電路接地試驗 的英文怎麼說
中文拼音 [diànlùjiēdeshìyàn]
電路接地試驗
英文
earth test- 電 : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
- 路 : 1 (道路) road; way; path 2 (路程) journey; distance 3 (途徑; 門路) way; means 4 (條理) se...
- 接 : Ⅰ動詞1 (靠近;接觸) come into contact with; come close to 2 (連接; 使連接) connect; join; put ...
- 試 : 名詞(古代占卜用的器具) astrolabe
- 驗 : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
- 電路 : [訊] circuit (ckt); electric circuit; electrocircuit電路板 circuit board; 電路保持 guard of a c...
- 接地 : [電學] landing; body; ground connection; electrical grounding; grounding; earthing; earth; ground...
- 試驗 : trial; experiment; test
-
The problem about neutral - point - grounding mode is an all - around technical problem which associated with not only power system reliability , insulation coordination , electromagnetic interference , but assault safety 。 in china , the neutral grounding modes of the 10kv net involved of none grounding, grounding by arc suppressing coils, resistance grounding or reactance grounding in the past 。 with the development of civic power network , low resistance grounding mode was used to restrain the over voltage, particularly in guangzhou, shanghai , beijing , and zhuhai etc. it was reported that the over - voltage level of low resistance grounding mode is lower than that of arc suppressing coil mode, but the operation carried out the other way 。 at substations in guangzhou and shanghai it was found that the low resistance grounding mode is successful 。 but in some areas , such as zhuhai , substations grounding with low resistance revealed some problems , including power supply reliability rapidly dropping , transmitting line often tripping ; and person safety being threatened 。 so interiorly the grounding mode selection of the 10kv network was disputed, which mainly focused on the fault form of 10kv net grounding, the apply area of suppressing arcing coil grounding mode, power supply reliability level of the two modes, person safety, communication interfere and the workload of maintenance
爭議點主要是在10kv電網接地故障的形式、消弧線圈接地的應用范圍、兩種運行方式供電可靠性的高低、人身安全、通訊干擾和運行維護工作量等諸多方面。 11 17本論文就是針對以電纜為主的城區10kv電網中性點接地方式的選擇問題進行研究。論文首先對10kv電網的中性點運行各種方式進行分析,比較各方式的特點,然後以重慶儲奇門變電站10kv電網的實際參數來建立數值計算模型,在考慮了電網接地電容電流變化、中性點電阻取值大小、接地點接地電阻值變化等多種影響因素的情況下,對中性點經消弧線圈接地和經小電阻接地方式下電網的過電壓水平和接地點短路電流大小進行了數值計算,其計算結果與電科院所作現場試驗進行了比較。Counters for applications for various permits and certificates for trade or import export purposes of the agriculture, fisheries and conversation department, applications for incorporation and registration of companies, public searches of the companies registry, registration services for medical and healthcare professionals, registration and licensing services relating to chinese medicines, school dental clinics, sai ying pun dermatological clinic and chai wan social hygiene clinic of the department of health, shroff for receiving payment of debts damages of the department of justice, some support services to schools, teachers and the general public provided by the education and manpower bureau, registration services for electrical workers, lpg cylinder wagons, lifts and escalators, builders lifts tower working platforms and amusement rides provided by the electrical and mechanical services department, processing of sick leave clearance for employees claiming work injury compensation by the labour department, sections dealing with family litigation and insolvency matters and criminal matters of the legal aid department, licensing and port formalities at four marine offices and advance booking of professional ship surveying and inspection service of the marine department, services for offenders and medical social services at department of healths kowloon bay integrated treatment centre provided by the social welfare department, road driving tests and driving ability assessment services to people with disabilities provided by the transport department and customer enquiry centres and meter testing services of the water supplies department will move to a five - day week with effect from january 1, 2007
