電線短路 的英文怎麼說

中文拼音 [diànxiànduǎn]
電線短路 英文
electrical short-circuit
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • : Ⅰ形容詞(空間、時間兩端之間的距離小) short; brief Ⅱ動詞(缺少; 欠) lack; owe Ⅲ名詞1 (缺點) we...
  • : 1 (道路) road; way; path 2 (路程) journey; distance 3 (途徑; 門路) way; means 4 (條理) se...
  • 電線 : (導線) wire; electric wire; current lead
  • 短路 : [電學] short; short circuit; cutting out; direct short; short out; short pass短路保護(裝置) sho...
  1. Two kinds of new on - line monitoring methods, which are based on measuring primary, secondary currents and voltages to calculate the short - circuit reactances of windings for detecting the deformation windings of power transformer, are proposed in the paper. the methods used for on - line measuring the short - circuit reactances of traction transformer in electric railways, are designed

    本文提出了兩種在監測變壓器繞組變形的方法,通過在監測變壓器繞組原、次邊的壓和流量,實時計算變壓器繞組的抗來判斷變壓器繞組變形情況,並對氣化鐵主要接型式的牽引變壓器繞組變形的在監測方案進行了設計。
  2. The single - phase grounding fault frequently occurs in neutral ungrounded system, the fault line and fault location must be found to avoid a phase - to - phase short as soon as possible

    單相接地故障在小流接地系統中出現的比較頻繁,此時必須盡快找到故障以及大致的故障點,以避免兩相對地
  3. The mutual inductor of electric current and voltage mutual inductor play an important role in relay protection. prevent from ct differential to protect and miss movement an important subject that the generatrix is protected on the saturation, put forward two electric current pass zero hour linear to spread person who become put into differential to protect in ct in recent years, avoid ct saturation district, can judge the bus bar trouble correctly

    但是在母區外發生故障(特別是故障流含有大量非周期分量)時, ct會出現飽和現象, ct飽和后,不能正確地傳變一次側流,從而使二次流發生嚴重畸變,產生很大的差流,這樣就容易引起誤動作。防止ct飽和時差動保護誤動作一直是母保護的一個重要課題,近年來提出的在ct二次流過零時的性傳變區投入差動保護,避開ct飽和區,能對母故障做出正確判斷。
  4. In verifying of relay protection sensitivities, a network portioning method combining with graphic interface is proposed. it can online track the varieties of network, accordingly it can satisfy real - time and emulation analysis of topological configuration. with the real - time network configuration and nodal admittance matrix analyzed, the short - circuit calculation is carried out ; by means of an expert system, the verification of protection sensitivities has been achieved

    在網拓撲在快速跟蹤基礎上,進行實時結分析並形成導納矩陣,同時將計算的理論運用於在,將獲得的在計算的結果同專家系統相結合進行保護靈敏度的在校驗,最後通過友好的人機交互界面提供整個城市網全部投運保護裝置的保護靈敏度狀況。
  5. The development of a visual short circuit software under ptcad2000 is presented in this paper, as well as the system structure, the definition of the data structure, the interface to ptcad2000, the conversion of the original wiring diagram of power network to calculable power network, the implement of three sequence network, the implement of impendence matrix and admittance matrix of power network considering the zero sequence mutual inductances among lines, and the implement of short circuit calculation by using computer

    本文介紹了在ptcad2000平臺下流可視化計算軟體的開發。介紹了軟體的系統結構、數據結構定義、與ptcad2000平臺的介面、力系統原始接圖轉成等值可計算網、序網的生成、考慮零序互感阻抗時網導納矩陣和阻抗矩陣的生成,以及故障點流計算的計算機實現。
  6. For the circuit - breakers of rated voltage 252kv up, the synthetic test methods are introduced according now condition because of the limitation of the transformer short - circuit capacity. the correlative prescribes on switching line - charging current in gb / t1984 - 200x " alternating - current high - voltage circuit - breaker " are discussed according to the test results and theoretic analysis

    由於開合空載架空試驗對源側的阻抗有明確的規定,這就要求試驗源必須具有足夠大的容量,實驗室很難滿足要求,因此,一般對較高壓等級的斷器採用合成試驗方法,本文介紹了利用現有條件,對252kv以上壓等級的斷器採用合成試驗時的試驗
  7. Don ' t connect up the two wires, or there will be a short circuit

