電站規劃 的英文怎麼說

中文拼音 [diànzhànguīhuà]
電站規劃 英文
power scheme
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
  • : Ⅰ名詞1 (畫圓形的工具) instrument for drawing circles 2 (規則; 成例) rule; regulation 3 [機械...
  • : 劃動詞1 (撥水前進) paddle; row 2 (合算) be to one s profit; pay 3 (用尖銳的東西在別的東西上...
  • 電站 : power station電站船 generating ship
  • 規劃 : 1 (比較全面的長遠的發展計劃) planning; programming; project; schematization; programme; plan 2 ...
  1. Hydroelectric power plants ; rules for planning and operation

    .制定和運行
  2. Three steps of the method are, first, genetic algorithm is adopted in the whole planning area to hunt the possible traverse sequence of the substations ; second, the least weight match algorithm in graph theory is adopted to optimize the tie lines between each substation and its neighbors according to the traverse sequence determined in the first step ; finally, the scheme which has the least cost of investment in tie lines will be taken as the ultimate scheme

    第一層優化是在整個區域內,應用遺傳演算法搜索可能的變的遍歷順序;第二層優化是按照第一層優化確定的遍歷順序,應用綱絡圖論中的最小權匹配演算法分別對每一個變與其相鄰之間的聯絡線進行優化。
  3. Aiming at the compensation benefits calculation combined with development layout of the yellow river mainstream cascades is now taken into account the dynamic characteristic of different level years, the compensation benefit simulation model of the yellow river mainstream cascade reservoirs is adopted to calculate the power generation compensation benefits of the yellow river upstream run - of - river power stations in three level years of 2000, 2010 and 2020

    摘要針對以往補償效益的研究都是靜態計算而言,本文結合不同水平年黃河幹流梯級的滾動開發,考慮不同年代補償效益的動態特性,採用黃河幹流梯級水庫補償效益的模擬模型,計算了2000 、 2010以及2020三個水平年黃河上游徑流式梯級的發補償效益。
  4. With the further economic growth and the implement of development of the western regions, hydroelectric construction in our country is undergoing rapid growth, anumber of high - dam power - station is in building or in programming. in view of its higher - head and larger magnitude of spill structure outlet, it is difficult for conventional concrete or reinforced concrete structure of pier and pier room to support its vast water pressure. coupled with the improvement of prestressed method, it has been the noteworthy tool in solving the problem

    隨著我國經濟的加速發展及西部大開發戰略的實施,我國水事業也迎來了迅猛發展的大好時機,一批高壩水正在建設或之中,其泄水建築物孔口及水頭愈來愈大,常混凝土或鋼筋混凝土閘室閘墩結構難以承受如此之大的水推力作用,隨著預應力技術的成熟,這一技術已成為解決該問題的關鍵技術措施之一。
  5. Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying, design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no. 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying, design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength, stability and thermal control problem for xi - luo - du project

    溪洛渡水超大型地下洞室群圍巖穩定的安全可靠性分析:被成都勘測設計研究院應用於比選報告及可行性論證中; ( 2 )小關子水攔河閘壩及地基的應力應變分析:被成都勘測設計研究院應用於地基加固處理方案; ( 3 )三峽廠房7 # - 14 #壩段溫控並縫措施研究:為廠房壩段並縫方案的可行性提供了依據; ( 4 )堤防工程體系的長期監控預報預警決策系統開發:為監控、預測預報堤防滲漏管涌破壞提供分析軟體; ( 5 )向家壩地下洞室群圍巖穩定的安全可靠性分析:被中南勘測設計研究院應用於初步設計方案中; ( 6 )靠船墩的疲勞可靠度研究:為廣東航運設計院的靠船墩優化設計和加固提供依據; ( 7 )溪洛渡高拱壩壩體壩基(壩肩)強度和穩定的三維靜動力隨機有限元分析及可靠度計算:為溪洛渡重大工程壩體的靜動力安全穩定性及溫控方案提供依據。
  6. This paper firstly introduces the phylogeny and actuality of tide - power stations ; the development style of them ; and then, establishes the mathematics model of optimal regulation of tide - power stations ; narrates how to use eq, dynamic programming, genetic algorithm to solve the problem of optimal regulation of tide - power stations individually ; makes comparison of three kinds of methods, pointing out the excellence and weakness of each method ; discusses some particular problems of tide - power stations, differing from normal water power stations. besides, this paper uses vb to develop an optimal regulation software which can be used in all tide - power stations

    本論文首先介紹了世界潮汐的發展史及發展現狀;潮汐的建庫方案;然後建立潮汐廠內經濟運行和短期優化調度的數學模型;在此基礎上,進一步使用等微增率法、動態法和基因遺傳演算法來求解潮汐優化調度問題,並對三種方法作了比較,指出各自的優缺點;論文也探討了潮汐優化調度中不同於常優化調度的特殊問題的處理方法。
  7. The compressed air energy storage station and the pumped - storage station, two kinds of large energy storage systems, have the advantages of quick dynamic response, high economy, and small environmental impacts

