電橋測試法 的英文怎麼說

中文拼音 [diànqiáoshì]
電橋測試法 英文
bridge test method
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : 名詞1. (橋梁) bridge 2. (姓氏) a surname
  • : 動詞1. (測量) survey; fathom; measure 2. (測度; 推測) conjecture; infer
  • : 名詞(古代占卜用的器具) astrolabe
  • : Ⅰ名詞1 (由國家制定或認可的行為規則的總稱) law 2 (方法; 方式) way; method; mode; means 3 (標...
  • 測試 : test; testing; checkout; measurement
  1. Among various fabrication techniques of thin film, the sol - gel process has gained much interest for the preparation of pzt thin film, due to ihe advantages of good homogeneity, easy control of composition, low in - ill i reaving temperature, easy formation of large area thin films pb ( zrxti : - k ) 0 :, ( pzt ) films were prepared on the ito coated glass plates and low resistor silicon wafer in sol - gel dip - coating process associated wi di heat treatment : at different temperatures and characterized by x - ray diffraction ( xrd ) and transmission electron microscopy ( tem ). lt is shown that the pzt ferroelectric thin films with ( 110 ) preferred orientation and well - crystallized perovskite structure can be obtained after annealing at 680 ? for 30 minutes on ito substrate and at 800 " c for lornin on silicon substrate

    Pzt的制備方有很多,其中溶膠?凝膠( sol - gel )方可以和集成路( ic )光刻工藝相互兼容,處理溫度低,有大面積塗敷性能,能精確地控制組分,無需復雜的真空設備,成本低廉,所以對于集成鐵薄膜容的應用這種方有很廣闊的前景。本文利用sol - gel技術在摻錫的in _ 2o _ 3透明導薄膜( ito )襯底和低阻硅襯底上成功地制備了pzt鐵薄膜。運用了x射線衍射, sawyer - tower路和lcr分別對薄膜的晶化溫度,結構和學性能進行了
  2. " field observation of high rock - fill dams and feedback data analysis " and " dynamic analysis of high earth and rock - fill dams and aseismatic measures ", the concepts and methods obtained in the above two consulting items were creative and evaluated by the ministry of electric power as being of international level. the research findings were adopted in such large - scale projects as the tianshengqiao water contral project, ming tombs water control project. dahe water contral project, ming tombs water control project, dahe water control project and lianhua water control project and awarded the second prize of scientific and technical advancement of the ministry of electric power. ( 2 ) the research on the stress - strain correlation of dam construction materials was awarded the second prize of scientific and technical advancement of the ministry of electric power. ( 3 ) the result of the field observation test and computational analysis for the tailing dam improvement project of xuzhou power plant was adopted by the east - china design institute of electric engineering with considerable economic benefit. ( 4 ) the result of the geotechnical test and data analysis of wenfu mine project was applied in the project with considerable economic benefit. ( 5 ) the field observation and data analysis of the kezier reservoir project provided a solid base for ensuring the normal operation and management of the reservoir

    「高堆石壩原位觀和反潰分析研究」及「高土石壩動力分析及抗震工程措施研究」咨詢項目提出了具有開拓性的觀點與方,經力工業部鑒定評為國際先進水平,該兩項成果已應用於天生、十三陵、大河、蓮花等大型工程獲力工業部科技進步二等獎; 「壩料土動力應力應變關系的研究」咨詢項目獲力工業部科技進步二等獎, 「徐州發廠灰壩加固工程勘驗與計算分析」咨詢成果已被華東力設計院設計采納,工程效益顯著; 「甕福磷石膏渣場工程土工驗與數值分析」咨詢成果已應用於國家重點工程甕福礦肥基地建設,效益顯著; 「克孜爾水庫工程原型觀數據庫與資料分析」咨詢項目為水庫運行與管理提供了有力保證。
  3. Measurement about the radio - frequency sensitivity of the priming system based on the bridge - wire

    基於絲式火工品射頻感度的探討
  4. It will effect the system in safety and running economy directly > test of tradition past the method is an usage to give or get an electric shock the bridge method or direct current to press to decline the method to proceed to measure, and the electric current for producing of is only in the ma class which ca n ' t broke through the oxidize surface