漁農自然護理署處理貿易或進出口許可證和證明書申請的櫃臺公司注冊處的申請注冊成立公司及辦理公司登記服務公眾查冊生署的醫護專業人員的注冊服務中醫藥注冊和發牌事務學童牙科診所西營盤皮膚科診所及柴灣社會生科診所律政司的接收償還債款損害賠償繳費處教育統籌局為學校教師和公眾提供的部分支援服務機電工程署的電業工程人員石油氣瓶車升降機及自動梯建築工地升降機塔式工作平臺及機動游戲機的注冊服務勞工處為申索工傷補償的雇員辦理銷假手續法律援助署負責處理家事訴訟清盤及刑事事宜的組別海事處的四個海事分處的發牌服務及關務專業船舶檢驗及檢查服務的預約服務社會福利署的違法者服務及於生署九灣綜合治療中心提供的醫務社會服務運輸署的路試駕駛考試及殘疾人士駕駛能力評估服務,以及水務署的客戶諮詢中心及水表測試服務等,都會在二零零七年一月一日起推行五天工作周。On the base of studying imaging theory of lens, the imaging theory of laser confocal scanning microscopy was analyzed in detail in this paper, and the advancement of that the optical fiber was applied to the system was described ; on the base of completed the demonstration for whole project, the experiment scheme was designed ; the relationship between the main parameters of key devices and the resolution was deduced, and the requirements of coupling efficiency and vignetting effects to optical system was analyzed ; the design of optical system and the planar scanning controlling circuit was completed ; a new method was put forward to resolved the inherent non - liner scanning problem of the galvanometer scanner by using software liner controlling in circuit design, and the perfect planar scanning was realized ; at last the low noise, high multiple and non - distortion amplify circuit of photoelectric detector was completed
本文在透鏡成像理論的基礎上,系統、深入地分析了共焦掃描顯微成像的機理,論述了應用單模光纖的激光共焦掃描顯微成像系統的優點;進行了總體方案的論證,並設計確定了單模光纖激光共焦掃描顯微成像系統的總體方案;從理論上推導分析了解析度要求與試驗系統中相關器件主要參數之間的關系,分析了系統耦合效率和漸暈現象對光學系統的設計要求;完成了方案中光學系統和二維掃描控制電路的設計,並在電路設計中採用了用軟體解決檢流計式光學掃描器(振鏡)非線性問題的新方法,能夠實現較為理想的二維模擬掃描;完成了高增益、低噪聲和低失真的探測接收系統的設計和調試。Check the connection of control circuit shall be in accordance with drawings, the continuity of each circuit, and the insulation resistance against earth
按電路圖檢查控制迴路接線正確,各迴路連續性試驗正確,對地絕緣電阻符合要求。Answer : preparative job includes : understands workplace one, the moving circumstance of 2 equipment, this job has with moving equipment without direct connection, have the job that cooperates without need with other team and group ; makes working priority discipline and the blemish that prepare to solve and weak point ; the staff member makes clear to divide the work and be familiar with the concerned data such as blueprint and test gauge cheng ; should be had the blueprint that agrees with actual state, record that examines last, newest rectify spare parts of the instrument that decides requisition, test gauge cheng, qualification, machine parts or tools kept in reserve, tool and join lead to wait ; is a few righter important equipment, especially complex protector or couplet jumps loop protector, should weave test program, working controller should fill in ticket of protection safety precaution, examine and approve via technical chief, just can carry out
答:預備的工作包括:了解工作地點一、二次設備的運行情況,本工作與運行設備有無直接聯系,與其他班組有無需要配合的工作;制定工作重點項目及預備解決的缺陷和薄弱環節;工作人員明確分工並熟悉圖紙與檢驗規程等有關資料;應具備與實際狀況一致的圖紙、上次檢驗的記錄、最新整定通知單、檢驗規程、合格的儀器、備品備件、工具和連接導線等;對一些重要設備,非凡是復雜保護裝置或有聯跳迴路保護裝置,應編制試驗方案,工作負責人應填寫繼電保護安全措施票,並經技術負責人審批,方能實施。This thesis is founded on the investigation of the ion migration of 500kv dc ceramic support insulators for the production of the 500kv dc ceramic support insulators. in the test system, we added the grounding switch for each circuit and the mutual switch, prescribed the four status of the current measuring program, making the measurement system more stabile
在對離子遷移試驗研究的過程中,對原有離子遷移試驗測量系統進行了改進,通過為每路泄漏電流迴路設置接地開關及公共測量開關,並在軟體上為測量迴路設定4種狀態,提高了測量系統的穩定性。The flexible design permits integrating interface points for grounding or testing the circuit without moving cables. junction points can also be used for arrester locations
分接母排設計靈活,允許在不移開電纜的情況下,進行接地或迴路試驗等操作。Design a udp client terminal to realize the communications between the ncex1. 0 test board and several computers. link intelligent instrument to ncex1. 0 through rs232. design client program to control intelligent instrument and gain data from intelligent instrument. the construction of ethernet - based automated measurement system : ethernet links the ncex1. 0 to the hub in lan
基於以太網的自動測試系統的組建:智能儀器的串口接到電路板的串口,電路板的以太網口接到局域網的hub上,一個電路板接一臺儀器,多個電路板就接多臺儀器,把多臺儀器連上以太網,設計相應的主控機程序來控制多臺儀器以及獲取儀器的讀數,並進行數據處理和顯示,優化測試系統的性能,並成功地做了一系列幅頻特性的自動測試實驗。Besides, the optical flux changes as a function of many mechanisms. in this case, an amplifier with agc or limited output is needed to meet the requirement of wide - ranged output voltages. when the input optical
在單片機外圍電路中,加入串口通信,本文採用max232和pc連接,根據用戶的需求可以直觀、實時地顯示出相機在試驗過程中的工作狀況。分享友人