交流側輸人壓的關系,詳盡地分析了直流快速自動開關跳閘故障原因,並提出具體的對策及措施。
  6. The power angle characteristics are acquired and compared with the unsaturated curves. it is concluded that the stability limit of the power angle is less than 90 degree. reactive power regulating curves are calculated and compared with those curves when saturation effect is not considered, the result is that u type curves are deviated to the right

    通過對同步發機各種曲線的計算,在已有文獻的基礎上更進一步分析了鐵磁材料飽和以及磁場畸變對同步發特性和參數的影響;求出了空載特性曲線和零功率負載特性曲線,在不同的流下計算得到的波梯抗不同;求出了功角特性曲線,與不計飽和時的功角特性曲線相比較,功角穩定極限小於90 ;求出無功調節曲線,與不計飽和時相比較, u型曲線向右偏移。
  7. This thesis takes the resettlement action of zhuzhou hydropower junction as a project, and makes the use of the project management theory, the fundamental principal of project post - assessment and the sustainable development theory, and builds up the principals and standards of the resettlement, and analyzes the concrete content of post - assessing the resettlement project, and designs the sustainable post - assessment index body, and lists the computer formula of the quantitative index, and makes the use of ahp and lfa to post - assess the resettlement project. we obtain the conclusion that the sustainability of resettlement project is not in good state. in order to improve it, this thesis digs the passive elements, and supplies some suggestions to sustain the sustainable development of the resettlement project, such as increasing investment, carrying out the agriculture economy industry of resettlement district

    本文將株洲航紐工程移民工作看作成一個項目,用項目管理和項目后評價的基本原理,結合可持續發展理論,建立了移民項目可持續后評價的原則和標準,分析了移民項目后評價的具體內容,設計了移民項目可持續后評價的指標體系,列出了定量化指標的計算公式,並探討用層次分析法和邏輯框架法對移民項目的可持續進后評價,后評價得出的結果表明株洲航紐工程移民項目的可持續性處于次強狀態,為增強該項目的可持續性,本文通過研究挖掘出影響該項目可持續性的負面因素,提出了一些保持移民項目可持續發展的對策和建議,例如增加移民安置的投入、實移民安置區的農業經濟產業化等等。
  8. Quantity of generating electricity should be also calculated while the river inflow, quantity of water transfer and its duration curve are taken into account. as a company, it is necessary to take a series of measures to increase its benefits while water transfer leads to the decrease of hydro power inevitablly. the efficient methods can be taken into account as follows : i ) to improve the forecast accuracy, to decrease surplus water, and to increase seasonal electricity energy, ii ) to raise the peaking ability of dan jiang kou power station to obtain peaking benefits, iii ) to choose a suitable site to construct a pumped storage plant for peaking benefits

    在進以上四方面內容深入探討的基礎上,論文針對丹江口水利任務、方式的重大變化,提出漢江集團應採取以下因應措施以適應企業產業結構的調整,這些措施包括:準確計算發效益減少值;合理地核算水源的供水成本;以上述兩項計算成果為基礎,核算企業結構調整后總效益變化量;提高預報水平,減少棄水量,爭取增發季節性能;研究新的調度方式,提高站調峰能力,提高站的容量效益;在適當的地點修建抽水蓄能站,提高站的調峰能力。
  9. The overall plan for xiaolangdi project management zone is carried out to ensure the safe operation of hydraulic constructions in the zone, to make full use the advantages of location and resources of the area, and to realize the general objective of “ mainly aim at flood prevention including ice flood prevention and sedimentation reduction, and give consideration to water supply, irrigation, power generation, storage of clear water and discharge of sediment flow, alleviating disaster and bringing about benefit, and comprehensive utilization ", for the project development

