電滲加固 的英文怎麼說

中文拼音 [diànshènjiā]
電滲加固 英文
electro-osmotic stabilization
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : 動詞(液體慢慢地透過或漏出) ooze; seep
  • : Ⅰ形容詞(結實; 牢固; 堅硬) firm; hard; solid Ⅱ副詞1 (堅決地; 堅定地) firmly; resolutely 2 [書...
  1. Experimental research on electro - osmotic consolidation of lacustrine clay

    排水法湖相軟粘土的試驗研究
  2. The characteristic of chemical grouting material should combind with construstion method directed by the theories, it is necessity guarantee for the good result in some special cases. by cw series material, various complicated engineerings have been successfully handled, such as the treatment of concrete fine cracks in three gorges project ( tgp ), foundation reinforcement to the fault in in three gorges project ( tgp ), and the seepage control and reinforcement for the dam base of jiangya hydropower - station. these illustrations are provided to proof the advantages of modified epoxy resin and its technique

    化灌材料特性與理論指導下的灌漿工藝的全面結合是化灌處理,特別是特殊條件下灌漿效果的必要保證, cw系改性環氧化灌漿材及技術對多種復雜工況工程處理對象成功處理,解決了三峽混凝土微細水裂縫防補強、三峽工程地質斷層泥化夾層以及江埡站壩基溶蝕帶防等一系列工程技術難題,印證了該材料及技術的先進性。
  3. The chemical grouting technique is widely applied in many kinds of engineerings, such as hydropower, tunnel, subway, mineral mountain, coal, transportation. . etc. the technique has characteristics of fleetness, economy, special and dependable etc. and develop its original effect well in civil engineering of waterproofing process, treatment to leakage, structural reinforcement

    化學灌漿技術在水、隧道、地鐵、礦山、煤炭、交通等各個領域有很廣泛的應用。具有快速、經濟、獨特、可靠等特點,在土木工程的防、堵漏、補強、中充分發揮其獨到的效用。
  4. Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying, design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no. 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying, design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength, stability and thermal control problem for xi - luo - du project

    溪洛渡水站超大型地下洞室群圍巖穩定的安全可靠性分析:被成都勘測設計研究院應用於比選報告及可行性論證中; ( 2 )小關子水站攔河閘壩及地基的應力應變分析:被成都勘測設計研究院應用於地基處理方案; ( 3 )三峽廠房7 # - 14 #壩段溫控並縫措施研究:為廠房壩段並縫方案的可行性提供了依據; ( 4 )堤防工程體系的長期監控預報預警決策系統開發:為監控、預測預報堤防漏管涌破壞提供分析軟體; ( 5 )向家壩地下洞室群圍巖穩定的安全可靠性分析:被中南勘測設計研究院應用於初步設計方案中; ( 6 )靠船墩的疲勞可靠度研究:為廣東航運規劃設計院的靠船墩優化設計和提供依據; ( 7 )溪洛渡高拱壩壩體壩基(壩肩)強度和穩定的三維靜動力隨機有限元分析及可靠度計算:為溪洛渡重大工程壩體的靜動力安全穩定性及溫控方案提供依據。
  5. The yellow river water environment information management system is a computer network system covering the whole basin, the construction of which includes a computer network construction and software development. the software involves database, gis, and man - machine interface. the investment in the system is huge and the period of construction is long, thus, a good design is very important. the design schemes are summarized in this paper. according to the present computer technology, some new methods used in network design and software development are introduced, and it is suggested that expandability and opening of the system should be considered in system construction

    黃石?水站輸水渠道地處地質結構比較復雜的地方,由於渠道建成投運的時間較早,且原設計的標準較低,糙率較大.在站機組已更新改造的情況下,若不進行輸水渠道挖潛改造,已難于滿足站機組的設計流量要求.經反復比較,決定採取減小渠道糙率的方案,對輸水渠道進行三面光護面,增過流,效果很好
  6. In view of the seepage hazards existent in the homogeneous soil dam in landong reservoir and on the basis of physical property of the media and geophysical characteristics of the study area, the authors reasonably selected such geophysical techniques as high - density resistivity, ground penetrating radar, transient rayleigh wave and spontaneous polarization to make integrated exploration and find out the seepage path of water sources, thus providing grounds for evaluating stability of the dam body and designing the reinforcement plan

    摘要針對藍洞水庫均質大壩出現散等病險,根據區內各介質物理性質及地球物理特徵,合理選擇了高密度阻率、探地雷達、瞬態瑞雷波和自然場4種物探方法進行綜合勘查,查明病險的水源來向,為評估壩體的穩定性和處理設計提供依據。
  7. Abstract : in view of the seepage hazards existent in the homogeneous soil dam in landong reservoir and on the basis of physical property of the media and geophysical characteristics of the study area, the authors reasonably selected such geophysical techniques as high - density resistivity, ground penetrating radar, transient rayleigh wave and spontaneous polarization to make integrated exploration and find out the seepage path of water sources, thus providing grounds for evaluating stability of the dam body and designing the reinforcement plan

    文摘:針對藍洞水庫均質大壩出現散等病險,根據區內各介質物理性質及地球物理特徵,合理選擇了高密度阻率、探地雷達、瞬態瑞雷波和自然場4種物探方法進行綜合勘查,查明病險的水源來向,為評估壩體的穩定性和處理設計提供依據。
分享友人