電模型試驗 的英文怎麼說

中文拼音 [diànxíngshìyàn]
電模型試驗 英文
electric study
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : 模名詞1. (模子) mould; pattern; matrix 2. (姓氏) a surname
  • : 名詞(古代占卜用的器具) astrolabe
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  • 模型 : 1 (仿製實物) model; pattern 2 (制砂型的工具) mould; pattern3 (模子) model set; mould patter...
  • 試驗 : trial; experiment; test
  1. On the basis of collecting and arranging a large amount of projects experience, conbined with construction diversion flood passing measures design and hydraulic model test of lihua hydraulic pawer station in 1995 and 1996, the dissertation studies the issues related with characteristics of concrete face rockfill dam including the selection of construction diversion flood passing standard and measures, flood passing during construction period and embankment stage, coffer dam design, construction scheme and general schedule etc. and present preference for project construction

    本文在搜集整理大量工程經的基礎上,結合蓮花水站在1995年及1996年導流渡汛工程措施設計及水工,對混凝土面板堆石壩的導流渡汛標準、導流方式及其選擇、施工期渡汛及壩體填築分期、圍堰設計以及施工方案及總進度等與混凝土面板堆石壩特點有關的問題進行研究,為工程建設提供一定的參考。
  2. This is a distributing trend. all that account for that the project have quite obviously advantage. form the experiment of different density stream, the stream come into being is quit possibly. can the sandiness move to the dam and expel from the reservoir suppend on some complications

    在壩前局部中,方案二的出庫含沙量平面上呈底孔大、廠和取水口小的分佈趨勢,而初設方案運用則相反,說明方案二具有較明顯的優越性。
  3. 2. based on the results of experimental data of the tailrace surge tank of yi xing pumped - storage station in jiangsu province, this research investigates the methods for the head loss coefficients of throttled surge tank with linking pipe by means of the method which incorporates experimental results with theoretical analysis

    結合江蘇宜興抽水蓄能站尾水調壓室水力成果,採用理論計算與結果相結合的方法,對有連接管的阻抗式調壓室局部水頭損失系數的計算方法進行了討論。
  4. The water intake and outlet of power plant in tidal river bend is researched by model test with adopting w shaped rippled groove which meets the request of model roughness

    摘要進行了潮汐彎道段廠取排水,採用w形波紋凹槽方式加糙,使糙率達到了的要求。
  5. Tide control testing of water inlet model in power plant

    廠取水口潮流控制的
  6. Abstract : through a series of hydraulic model tests for researching actual power tunnel operation, a conclusion is reached that in order to get a better flow pattern the profile of the wate - carrying structure should be adapted to the variation of water streamline shrinkage, flow velocity and pressure intensity. the configuration and dimension of the kinetic energy dissipator should be selected carefully to make the water tunnel safe and reliable at different levels of diversion dischage

    文摘:針對實際工程中的發引水隧洞運行的各種工況進行了水工研究,指明要獲得良好的水流流態,過水建築物各部位結構輪廓的造應適應水流流線的收縮、流速及壓強的變化;為使引水隧洞在各級引水流量下能安全可靠地運行,需慎重確定洞內消能工的體形和尺寸。
  7. But to this day, the design of the wind turbine is still the experience method because of complex computation and device. this method is blind and uncertain

    但是到目前為止,由於計算過于繁瑣,設備過于復雜,風力發機的設計基本上還是採用經設計法,帶有很大的盲目性和不確定性。
  8. To choice good excavating scheme, this article engages in hydraulic model tests and numerical simulation on the movable bed

    為了選擇較好的清挖方案,本文對太平灣廠下遊河道進行了動床水力及動床水流數值擬研究。
  9. Inlet outlet model test of pumped - storage power stations

    抽水蓄能站進出水口
  10. Based on the moveable - bed model tests and some relative studies, it is found that the proposal reservoir for the hongshiyan hydropower station will be a heavy deposit reservoir, its sand - flushing sluice could not effectively de - silt and serious hidden - troubles exist in its diversion tunnel

    摘要待建的紅石巖水站水庫屬嚴重淤沙水庫,通過動床水工和有關研究分析發現,其沖沙閘排沙效果不理想,引水隧洞存在進沙嚴重的隱患。
  11. In chapter 3, the subgrid eddy - viscosity model for large eddy simulation is applied to calculate the three dimensions unsteady periodic turbulent flow in yantan francis turbine. the pulsating characteristics of some main physical parameters in flow field are found. the calculated axial water thrust of hydraulic turbine agrees with the model - test value