    為確保小浪底水利紐工程管理區內水工建築物的安全,充分發掘管理區的區位優勢和資源優勢,實現「防洪(包括防凌) 、減淤為主,兼顧供水、灌溉、發、蓄清排渾、除害興利、綜合利用」的工程開發總目標,對工程管理區進了總體規劃。
  10. There are four main parts in the paper, i. e. first of all, the dissertation studies the steady - state performance of repmsm with the theory of vector graph and equivalent electro circuit. characteristic of power angle, determinant of static of motor moving, losses and armature reaction are analyzed in this part

    論文研究稀土永磁同步動機的穩態性能,結合向量圖和等值路理論對稀土永磁同步動機穩定了深入細致的分析,包括功角特性,狀態的判定,損耗和反應等稀土永磁同步動機自身具有的特點。
  11. The operation reliability of the power transformer as the key equipment in electrical power systems, influences operation security of electrical power systems directly. the components and contents of gases dissolved in transformer oil can be used to reflects internal insulation faults of operating transformer. in order to overcome the errors caused by complex handling procedure and man - made factors using general chromatogram analysis method, author brings forward an on - line detecting of gases dissolved in transformer oil by using macromolecule polymer to separate oil and gases automatically and an information fusion technology of multi - sensors ; at the same time, in order to improve the accuracy and reliability, author uses neural networks to diagnose transformer faults

    變壓器作為力系統的紐設備,其可靠性直接影響力系統的安全;變壓器油中溶解氣體的成分和含量能有效體現變壓器內部的絕緣故障情況,為解決常規色譜分析中復雜的操作程序和由於人為因素引起的較大的誤差,論文提出了應用高分子聚合膜實現變壓器油氣自動分離、多傳感信息融合技術智能檢測多種氣體成分的變壓器油中溶解氣體在線監測技術,應用神經網路智能診斷方法實施故障診斷,提高變壓器故障診斷的準確性和可靠性。
  12. The motor ' s magnetic field is analyzed with finite element method ( fem ) by ansys software. the emf and electro - magnetic torque are calculated with path method base on the air gap magnetic flux density ( b )

    用有限元分析軟體ansys對機內部磁場進模擬分析,得出機內部磁場磁密及磁場強度分佈情況,在此基礎上用路徑法對動勢、磁轉矩等磁參數進了分析計算。
  13. The paper analyzes and researches the operation modes in the initial operation period of letan hydropower station and under the conditions of normal operation, on the premise of ensuring pivotal project and units to be safe and stable, the modes call hydropower station into full play in the systems and improve power benefit

    摘要對樂灘水站初期及正常情況下的方式進分析研究,使其方式在確保紐工程和機組的安全、穩定的前提下,充分發揮站在系統中的作用,提高發效益。
  14. The bingling ( si gou xia ) hydropower station is a series of power stations on the yellow river, in order to the expropriation and the emigration be reduced, after studied the relation of water level and flux of the bingling hydropower station on the taping dam location, under the different running circumstances of the liujiaxia reservoir, to located the bingling hydropower station on the head of the liujiaxia reservoir, and keeping the total installation and the generated energy not be changed all made use of the floodwater of the liujiaxia reservoir

    摘要黃河炳靈(寺溝峽)水站是黃河幹流上的一個梯級站,為了減少征地移民損失,經對炳靈水站(塔坪壩址)尾水斷面在劉家峽水庫不同方式下的水位與流量關系進分析研究,在總裝機和年發量基本不變的情況下,充分利用劉家峽水庫汛限水位,將紐選址在其站庫尾內。
  15. Abstract : the administrative organization for dayuandu junction, the characteristics and objective of power station administration, as well as production preparation and operation management of hydropower station are introduced, and suggestions on further strengthening and improving administration are advanced

    文摘:介紹大源渡紐的管理機構;站管理的特點和目標,以及水站的生產準備和管理情況,提出進一步加強和改進管理的建議。
  16. The operation reliability of the power transformer, which is the major equipment in power system, directly related to the safety and stability of whole power system

    變壓器作為力系統的紐設備,其可靠性直接關繫到力系統的安全與穩定。
分享友人