    摘要壓縮空氣蓄能和抽水蓄能兩種大型能存儲系統,具有動態響應快、經濟性能高、環境污染小等優點,可起到負荷平衡、戰略、提高供質量的作用。
  8. The developed resource is 82, 200 kw, the investors for 10 designed hydropower stations have not yet to be practicable

    已開發建成裝機容量8 . 22萬千瓦,未落實業主的有10座。
  9. Optimal planning of high voltage distribution substations

    高壓配的優化
  10. The allocating and locating alternatively ( ala ) algorithm, is widely used to deal with sources locating problem, but it depends on the initial location to a large degree

    該方法將高壓配優化問題分為平面定位和組合優化兩個子問題。
  11. Examples show that the algorithm proposed meets the requirement of engineering and it is an effective approach to settling the problem of optimal planning for high voltage distribution substations with fast speed

    算例表明,該方法可以求得工程上的滿意解,並且計算速度快,是求解高壓配優化問題的有效方法。
  12. This paper describes a series of preliminary results in combination with actual situations of hydropower development in dadu river by means of establishing river basin water rainfall regime monitoring network, carrying out multi - link large system comprehensive dispatching study of water, electricity and network in group reservoirs, conducting the control mode study of cascade hydropower stations, power supply range and development lime sequence, planning environmental impact assessment in a river basin, as well as the dispatching patching of gongzui, tongjiezi cascade hydropower stations

    大渡河流域水開發有限公司結合流域水開發實際,通過建立流域水雨情監測網,開展群庫水、、網多環節的大系統綜合調度研究,流域梯級控制模式研究、流域供范圍及開發時序研究,流域環境影響評價研究,以及龔嘴、銅街子梯級調度實踐,在流域梯級統一調度研究方面已取得了初步的成果。
  13. ( 2 ) theoretical analysis of optimal theory for cascade hydropower station applying decision support system to carry out rational river planning in stepped exploitation includes cascade station arrangement, selecting optimal parameters of indropower station, decision of stepped exploitation order and optimal dispatching for reservoir etc. for uncertain problems, decision support system only supplies an auxiliary decision to the decision maker, not taking the place of decision maker

    ( 2 )水優化調度的理論分析在梯級開發中應用決策支持系統進行合理的梯級,包括梯級的布胃、水參數的最優選擇、梯級開發順序決策和水庫運行的優化調度等問題。在對不確定性問題上,決策支持系統給決策者只是提供輔助決策,而不是替代決策者。
  14. When the paper uses the optimization regulation, it divides the management time into " t " stages according to ten days to make up the decision having many stages of the reservoir ' s optimization regulation, and it takes the reservoir ' s retain quantity of water or retain status of water and confiscated quantity of water a s condition variable, takes the water quantity of drawing off or quantity of electricity as decision variable. when the confiscated quantity of water can be known or be forecasted in every stage during the period of management, that is to say the confiscated water process can adopt the determined process, we can make up determine dynamic plan model with many stages and take the minimal lacking water as objective function

    在動態方法中把水庫的整個調度期,按句分為t個時段,以水庫的蓄水量s或蓄水位z和入庫水量q作為狀態變量,以水庫放水量q或出力n或發量e作為決策變量,構成一個多階段決策過程,當計調度期內各時段的入庫徑流量已知或可以預報,即入庫徑流過程可以採用確定性徑流過程時,分別按缺水量d最小作為目標函數建立多階段確定性動態數學模型。
  15. Through individual the different operating modes of multi - nozzle scoop - type turbine and combined dynamic programming method, it can determine the optimal economic operation scheme for hydroelectric station

    以仁宗海水庫2臺6噴嘴水斗式水輪機組為例,通過將多噴嘴水斗式水輪機的不同運行方式個體化,並結合動態法求解,水可確定出最優經濟運行方案。
  16. Specification on compiling site selection planning for pumped storage power stations

    抽水蓄能選點.編制
  17. Guidelines of reconnaissance for rural hydropower station development program

    農村水開發選點導則
  18. With the aim of achieving the lowest system operation cost of the east china power grid, the optimal capacity of pumped - storage power stations in east china power grid is recommended

    摘要以華東網系統運行成本最優為目標,闡述了華東網抽水蓄能電站規劃研究的最優建設模。
  19. The benefits ( static and dynamic ) and economic feasibility of the pumped storage power plant is being recognized all over the world. but in china, due to the unsuitability of organization of power industry to socialist market economy, there are many disagreed knowledge to pumped storage power plant so far

    抽水蓄能是應力工業產供銷同時完成的特點而產生的一種特殊源,隨著力工業的不斷發展,它已成為力系統調峰的一個重要組成部分,其在力系統的效益及其經濟性也逐漸為世界各國所公認。
  20. In the planning of electric power network, several aspects have to be considered, such as the load forecasting, substation and network planning, reactive power install, reliability analysis in normal and emergency, short circuit current analysis, distribution automation, and so on

    是一個覆蓋面很廣的課題,其主要研究內容包括:力負荷預測、變優化、網架、配網潮流計算、無功、正常和故障狀態下的可靠性分析、配網自動化等。
分享友人