    第三章採用大渦擬亞格子渦粘,對巖灘混流式水輪機的流場進行三維非定常湍流分析,得到了流場中各物理量的脈動特性,計算出ms的軸向水推力與值大小相當;同時論證了對于下機架承重的混流式水輪發機組可採用其推力軸承負荷作為水站廠房振動的最大垂直激振荷載。
  12. This paper is focused on dynamical properties of a frame pedestal model for a 1000mw steam turbine - generator set

    對某廠1000mw汽機框架式基礎的動力特性進行了研究,並按照相似理論換算到原結構並進行了分析。
  13. In addition, the application of the present model to the " design of new sediment sluice at the taohe mouth in the liujiaxia reservoir " supports the experimental results conducted by the department of sediment research, iwhr

    在運用此對尚在立項中的「劉家峽水庫增建洮河口排沙洞方案」進行計算時,計算結果支持了中國水利水科學研究院泥沙研究所的動床物理結果。
  14. Abstract : variation of flow condition caused by the multi - pur pose regulation schemes has been investigated on the basis of measured date in r iver model. flood - control of the upper river, operation of the power - station, saf ety of the bridge and power - station, navigation and evolution of the river are a nalyzed. a reasonable and feasible project alternative and the improvement measur ement are proposed

    文摘:涪江潼南河段防洪整治是一項以防洪為主體的綜合性河岸整治工程,在平面二維數值擬計算的基礎上再進行河工,比較分析各防洪整治方案下潼南河段水流條件的變化,及其對上游防洪、河道、大橋、站、航運、河勢的影響,提出合理可行的工程方案
  15. The following results of recent researches were presented on measuring stiffness of a wide range of soils such as clay, sand and gravel, characterizing anisotropic properties of soil induced by external loading, measuring stiffness of base and subgrade materials in the pavement, determining soil properties in a centrifuge model during the flight of a centrifuge, and understanding wave propagation in granular materials under micro - gravity environment with this technique

    木文報道了壓陶瓷傳感器應用於粘土、砂和礫石等不同種類土的研究成果,對應力導致土體各向異性的研究,對路基和地基土的力學特性檢測,在離心中的應用,以及在微重力環境下的粒狀材料中波的傳播特性的研究等。
  16. Experimental study on model of jiangyin long span transmission tower

    江陰大跨越輸研究
  17. Experiment study on hydraulic model of the water intake in ash depot of thermal power plant

    廠貯灰場排洪壩進水口研究
  18. The sediment model tests for the desilting bottom intakes of two hydropower stations are introduced herein, in which a new combined type of " grid desilting gallery + desilting bottom intake " ( grid desilting bottom intake ) is put forward

    文中介紹了2個站進水口排沙底孔的泥沙情況,提出了一種新的「格柵式排沙廊道排沙底孔」的組合式(簡稱格柵式排沙底孔) ,取得了理想的排沙效果,較好地解決了工程實際問題。
  19. Trough the analysis of stabilization safety on tengzigou arch dam, some conclusions are obtained in the following : ( 1 ) tengzigou arch dam is safe under normal poll level ; ( 2 ) stabilization safety factor of tengzigou arch dam is about 4 - 5 ; ( 3 ) it is proved that combinatorial reinforcement measures are effective and feasible

    對藤子溝拱壩的數值計算和分析表明: ( 1 )藤子溝水站在正常蓄水位作用下,壩體和兩岸壩肩是穩定的; ( 2 )藤子溝拱壩的整體安全度大概為4 5左右; ( 3 )東北院提出的對左岸泥巖層挖除處理並用混凝土置換的加固除險措施經研究表明該加固措施是有效、可行的。
  20. 2 the 1 - d hydraulics computational method and 2 - d shallow water equation are employed to simulate the processing of channel dredging in tai ping wan hydroelectric power plant. the results of model tests and numerical analysis are combined and compared each other

    採用一維水力學計算方法和二維淺水方程對大平灣廠尾水河道開挖工程進行數值擬,從而使和數值擬結合起來,相互比較。
分享友人