電氣段 的英文怎麼說

中文拼音 [diànduàn]
電氣段 英文
es electrical section
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : Ⅰ名詞1 (氣體) gas 2 (空氣) air 3 (氣息) breath 4 (自然界冷熱陰晴等現象) weather 5 (氣味...
  • : Ⅰ量詞(部分) section; segment; part; paragraph; passage Ⅱ名詞(姓氏) a surname
  • 電氣 : [電學] electrical; electric電氣安裝 electric mounting; 電氣保護 electric protection; 電氣保護裝置...
  1. The control system of furnace " s temperature has been widely used in every walk of life, as an important link of repair and manufacture of the electrical equipment such as electromotor transformer etc., soaking lacquer drying craft has some especial requests on drying crafto this article starts with the analysis of drying chamber " s configuration, analyzed its configuration limitation and control function limitation according to the factory " s situation and advances the conception of heated air drying circulation, in addition, this article adopts an intellectualize a / d module, a development sampling tuning - voltage circuit, and presents the method to measure online the insulation resistance of products in order to improve constantly products quality

    而浸漆乾燥工藝作為機、變壓器等設備的修理、製造中的重要環節之一,對乾燥過程的質量要求有一定的特殊性。該文從乾燥爐的結構分析入手,聯繫到工廠的實際情況分析了結構功能缺陷和控制功能缺陷,提出了熱風循環乾燥的概念,同時,選擇了較為先進的a d板卡、熱阻信號調理板等專業化智能卡,運用數字pid控制技術,構成了一個較有特色的計算機控制系統。此外,該文還從保證乾燥品質量的角度,採用智能化交流模塊和自製采樣調壓路的方法,提出了在線檢測產修品的絕緣阻的方法和手,以確保企業產品質量不斷提高。
  2. In the end, the main content of this dissertation is addressed. in chapter 2, based on the analysis of present vibrator ' s principle and structure, two kinds of transfer functions and frequency response curves of the vibrator, driven by voltage feedback power amplifier and current feedback amplifier, are given separately. and turnover frequencies between different frequency rangs are also given

    第二章分析了標準振動臺的工作原理和結構,在此基礎上,建立了標準振動臺的機械和方程,給出了恆壓源和恆流源功放激勵下的振動臺傳遞函數及幅頻、相頻特性曲線,列出了不同頻間的轉折頻率。
  3. On the railway of electrization, power supply mode is requested to be the single - phase alternating current

    在鐵道化牽引區,牽引供網採用單相工頻交流方式。
  4. Electric road between wing hing street and yacht street ; hennessy road east of marsh road ; and tin hau temple road between fortress hill road and causeway road

    介乎永興街及帆船街之間的一道;馬師道以東的軒尼詩道及介乎炮臺山街及高士威道的一天後廟道。
  5. The integrated system of smelting reduction ironmaking - gasolinesynthesis - electric - ity generation, in which the coal gas produced inthe ironmaking module is first cleaned and then used as the fuel for theelectricity generation module or raw material of the gasoline synthesismodule, can resolve the problem of utilization of tail gas in thesmelting reduction ironmaking and the large investment of gasificationin the integrated gasification combined cycle and gasoline synthesis. taking efficiency, scale and product structure into consideration, the processes of the two - stage smelting reduction ironmaking - combined cycleelectricity generation with coal gas, the two - stage smeltingreduction ironmaking - steam cycle electricity generation with coal gas, the one - stage smelting reduction ironmaking - combined cycleelectricity generation with coal gas, and the one - stagesmelting reduction ironmaking - gasoline synthesis with coal gas - steamcycle electricity generation with tail gas are techno - economicallyfeasible and have the promise of being industrialized

    將熔態還原煉鐵產生的煤在凈化后發或經改質后合成汽油的集成系統可以解決熔態還原煉鐵的尾利用問題及聯合循環發和煤基汽油合成造投資成本高的問題.從效率、規模和產品結構各方面考慮,過程模擬結果顯示:二法熔態還原煉鐵-煤聯合循環發、二法熔態還原煉鐵-煤蒸汽發、一法熔態還原煉鐵-煤聯合循環發、一法熔態還原煉鐵-煤合成汽油-尾蒸汽發流程,有實現產業化的可能
  6. It brings substantial changes in electrical testing of generators

    為發試驗方法、手帶來了質的變化。
  7. Voltage bands for electrical installiatons of buildings

    建築物設施的壓區
  8. Voltage bands for electrical installatons of buildings

    建築物設施的壓區.第1次修改
  9. The first stage of electrification was completed with the start of an inner suburban service between kowloon and sha tin on 6 may, 1982

    首階化工程於一九八二年五月六日完成,九龍至沙田近郊線化列車正式啟用。
  10. Introduce the new construction technology, technics and methods of ohe in the electrifying project of wu - pu section, jing - guang railway, which was contracted to be construction by the electrifying project department, china railway no. 12 group, different from the technology used before