    高壓斷路器是力系統中最重要的控制和保護設備之一,它對系統的安全、經濟運行有著直接的影響。以前傳統的是使用或直流壓降進行量,所產生的流僅在ma級,不能擊穿觸頭氧化膜。
  5. For the convenience of test, varied circuit chip defects caused by the production process are abstracted as all kinds of models. at present the commonly used fault models mainly consist of stuck - at fault, stuck - open fault, bridge fault, store fault, delay fault, etc. testing methods based on voltage testing mainly aim at stuck - at fault model and have also obtained satisfactory result in research for many years. bridge fault is tested easily by quiescent power supply current ( iddq ) testing method. in regard to stuck - open fault that is difficult to testd by quiescent power supply current ( iddq ) and voltage testing, it can is tested by the dynamic current ( iddt ) testing

    為了便於,我們將生產過程中集成路出現的多種多樣的缺陷抽象為各種模型。目前常用的故障模型主要有:固定故障,開路故障,接故障,存儲故障,時滯故障等。主要針對固定型故障模型,多年的研究也取得了令人滿意的結果; cmos路中的接故障則宜用穩態( iddq );對于壓和穩態流難以的開路故障,可以使用瞬態( iddt )的方進行
  6. The feasibility and effectiveness of the iddt testing are both validated by experiments. at last, transistor bridging faults are simulated based on iddq testing and gate bridging faults and stuck - at faults based on voltage testing through detaching a pattern pair into two independent patterns

    最後,把一個輸入向量對看成兩個獨立的向量,分別採用穩態模擬接故障的晶體管級故障和接故障的門級故障及固定故障。
  7. According to the reality of engineering, the article makes a deep study of the electricity - magnetism detection of the loss of metallic cross - sectional area of wire rope, brings forward a designing method of lma detecting sensor based on the theory of magnetic bridge, develops out a data collecting and dealing system that is assorted to it, and accomplishes all the designing and confecting work of the hardware and software of the system

    金屬截面積損失是一種較常見且非常重要的鋼絲繩缺陷,本論文結合工程實際,對鋼絲繩金屬截面積損失信號的定量檢作了深入的研究。提出了一種基於磁路原理的鋼絲繩金屬截面積檢傳感器的設計方,研製出與之相配套的數據採集與處理的cpu系統,完成了系統各部分軟硬體的開發與調工作。
  8. In the pressure characteristic test, a new method of testing pressure difference is brought out. with an entire bridge circuit and two pressure sensors, the structure is simple but the result is of high precision

    液伺服閥壓力特性實驗中,提出利用兩只壓力傳感器通過全量差壓的新方,該方硬體結構簡單,精度高。
  9. And then, a method of load - flow low - pressure measurement was proposed in the light of the hydraulic - resistance theory of servo valve. the validity of the method was proved by the experimental results. therefore, the measurement of the characteristic of load - flow and no - load flow can be realized by using this method

    然後根據液伺服閥的液理論提出了一種負載流量低壓量方,在所開發的系統上,利用液比例閥模擬流量量裝置對所提出的方進行了驗驗證,實現了利用低壓流量計和壓力傳感器進行液伺服閥負載流量特性和空載流量特性的量。
  10. 10. 02 test methods for measurement of energy and integrated charge transfer due to partial discharges corona using bridge techniques

    接技術量由於部分放引起的能量和集成荷的轉換的驗方
  11. Summarizing the development statement of monitoring technology for bridge, based on principle of pulse laser ranger detection and fiber - optic strain measurement, in view of the problem affected by single - chip inherent feature, integrating the goodness of cpld device and single - chip, using a / d converter to measure the count quantization error, a strain measurement system is worked out. the above system chiefly consists of light source, optic fiber sensor, photo detector and signal processing circuit

    本文綜述了國內外梁監技術的發展概況,在深入研究脈沖激光距和光纖應變原理的基礎上,針對單片機固有計數頻率低、計數量化誤差大和延時不固定等不足,結合cpld計數頻率高、延時小而固定和單片機控制功能強的優勢,並採用模數轉換技術設計計數量化誤差路,提出了基於激光脈沖時間的光纖應變量的方案。
分享友人