    不要把這兩條接在一起,否則會的。
  8. Main technic of giss webgiso thus function modules architecture and network topological structure are confirmed webgis system implements the basic function of electronical map, such as map zoonu pan, and the abundant query of geograph and database by using maplnfo mapxtreme for java as map server and jsp., java technico this system also can implement the routing of linesx analysing of buffer and so on0 this paper advances storage model of roads and pipelines topology data, efficiently solves the maintenace problem of network topology data of webgis and implements the shortest path algorathm based on webgis by improving it0 the system has better opening by suppling database interface of map ? the system has perfect on - line help and user forum and favorable interfaces and implementation of this system makes fundament for the further research of webgiso

    本系統利用mapinfomapxtremeforjava作為地圖服務器,採用jsp和java技術,實現了基於webgis的子地圖的縮放、漫遊等基本功能,並具有豐富的圖文定位查詢功能;實現由、緩沖區分析等輔助決策功能;構建了道拓撲數據的存儲模型,有效地解決了基於webgis的網拓撲數據的維護問題;對dijkstra演算法進行了一些改進,實現了基於webgis的最徑演算法;本系統提供了子地圖數據庫介面,使本系統具有很好的開放性和通用性; webgis系統軟體具有完善的在幫助和用戶交流論壇,人機界面友好。
  9. The problem about neutral - point - grounding mode is an all - around technical problem which associated with not only power system reliability , insulation coordination , electromagnetic interference , but assault safety 。 in china , the neutral grounding modes of the 10kv net involved of none grounding, grounding by arc suppressing coils, resistance grounding or reactance grounding in the past 。 with the development of civic power network , low resistance grounding mode was used to restrain the over voltage, particularly in guangzhou, shanghai , beijing , and zhuhai etc. it was reported that the over - voltage level of low resistance grounding mode is lower than that of arc suppressing coil mode, but the operation carried out the other way 。 at substations in guangzhou and shanghai it was found that the low resistance grounding mode is successful 。 but in some areas , such as zhuhai , substations grounding with low resistance revealed some problems , including power supply reliability rapidly dropping , transmitting line often tripping ; and person safety being threatened 。 so interiorly the grounding mode selection of the 10kv network was disputed, which mainly focused on the fault form of 10kv net grounding, the apply area of suppressing arcing coil grounding mode, power supply reliability level of the two modes, person safety, communication interfere and the workload of maintenance

    爭議點主要是在10kv網接地故障的形式、消弧圈接地的應用范圍、兩種運行方式供可靠性的高低、人身安全、通訊干擾和運行維護工作量等諸多方面。 11 17本論文就是針對以纜為主的城區10kv網中性點接地方式的選擇問題進行研究。論文首先對10kv網的中性點運行各種方式進行分析,比較各方式的特點,然後以重慶儲奇門變站10kv網的實際參數來建立數值計算模型,在考慮了網接地流變化、中性點阻取值大小、接地點接地阻值變化等多種影響因素的情況下,對中性點經消弧圈接地和經小阻接地方式下網的過壓水平和接地點流大小進行了數值計算,其計算結果與科院所作現場試驗進行了比較。
  10. That light - - looks like it ' s shortin ' out,

    光看上去好像是電線短路
  11. Research on surface and grain boundary passivation mechanism obtained effects of surface recombination on crystalline silicon solar cell performance and the theoretical expression of grain boundary recombination velocity. the limit ratio of short - circuit current increment for anti - reflection coating utilization on solar cells was obtained. the crystalline silicon solar cell spectral response, contact resistance and minority carrier lifetime measurement systems were established

    鈍化機理研究獲得了表面復合對不同表面摻雜濃度晶體硅太陽池性能的影響、表面和界面復合速度的理論表達式;研究得到了減反射膜對太陽流增量比的極限;建立了太陽池光譜響應、柵極接觸阻和少子壽命等測試系統。
  12. That light - looks like it ' s shortin ' out,

    光看上去好像是電線短路
  13. So we think the thief hot - wired the car and drove away

    那我想小偷肯定是用點火器電線短路的方法啟動汽車,把它開走了。
  14. Secondly, the following two subjects are discussed according to the calculation of short - circuit current : ( l ) to verify the dynamic stability condition of wires by using simulated annealing algorithm ( sa ), the paper calculates the maximum value of rectangle wires " short - circuit electrodynamic stress and gets the conditions of their having the maximum value. furthermore, some concerned data about the verifying of copper wires are given by analysing vibration spectrum of the electrodynamic stress ; ( 2 ) in order to get the heat withstand conditions of wires, the paper discusses some common calculation methods, and then tries to study the problem applying artificial neural network ( ann ) based on heat principle of metals. the model is shown to be feasible