    介紹中鐵十二局集團務公司承建的京廣線武蒲山坡至咸寧化工程中所採用的與以前承建工程相比較不同的接觸網施工新技術、新工藝及施工方法等。
  11. When dicussing reliability design and reliahbaiiy ensuring methods, a new reliability calculating model of petroleum logging tools is presented, reliability assurimg technologies should be taken in petroleum logging tools and their using approaches are presented and stated from electricity design and mechanical design, reliability system model of petroleum logging tool is set up according to the latest reliability theory, reliability indexes of petroleum logging tool and their acquiring ways are discussed, the reconmended reliability indexes ( mwture, nolwnm, mtbf, mttf ) of petroleum logging tool are presented : the mean working time under rated error ( mwture ) of the new tool is obtained through experiments. when studying data processing methods, the property of gamma - ray signal is stated and the type of it ' s measuring error is examined using statistical method, the basic theory of digital filtering and the basic situation of digital filtering methods are introduced and analyzed, the factors affecting digital filtering effect to gamma - ray signal and the effect of digital filtering to logging curve are analyzed, the evaluting criteria ( rvi, rmse, sfi ) of digital filtering effect are set up from two aspects, named as real value acquiring of steady section and the formation boundary checking and processing, the related filtering methods and examining methods are given out. the design methods of digital filter used to process gamma - ray signal are discussed, the mixed filtering scheme of natural gamma - ray log is presented, the realization ways are discussed. the selective filtering system and it ' s realization flow are given out through quantitive reseaching to part of digital filters, three new filtering sheme will be used to process gamma - ray signal in era2000 logging system

    在探討可靠性設計與可靠性保障技術時,提出了石油測井儀器的可靠性計算新模型,從和機械兩個方面,提出並闡述了應採用的可靠性保障技術及其使用方法:根據最新可靠性理論,建立了石油測井儀器的可靠性系統模型,探討了石油測井儀器的可靠性指標及其獲取途徑,提出了推薦使用的石油測井儀器可靠性指標( mwture , nolwnm , mtbf , mttf ) ;通過試驗,得到了所設計儀器的穩定工作時間( mwture ) 。在研究數據處理方法時,闡述了伽瑪信號的特徵,對測量誤差類型進行了統計檢驗;介紹了數字濾波的基本理論、數字濾波方法的概況,並進行了分析;對伽瑪信號數字濾波效果的影響因素及其對測井曲線的影響進行了基本分析;從獲取平穩真值、地層邊界的檢測與處理兩個方面,建立了數字濾波效果的評價準則( rvi , rmse , sfi ) ,給出了相應的數字濾波方法及效果評價方法;探討了自然伽瑪信號數字濾波器的設計方法,提出了適合自然伽瑪測井的混合濾波方案,探討了混合濾波方案的實現途徑;通過對部分數字濾波方法的定量研究,給出了靈活可選的數字濾波系統構成及實現流程;提出的三種濾波方案,將用於era2000成像測井系統,對自然伽瑪測井數據進行濾波處理。
  12. The two rails are not only signal lines of track circuits, but also loop current line of locomotive traction current in electrified railway block

    化鐵路區,兩條鋼軌既是移頻信號的傳輸線又是機車牽引流的迴流線。
  13. Participate in preparations during electric construction, and check the construction items against diagrams

    參與施工階各項施工準備工作,並對施工項目和圖紙進行核對。
  14. The spontaneous polarity was firstly observed by electron - beam bombardment and scanning electron microscope ( stm )

    利用子束轟擊和掃描成像手,首此觀察到了石的自發極化導致的極性。
  15. A. not particularly through radio communication, except on certain wave lengths that are absorbed by the atmosphere. but as points of departure for exploration they ' ll be very useful

    答:除非用某些能被大層吸收的無線,否則在太空軌道站用無線進行通訊並不怎麼特別合適。但作為探險活動從那裡出發倒是非常合適的。
  16. A complete solution provided by schneider electric schneider electric was involved in this project at the upstream phase, schneider electric participated in adapting the lafarge standard to chinese market and work with local design institute ( di ) and lafarge technical center ( cti ) in france. schneider electric provided the mv, lv panel, mcc, automation system and monitoring system including the project management, coordination and global responsibility

    在項目的初級設計階,施耐德公司配合當地設計院及拉法基在法國的設計中心cti ,將拉法基的設計標準轉化為中國本地標準,與此同時施耐德公司提供了成套設備,其中包括中壓產品,低壓產品, mcc櫃,自動控制系統,並負責整個項目的管理及協調。
  17. A section of electric road between lau sin street and yacht street will be closed to traffic, except vehicles heading for park tower

    (七)除往柏景臺外,介乎留仙街與帆船街之間的一道將會封閉。
  18. Except franchised buses and vehicles of residents of park tower, all other vehicles will not be allowed to use the section of electric road between yacht street and lau sin street if necessary

    在有需要時,介乎帆船街及留仙街的一道將會封閉,不準車輛行駛,但專利巴士及柏景臺住客車輛除外。
  19. So, under such condition the previous motor control and electric transmission have been developed to the phase of motion control

    在這種情況下,原先的「機控制」 「傳動」已發展到「運動控制」新階
  20. While an existing product is operated at the fifth stage, the non - electric cutter can start work at the second stage

    當一些產品操作還停留在第五階時,無割機已經開始了第二階的操作。
分享友人