電站負荷需求 的英文怎麼說

中文拼音 [diànzhànqiú]
電站負荷需求 英文
plant load demand
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
  • : Ⅰ名詞1 (負擔) burden; load 2 (虧損) loss 3 (失敗) defeat Ⅱ動詞1 [書面語] (背) carry on th...
  • : 荷名詞(蓮) lotus
  • : Ⅰ動詞(需要) need; want; require Ⅱ名詞1. (需用的東西) necessaries; needs 2. (姓氏) a surname
  • : Ⅰ動詞1 (請求; 要求) ask; beg; request; entreat; beseech : 求人幫忙 ask sb a favour; ask a favou...
  • 電站 : power station電站船 generating ship
  • 負荷 : [電學] load; charge; weight
  • 需求 : needs; need; demand; requirement
  1. To expedite the exploitation of hydroelectric resources of huanghe upstream meets the request of western development, and is significant to the strategically overall arrangement of realizing the optimization deployment of resource and transporting clean energy to the east but, for a long time, in the electric market, the supply - and - demand analysis and the science - oriented, reliable forecast of electric network load is absent. in the developing gradation, the support of theory about hydroelectric plants " developing gradation is absent. in the pattern of management and development, a theoretical system of developing, management is absent, such as the relation of the synthetically utilization of hydroelectric development and water resource and environment should be brought into the unified planning and managing system of the valley

    但是長期以來,在力市場方面,缺乏科學、可靠的預測及市場供分析;在開發順序方面,缺乏水開發順序理論方法依據的支持,影響了開發的層次和速度;在開發管理模式方面,缺乏一套行之有效的開發、經營及管理的理論體系,比如水開發與水資源綜合利用及與生態環境的關系等,都應納入流域統一規劃、統一管理的水開發利用管理體系中。
  2. Annual synthetical cost or power loss, etc. ) with physical constraints, such as load demand, line ' s capacity, substation ' s capacity etc. as we know, it is difficult to get differential function of a nonlinear objective function, so for simplifying the problem, a layered optimal strategy for multi - constrained substation positioning is proposed

    址優化是在滿足諸如、線路容量、變容量等約束的情況下,尋優新建變的位置坐標,使某目標值(例如,年綜合計算費用、線損等)達到最優。
  3. We have designed and established data collection center exchange network of sale of the whole company, and realized transfers demand of which met six power supply bureau load management systems by using five frequency point, and succeeded in solving the problem of data collection and control management that main station of power supply bureau provided user terminals

    設計、建設了全公司營銷數據採集中心交換網,實現了利用五對頻點滿足六個供管理系統的數傳,成功解決了供局主對用戶終端的數據收集和控制管理問題。
  4. According to the characteristic of nine - area diagram of substation vol / var coordinated control, this system gives the defination of fuzzy sets and the degree of membership of input / output variables, and designs corresponding control rules. the results of simulation demonstrate the system can satisfy the constrains of the day - adjusting times of the switching of on - load transformer and paralleled compensation capacitors, and ensure voltage quality, reactive power basical balance. considering the var requirement in different load time period and the control demand in load saltation, a improved control scheme is provided. the results of simulation show the improved scheme can meet the demand of vol / var in different load time period, protect the wrong operation when either voltage or reactive power appears saltation, and decrease the times of regulation of the switching of on - load transformer and paralleled compensation capacitors finally, a background software module of substation vol / var coordinated control is designed, based on the supervisory control and data acquisition system of substation

    模擬結果證明該系統能在各種條件下確保壓合格和無功基本平衡,且能滿足變對有載調壓變壓器分接頭日調節次數和並聯補償容器組的日投切次數的限制。通過考慮不同時段對無功功率的突變情況下的控制要,對上述模糊控制策略進行了改進,模擬結果證明改進后的控制策略能滿足不同時段對壓和無功的要、抑制壓或無功突變情況下的誤動作,且有效地減少了有載調壓變壓器分接頭和並聯補償容器組的調節次數。最後基於變scada系統設計了一后臺壓無功綜合控制軟體模塊。
分享友人