    其次,在流計算的基礎上, ( 1 )進行母動穩定校驗計算:採用模擬退火演算法( sa演算法)計算了矩形母動力的最大值及其取極值的條件,獲得了更為一般的結果,進而通過動力的頻譜分析,給出了銅質母的有關校驗計算數據; ( 2 )進行母熱穩定校驗計算:討論了熱穩定校校的幾種常用計算方法,從導體或器的發熱機理出發,運用人工神經網理論對母的熱穩定問題進行計算,通過算例比較,證明該方法用於熱穩定計算是可行的。
  15. Associated tightly with the stokes measured in small capacity current breaking and short - circuit breaking test duty t100a ( short arc, middle arc and long arc ), the electric field distributions 3 ms after current zero have been calculated. the cold gas flow field corresponding with small capacity current breaking is calculated. based on the results derived from one - dimensioned gas flow field simulation, the two - dimensioned gas flow fields corresponding with short - circuit breaking test duty t100a ( short arc and middle arc ) are calculated as well

    本文採用與試驗緊密結合的方法,在給定機械行程曲的基礎上對三峽工程中採用的550kvsf6斷器在開斷小流、開斷方式5、中、長燃弧流過零后3ms內滅弧室二維靜場分佈進行了分析計算;對該斷器開斷小流時近似的冷態場進行了二維模擬分析計算;在對開斷方式5、中、長燃弧一維氣流場進行分析計算的基礎上進一步採用一維氣流場和二維氣流場相結合的方法,對該斷器開斷方式5燃弧和中燃弧對應的二維熱態場進行了分析計算。
  16. Adopt the ds18b20 ' s figure temperature sensor, take the online measure to the key eq uipment of the system ; as to the video signal in the monitoring system, since the fact that video wire is tiny, and the connector is great, especially to those relative and removable video signal, the video wire is easy to break down, such as short circuit and so on, along with the video device is over a long period of time being in the circular telegram running state, also easily running into trouble, hence, valid means to be take adopt to the video signal

    本故障分析儀採用了ds18b20數字溫度傳感器,對關鍵設備的機溫進行實時在監測;對于監控系統中的視頻信號,由於其長、徑細、轉接頭較多,尤其是那些可旋轉、移動的視頻信號,易發生視頻等情況,再加上視頻設備是長期處于通運行狀態,也易發生故障情況。因此應採用有效的方式對視頻信號進行監控。
  17. Supply by means of yi dc 24v either 15v dc power breakdown or wire connection short circuit or electric current too large

    之直流源故障或接流太大。
  18. Because the feeder short circuit current of subway is very great, the plug - in boards of input and output are different from the ac feeder protection. after analyzing and comparing the two popular input components, the thesis choices the shunt. in addition, the thesis gives the original design of output plug - in board

    由於地鐵饋流較大,保護的輸入元件及出口插件與交流保護不同,本文對目前常用的兩種輸入元件進行了分析比較后,選擇了分流器,在分析了直流快速開關動作情況的基礎上,對出口插件進行了初步設計。
  19. Fristly, according to the non - linear characteristics of twelve - phase rectifier, the thesis gives the calculation model for a short circuit in the subway traction power supply networks which provides the academic foundation for the design of the setting values and the simulation of protection. secondly, the thesis designs the dc feeder protection and control of subway, and gives the principle of setting accordingly, after it analysizes the characteristics of electric current under tow load and short circuit and considers severel factors. to validate the rationality of the design, the thesis simulates the transient electric current under two work conditions ( starting and passing the insulation ) ahd short circuit

    其次,本文在詳細分析地鐵牽引負荷流和饋故障流特點的基礎上,考慮了直流保護系統設計應注意的幾個因素,對地鐵饋保護與控制進行配置,給出了相應的保護整定原則,並針對某一地鐵供系統在詳細分析了兩種工況(機車起動與過分段絕緣)的流暫態過程,得到了流計算的數字模型,結合前面提出的模型,進行了地鐵饋保護的模擬,經模擬表明本文的保護設計是合理的。
  20. This contact is normally closed, if an error occurs short - circuit at supply voltage -, sensor or signal cable of force transducer max. output signal exceeded problems with supply voltage the output opens

    但如果有錯誤供傳感器或力傳感裝置的信號超出最大輸出壓或者供源有故障發生時,觸點的輸出打開。
分享友人